Engineering PapersSearch

Engineering topics

Safavi, Haleh

Publications and source records attributed to Safavi, Haleh.

Battery Health Quantification for TDRS Spacecraft by Using Signature Discriminability Measurement

The NASA/GSFC Space Network Project Office (SN) currently operates a constellation of ten geosynchronous TDRS spacecraft launched over the past 30 years. The SN project collects up to 16.5 Gigabytes of telemetry every month. Generally, the spacecraft health and functionality are obtained by the use of real-time telemetry data for the multiple spacecraft subsystems, which are transmitted to the main ground station at the White Sands Complex in Las Cruces, NM. Recently, the SN has instituted a program of Big Data to analyze the large amounts of data using a variety of tools including Machine Learning, Artificial Intelligence, development of training sets, and a variety of mathematical modeling tools. The goal is to improve spacecraft management and obtain a more accurate prediction of the spacecraft end of life. The combination of these efforts with those of the Aerospace Corporation, which has a contract with the SN to produce yearly reliability estimates for the TDRS fleet, will be performed. This paper presents a new concept called telemetry quality quantification (TQQ) and discusses the progress that has been made in battery performance estimation for the second-generation TDRS spacecraft using a signature discriminability measures (SDM) algorithm combined with the Aerospace Corp. battery life estimation models. This activity is important because many of the TDRS fleet of spacecraft have exceeded their on-orbit design lifetime and, therefore, NASA must carefully manage the spacecraft to continue operations while avoiding an end-of-mission scenario that leaves a non-functioning spacecraft in geosynchronous orbit.

Ma, Kenneth Y.

Polar Coding For Forward Error Correction In Space Communications With LDPC Comparisons

With the surging development of optical telecommunicationsfor space applications, the importance of errorcorrection has become more apparent than ever. Specifically,the exploration of forward error correction code (FEC) methodologieswill be instrumental in developing the standards foroptical communications in space. Despite the widespread useof low-density parity-check (LDPC) codes, alternate FEC codessuch as polar codes have shown immense promise in assistingspace communications error correction with their ability tobypass the error floors that plague LDPC codes. Extremelypromising techniques including cyclic redundancy checks (CRC),successive cancellation (SC), and successive cancellation lists(SCL) that assist polar coding in achieving the Shannon limitin a timely manner are evaluated. MATLAB simulations areconducted with AWGN and burst noise to test each technique'sability to handle noise typically encountered in space and eachtechnique's ability to correct unexpected errors. Results ofsimulations for different rates and message lengths are alsoreported to determine each technique's ability to handle largedata volumes and fix errors. Similar simulations are conductedfor LDPC codes with additional tests for convolutional and nointerleavers. Finally, a discussion regarding the future ability ofpolar codes to satisfy current missions in the place of, or inconjunction with, LDPC codes along with the merits of eachFEC technique's ability to process data efficiently and handledata while maintaining adequate performance will be provided.Preliminary recommendations will be made for each technique'seffectiveness for GEO related missions along with discussionsregarding each technique's ability to fit within the CCSDS standards for optical communications.

Polar Coding

Operations of the Optical Communications Demonstration for the Orion EM-2 Mission

The GSFC implementation of an Optical Communication System to demonstrate an operational optical communication link for Orion EM-2. It will serve as a base for providing an operational optical communications capability for future Orion missions. GSFC plans to maintain a development path for the optical communication flight terminal to allow commercialization and implementation on future Orion missions. The Orion optical module part of the optical communications flight terminal and its control electronics have a common architecture with the ILLUMA-T optical terminal provided by GSFC for use on the ISS. The plan is to flow data from Orion through the Optical Communication Fight Terminal to the Optical Communication Ground Terminal and reverse. NASA's Orion spacecraft is an exploratory vehicle designed for longer-duration flights beyond the Moon. Following Orion's Exploration Mission-1 (EM-1), during which the spacecraft will travel beyond the Moon, enter a distant retrograde orbit around the Moon and return to Earth unmanned, Exploration Mission-2 (EM-2) will see a crewed spacecraft complete a slightly different flight path. First crewed test flight of the Orion spacecraft, currently targeting a June 30, 2022 launch. The mission involves: One revolution in Low Earth Orbit (LEO) parking orbit to verify basic Orion systems functionality and deploy solar arrays. A single 42-hour Highly Elliptical Orbit (HEO) intermediate checkout orbit allows characterization of the Orion vehicle system performance prior to committing to a cis-lunar flight. Trans Lunar Injection (TLI) burn using Orion Service Module (SM) main engine, which sends Orion on a lunar flyby and free return. Skip reentry at lunar return velocities to splashdown off the coast of San Diego. Total mission duration is approximately 10 days. EM-2 is the first crewed mission of the Orion Spacecraft that crew brings more video up/downloads, file transfers, and real-time chats with family back home and high-rate communications enables live HD streaming for Crew conferences, Public Affairs Office (PAO) events, and significant mission events. Also still collecting vehicle data on numerous Orion subsystems via Development Flight Instrumentation (DFI) allows large data volume returns sooner for DFI and future science payloads, as opposed to waiting for end-of-mission. O2O is a demonstration of operational utility system tested as a Developmental Test Objective (DTO) and not required to meet mission requirements/success/ Flight Test Objectives (FTO). EM-2 architecture is as close to future mission operational architecture as possible.Orion subsystems (video, DFI, etc.) expected to generate ~250 GB of data in the first 24 hours of flight. Total data generated over the mission estimated to be more than 400 GBUsing S-Band alone, Orion limited to ~ 6GB of data downlink per day. Because of this limitation, Orion is planning to limit live video downlinks on EM-1 in order to downlink high priority fileswith 1 hour/day of Optical Communication, Orion could downlink ~6x more data per day (~ 36GB/day).The optical communication system is capable of multiple data rates up to at least 80 Mbps downlink for the transfer of Orion data to Earth while Orion is operating in the lunar vicinity.

Optical Communication