Engineering PapersSearch

Engineering topics

Rogers, W. F.

Publications and source records attributed to Rogers, W. F..

Aerial applications dispersal systems control requirements study

Performance deficiencies in aerial liquid and dry dispersal systems are identified. Five control system concepts are explored: (1) end of field on/off control; (2) manual control of particle size and application rate from the aircraft; (3) manual control of deposit rate on the field; (4) automatic alarm and shut-off control; and (5) fully automatic control. Operational aspects of the concepts and specifications for improved control configurations are discussed in detail. A research plan to provide the technology needed to develop the proposed improvements is presented along with a flight program to verify the benefits achieved.

Bauchspies, J. S.

Pyrotechnic shock at the orbiter/external tank forward attachment

During the initial certification test of the forward structural attachment of the space shuttle orbiter to the external tank, pyrotechnic shock from actuation of the separation device resulted in structural failure of the thermal protection tiles surrounding the attachment. Because of the high shock associated with the separation bolt, the development of alternative low shock separation designs was initiated. Two concepts that incorporate a 5.08 centimeter frangible nut as the release device were developed and tested.

Rogers, W. F.

Space Shuttle separation mechanisms

The development of space shuttle separation devices is reviewed to illustrate the mechanisms involved in separating the orbiter from the Boeing 747 carrier aircraft and from the externally mounted propellant tank. Other aspects of the separation device development discussed include design evolution, operational experience during the orbiter approach and landing tests, and the work to be accomplished before an operational system becomes a reality.

Rogers, W. F.

Space shuttle separation mechanisms

The development of space shuttle separation devices is reviewed to illustrate the mechanisms involved in separating the Orbiter from the Boeing 747 carrier aircraft and from the externally mounted propellant tank. Other aspects of the separation device development discussed include design evolution, operational experience during the orbiter approach and landing tests, and the work required to produce an operational system.

Rogers, W. F.

Apollo Lunar Module Landing Gear

The Apollo lunar module landing-gear flight-performance results and three principal gear development problems are discussed. In evaluating the lunar module touchdown performance, strut stroking and toppling stability are the prime factors and are governed primarily by touchdown velocity and surface slope at the touchdown point. Flight results are shown to be well within design values, and the landing-gear has performed successfully in all landings.

Rogers, W. F.

Apollo experience report: Lunar module landing gear subsystem

The development of the lunar module landing gear subsystem through the Apollo 11 lunar landing mission is presented. The landing gear design evolved from the design requirement, which had to satisfy the structural, mechanical, and landing performance constraints of the vehicle. Extensive analyses and tests were undertaken to verify the design adequacy. Techniques of the landing performance analysis served as a primary tool in developing the subsystem hardware and in determining the adequacy of the landing gear for toppling stability and energy absorption. The successful Apollo 11 lunar landing mission provided the first opportunity for a complete flight test of the landing gear under both natural and induced environments.

Rogers, W. F.