Engineering Papers⌕ Search

Engineering topics

Reese, Ed

Publications and source records attributed to Reese, Ed.

Magnetic Measurement Results of the LCLS Undulator Quadrupoles

This note details the magnetic measurements and the magnetic center fiducializations that were performed on all of the thirty-six LCLS undulator quadrupoles. Temperature rise, standardization reproducibility, vacuum chamber effects and magnetic center reproducibility measurements are also presented. The Linac Coherent Light Source (LCLS) undulator beam line has 33 girders, each with a LCLS undulator quadrupole which focuses and steers the beam through the beam line. Each quadrupole has main quadrupole coils, as well as separate horizontal and vertical trim coils. Thirty-six quadrupoles, thirty-three installed and three spares were, manufactured for the LCLS undulator system and all were measured to confirm that they met requirement specifications for integrated gradient, harmonics and for magnetic center shifts after current changes. The horizontal and vertical dipole trims of each quadrupole were similarly characterized. Each quadrupole was also fiducialized to its magnetic center. All characterizing measurements on the undulator quads were performed with their mirror plates on and after a standardization of three cycles from -6 to +6 to -6 amps. Since the undulator quadrupoles could be used as a focusing or defocusing magnet depending on their location, all quadrupoles were characterized as focusing and as defocusing quadrupoles. A subset of the undulator quadrupoles were used to verify that the undulator quadrupole design met specifications for temperature rise, standardization reproducibility and magnetic center reproducibility after splitting. The effects of the mirror plates on the undulator quadrupoles were also measured.

43 PARTICLE ACCELERATORS↗

LCLS Undulator Quadrupole Fiducialization Plan

This note presents the fiducialization plan for the LCLS undulator quadrupoles. The note begins by summarizing the requirements for the fiducialization. A discussion of the measurement equipment is presented, followed by the methods used to perform the fiducialization and check the results. This is followed by the detailed fiducialization plan in which each step is enumerated. Finally, the measurement results and data storage formats are presented. The LCLS is made up of 33 assemblies consisting of an undulator, quadrupole, beam finder wire, and other components mounted on a girder. The components must be mounted in such a way that the beam passes down the axis of each component. In this note, we describe how the ideal beam axis is related to tooling balls on the quadrupole. This step, called fiducialization, is necessary because the ideal beam axis is determined magnetically, whereas tangible objects must be used to locate the quadrupole. The note begins with the list of fiducialization requirements. The laboratory in which the work will be performed and the relevant equipment is then briefly described. This is followed by a discussion of the methods used to perform the fiducialization and the methods used to check the results. A detailed fiducialization plan is presented in which all the steps of fiducialization are enumerated. A discussion of the resulting data files and directory structure concludes the note.

43 PARTICLE ACCELERATORS↗

Girder Alignment Plan

The girders for the LCLS undulator system contain components which must be aligned with high accuracy relative to each other. The alignment is one of the last steps before the girders go into the tunnel, so the alignment must be done efficiently, on a tight schedule. This note documents the alignment plan which includes efficiency and high accuracy. The motivation for girder alignment involves the following considerations. Using beam based alignment, the girder position will be adjusted until the beam goes through the center of the quadrupole and beam finder wire. For the machine to work properly, the undulator axis must be on this line and the center of the undulator beam pipe must be on this line. The physics reasons for the undulator axis and undulator beam pipe axis to be centered on the beam are different, but the alignment tolerance for both are similar. In addition, the beam position monitor must be centered on the beam to preserve its calibration. Thus, the undulator, undulator beam pipe, quadrupole, beam finder wire, and beam position monitor axes must all be aligned to a common line. All relative alignments are equally important, not just, for example, between quadrupole and undulator. We begin by making the common axis the nominal beam axis in the girder coordinate system. All components will be initially aligned to this axis. A more accurate alignment will then position the components relative to each other, without incorporating the girder itself.

43 PARTICLE ACCELERATORS↗

Undulator Changes Due To Temperature Excursions

The temperature of the LCLS undulators has not been controlled during storage. The effects of the temperature excursions are documented in this note. After a number of LCLS undulators were tuned, fiducialized, and placed in storage anticipating their use, a test was made to ensure that their properties had not changed. The test revealed, however, that indeed the undulators had changed. Detailed study of this problem followed. We now believe that the gap of the undulators changes permanently when the undulators go through temperature excursions. We have tested the other possible cause, transportation, and do not see gap changes. In this note, we document how the undulators have changed since they were originally tuned. The undulators were tuned and fiducialized in the Magnetic Measurement Facility (MMF). Afterward, many of them (approximately 18) were taken to building 750 for storage during summer and fall 2007. Building 750 had no temperature control. The undulator temperatures went from 20 C, used for tuning, down to approximately 11 C during the winter. In January 2008, three of the undulators were brought back to the MMF for a check. All three undulators showed similar changes. Trajectories, phases, and most undulator properties stayed the same, but the fiducialization (beam axis position relative to tooling balls on the undulator) had changed. Further investigation showed that the undulator gap was altered in a periodic way along the magnetic axis with a net average gap change causing the fiducialization change. A new storage location in building 33 was found and future undulators were placed there. A failure in the temperature control, however, caused the undulators to get too hot. Again the gap changed, but with a different periodic pattern. This note documents the measured changes in the undulators. In particular, it shows the detailed history of undulator 39 which went through both negative and positive temperature excursions.

43 PARTICLE ACCELERATORS↗

Undulator Transportation Test Results

A test was performed to determine whether transporting and handling the undulators makes any changes to their properties. This note documents the test. No significant changes to the test undulator were observed. After the LCLS undulators are tuned and fiducialized in the Magnetic Measurement Facility (MMF), they must be transported to storage buildings and transported to the tunnel. It has been established that the undulators are sensitive to temperature. We wish to know whether the undulators are also sensitive to the vibrations and shocks of transportation. To study this issue, we performed a test in which an undulator was measured in the MMF, transported to the tunnel, brought back to the MMF, and re-measured. This note documents the test and the results.

Wolf, Zachary↗