Engineering Papers⌕ Search

Engineering topics

Saroj, P. C.

Publications and source records attributed to Saroj, P. C..

Particle in cell simulation of peaking switch for breakdown evaluation

Marx generator connected to peaking capacitor and peaking switch can generate Ultra-Wideband (UWB) radiation. A new peaking switch is designed for converting the existing nanosecond Marx generator to a UWB source. The paper explains the particle in cell (PIC) simulation for this peaking switch, using MAGIC 3D software. This peaking switch electrode is made up of copper tungsten material and is fixed inside the hermitically sealed derlin material. The switch can withstand a gas pressure up to 13.5 kg/cm{sup 2}. The lower electrode of the switch is connected to the last stage of the Marx generator. Initially Marx generator (without peaking stage) in air; gives the output pulse with peak amplitude of 113.75 kV and pulse rise time of 25 ns. Thus, we design a new peaking switch to improve the rise time of output pulse and to pressurize this peaking switch separately (i.e. Marx and peaking switch is at different pressure). The PIC simulation gives the particle charge density, current density, E counter plot, emitted electron current, and particle energy along the axis of gap between electrodes. The charge injection and electric field dependence on ionic dissociation phenomenon are briefly analyzed using this simulation. The model is simulated with different gases (N{sub 2}, H{sub 2}, and Air) under different pressure (2 kg/cm{sup 2}, 5 kg/cm{sup 2}, 10 kg/cm{sup 2}). (author)

43 PARTICLE ACCELERATORS↗

A robust and stable PLC based control system for 40kJ/25kV EMM system

This paper describes the PLC based control system developed for a 40kJ/25kV Electro-magnetic machining (EMM) system. In EMM system large capacitor banks is charged with high voltage to store large energy and the banks is made to discharge into a coil within few milli-seconds using a triggered spark gaps. During discharge of the capacitor large surges and transients are generated in the system. The control system monitors/controls and interlocks all the units of the system for proper operation. The control system is the only subsystem which is electrically connected to all the low and high voltage subsystems. Care should be taken at the signal interfacing with the control system to protect the control system. (author)

43 PARTICLE ACCELERATORS↗

Spark gaps synchronization using electrical trigger pulses

In pulse power systems, it is required to have synchronized triggering of two or more high voltage spark gaps capable of switching large currents, using electrical trigger pulses. This paper intends to study the synchronization of spark gaps using electrical trigger. The trigger generator consists of dc supply, IGBT switch and driver circuit which generates 8kV, 400ns (FWHM) pulses. The experiment was carried out using two 0.15uF/50kV energy storage capacitors charged to 12kV and discharged through stainless steel spark gaps of diameter 9 mm across 10 ohm non inductive load. The initial experiment shows that synchronization has been achieved with jitter of 50 to 100ns. Further studies carried out to reduce the jitter time by varying various electrical parameters will be presented. (author)

43 PARTICLE ACCELERATORS↗