Engineering Papers⌕ Search

Engineering topics

Reiersen, Wayne

Publications and source records attributed to Reiersen, Wayne.

First ITER CS module test results

The ITER Central Solenoid (CS) is under fabrication by the US ITER organization and its subcontractors. US ITER will supply seven modules to ITER IO, six of which will be assembled in a stack that forms the ITER Central Solenoid, with one as a spare. The first module fabrication has been completed by General Atomics (GA) at their facility and has begun testing including high voltage testing, Paschen testing in the vacuum and then testing at 4.5 K and up to 40 kA in order to demonstrate compliance of the coil to ITER requirements. In the paper we present the Test Plan and results of the CS Module performance tests, especially at 40 kA current. Herein, AC losses, joint resistances and hydraulic characteristics of the coil are all measured. Displacements of the coil height and hoop strain of the CS Module are also measured to verify structural and mechanical characteristics of the coil along with cooldown shrinkage of the coil. This information is used for verification of the stack behavior of CS in ITER operation. The test results and preliminary analyses results are presented, compared to expectations, and discussed. All measured parameters suggest that the CS module will perform well in ITER machine.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Design and Analysis of the US ITER Central Solenoid Module Lifting Fixture

The central solenoid (CS) consists of six large high field superconducting magnets (also known as modules) approximately 4 m in diameter and 2 m tall that weigh approximately 120 tonnes each. These large and complex modules create challenges during assembly of the CS that require the development of custom assembly tooling such as the CS lifting fixture. The CS module lifting fixture is designed to lift and stack the six CS modules in the assembly building on the ITER site. Because of its unique design, fabrication, and assembly features, no lifting attachments could be incorporated within or under the CS modules. This limitation motivated the development of a friction-based lift fixture. The design and evaluation of the CS module lifting fixture considered both worker safety and investment protection, and the assessments were performed to international codes and standards. The CS module lifting fixture consists of two principal subassemblies: spider assembly and ring weldment. These subassemblies allow the frictional force to be augmented by the mechanical advantage of shallow-angle wedges. Large radial preloads created by both screw jack assemblies and the weight of a CS module develop frictional forces capable of performing a lift with a safety factor of at least 2. The design effort resulted in the use of low friction linear bearings on angle surfaces to ensure constant pressure, integrated jacks for pretensioning the fixture prior to lifting, and load pin strain gauges for monitoring the normal force. Testing of various materials and surface treatments led to the selection of laminated aluminum and rubber pads as the friction interface on the CS lifting fixture side and a grit-blasted Nitronic 50 stainless steel band on the CS module side. A redundant lifting method using the module slings between the spider and module is also utilized after the initial friction lift. The CS lifting fixture provides a safe and reliable solution for lifting and stacking the CS module during assembly.

Morris, Eric↗

Qualification of the U.S. Conductors for ITER TF Magnet System

The U.S. Domestic Agency is one of the six suppliers of the toroidal field (TF) conductor for ITER. To qualify conductors per ITER requirements, we prepared or provided to the Swiss Plasma Center (SPC) eight test articles, sixteen conductors total, that were tested in the SULTAN facility at SPC in the ITER relevant conditions. The strands that were used in these SULTAN samples were fully characterized in the laboratories. In this paper, we report both test results and analysis of the conductors' performance against expected strand performance. The U.S. TF conductors showed a slightly better than average current sharing temperature and a relatively low sensitivity to warm up-cooldown cycles in comparison with other suppliers' conductors. However, the trend in current sharing temperature versus cycles and warm ups did not saturate, which means a continuing slow degradation of the conductor performance if the number of warm up and cooldown cycles will be significantly higher than expected. The ac losses in the U.S. TF conductors are in line with losses in the other TF conductor suppliers.

Martovetsky, Nicolai↗

US ITER Moving Forward

US ITER Project Manager Ned Sauthoff, joined by Wayne Reiersen, Team Leader Magnet Systems, and Jan Berry, Team Leader Tokamak Cooling System, discuss the U.S.'s role in the ITER international collaboration.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗