Status of the MARS Code
This report describes major features of the most recent version of MARS code as well as ongoing developments.
Engineering topics
Publications and source records attributed to Rakhno, Igor L..
This report describes major features of the most recent version of MARS code as well as ongoing developments.
The 25-kW beam absorber in the Linac-to-Booster transfer line is supposed to take in the beam from PIP-II 800-MeV Linac occasionally, on the average for one hour once a week. Such an operational scenario suggests that residual dose of the absorber front part can be relatively low. In order to simplify access to the front part of the absorber and beam window in case of repair or maintenance, using a slide-in shielding plug is considered as a preferred option.
The studies described below have been performed for NuMI Accelerator Improvement Project (NuMI AIP). This work has been done to extend previous studies and address new issues encountered as the project evolves. The calculations have been performed for both normal operation and an accident scenario.
Electromagnetic and hadron showers generated by electrons of dark current (DC) can represent a significant radiation threat to the ILC linac equipment and personnel. In this study, a commissioning scenario is analysed which is considered as the worst-case scenario for the main linac regarding the DC contribution to the radiation environment in the tunnel. A normal operation scenario is analysed as well. An emphasis is made on radiation load to sensitive electronic equipment—cryogenic thermometers inside the cryomodules. Prompt and residual dose rates in the ILC main linac tunnels were also calculated in these new high-statistics runs. A novel approach was developed—as a part of general purpose Monte Carlo code MARS15—to model generation, acceleration and transport of DC electrons in electromagnetic fields inside SRF cavities. Comparisons were made with a standard approach when a set of pre-calculated DC electron trajectories is used, with a proper normalization, as a source for Monte Carlo modelling. Results of MARS15 Monte Carlo calculations, performed for the current main linac tunnel design, reveal that the peak absorbed dose in the cryogenic thermometers in the main tunnel for 20 years of operation is about 0.8 MGy. The calculated contact residual dose on cryomodules and tunnel walls in the main tunnel for typical irradiation and cooling conditions is 0.1 and 0.01 mSv/hr, respectively.
Abstract Not Provided
Abstract Not Provided
Results of detailed Monte Carlo energy deposition studies performed for the LBNE absorber core and the surrounding shielding with the MARS15 code are described. The model of the entire facility, that includes a pion-production target, focusing horns, target chase, decay channel, hadron absorber system – all with corresponding radiation shielding – was developed using the recently implemented ROOT-based geometry option in the MARS15 code. This option provides substantial flexibility and automation when developing complex geometry models. Both normal operation and accidental conditions were studied. Various design options were considered, in particular the following: (i) filling the decay pipe with air or helium; (ii) the absorber mask material and shape; (iii) the beam spoiler material and size. Results of detailed thermal calculations with the ANSYS code helped to select the most viable absorber design options.