Engineering Papers⌕ Search

Engineering topics

Ratti, A.

Publications and source records attributed to Ratti, A..

Development and Performance of RFD Crab Cavity Prototypes for HL-LHC AUP

The US will be contributing to the HL-LHC upgrade at CERN with the fabrication and qualification of RFD crabbing cavities in the framework of the HL-LHC Accelerator Upgrade Project (AUP) managed by Fermilab. AUP received Critical Decision 3 (CD-3) approval by DOE in December 2020 launching the project into the production phase. The electro-magnetic design of the cavity was inherited from the LHC Accelerator Research Program (LARP) but needed to be revised to meet new project requirements and to prevent issues encountered during beam tests performed at CERN in the R&D phase. Two prototype cavities were manufactured in industry and cold tested. Challenges specific to the RFD cavity were the stringent interface tolerances, the pole symmetry, and the higher-order-mode impedance spectrum. Chemical processing and heat treatments were performed initially at FNAL/ANL and are now being transferred to industry for the production phase. HOM dampers are manufactured and validated by JLAB. A summary of cold test results with and without HOM dampers is presented.

43 PARTICLE ACCELERATORS↗

Commissioning the JLab LERF Cryomodule Test Facility

The JLab Low Energy Recirculating Facility, LERF, has been modified to support concurrent testing of two LCLS-II cryomodules. The cryomodules are installed in a similar fashion as they would be in the L1 section of the LCLS-II linac, including the floor slope and using all of the LCLS-II hardware and controls for cryomodule cryogenics, vacuum, and RF (SSA and LLRF). From the start, it was intended to use LCLS-II electronics and EPICS software controls for cryomodule testing. In affect the LERF test facility becomes the first opportunity to commission and operate the LCLS-II LINAC hardware and software controls. Support for specific cryomodule high level test applications like Q0 and HOMs measurements, are being developed from the basic cryomodule control suite. To support the testing, 2 K He is supplied from the CEBAF south linac cryogenic system, where care must be taken when using the LERF test facility to not upset the CEBAF cryogenics plant. This paper discusses the commissioning of the hardware and software development for testing the first two LCLS-II cryomodules.

Hovater, C.↗

Simulation of beam–beam interaction with crab cavities for $\mathrm{LHC}$ upgrade

The crab cavities are a critical component in the high luminosity LHC upgrade project to compensate the luminosity loss from large crossing angle collision. However, these crab cavities will not be perfect in the real accelerator. In this paper, we studied the effects of crab cavity imperfections on colliding beam luminosity lifetime degradation for the LHC upgrade through detailed numerical simulations. Our simulation results suggest that the white noise jitter in the crab cavity RF phase and voltage rms amplitudes should be kept below a few 10 -5 for a good luminosity lifetime, while with frequency-dependent jitter, the amplitudes should be kept below a few 10 -4 for a good lifetime. As a result, the RF multipole errors in the current crab cavity designs are small enough and would not cause extra luminosity degradation.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Cascading RF deflectors in compact beam spreader schemes

This study describes beam distribution schemes based on transverse electric field radio-frequency deflectors (RFD) as fast-switching devices and provides numerical relationships between their respective frequencies and phases. The adoption of compact transverse deflecting cavities represents an ideal solution for the design of high repetition rate ( > 1 MHz), compact beam distribution systems. While directly applicable to modern FEL facilities, this approach also provides opportunities for expanding existing beam delivery systems with additional experimental areas simultaneously feeding multiple beamlines. We derive the formalism for cascading RFDs by adopting the proper choice of deflector frequencies which can generate a large variety of beam switch yard topologies. Finally, we present for reference a potential application operating at an rf frequency of 325 MHz with the comparison of three possible distinct compact rf deflectors: a superconducting rf-dipole, a normal conducting rf-dipole, and a normal conducting 4-rod design.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

RF Systems

Chapter 4 in High-Luminosity Large Hadron Collider (HL-LHC). The Large Hadron Collider (LHC) is one of the largest scientific instruments ever built. Since opening up a new energy frontier for exploration in 2010, it has gathered a global user community of about 7,000 scientists working in fundamental particle physics and the physics of hadronic matter at extreme temperature and density. To sustain and extend its discovery potential, the LHC will need a major upgrade in the 2020s. This will increase its luminosity (rate of collisions) by a factor of five beyond the original design value and the integrated luminosity (total collisions created) by a factor ten. The LHC is already a highly complex and exquisitely optimised machine so this upgrade must be carefully conceived and will require about ten years to implement. The new configuration, known as High Luminosity LHC (HL-LHC), will rely on a number of key innovations that push accelerator technology beyond its present limits. Among these are cutting-edge 11-12 tesla superconducting magnets, compact superconducting cavities for beam rotation with ultra-precise phase control, new technology and physical processes for beam collimation and 300 metre-long high-power superconducting links with negligible energy dissipation. The present document describes the technologies and components that will be used to realise the project and is intended to serve as the basis for the detailed engineering design of HL-LHC.

43 PARTICLE ACCELERATORS↗