Engineering Papers⌕ Search

Engineering topics

Prescott, Steven R.

Publications and source records attributed to Prescott, Steven R..

Light Water Reactor Sustainability Program: Upgrade of EMRALD to a Modern JavaScript-based Framework

Event Modeling Risk Assessment using Linked Diagrams (EMRALD) is a software tool developed at Idaho National Laboratory for researching the capabilities of dynamic probabilistic risk assessment. It provides a simple interface to represent complex interactions often seen when developing dynamic models. EMRALD can also interface with other applications by modifying inputs, running, and using their results within EMRALD for dynamic and integrated assessment. This report goes over the work performed as part of the Risk-Informed Systems Analysis Pathway under the Light Water Reactor Sustainability program to upgrade the EMRALD software.

97 MATHEMATICS AND COMPUTING↗

EMRALD Technology Advancements for Commercial Grade Dedication Readiness

Event Modeling Risk Assessment using Linked Diagrams (EMRALD) is a software tool developed at Idaho National Laboratory for researching the capabilities of dynamic probabilistic risk assessment. It provides a simple interface to represent complex interactions often seen when developing dynamic models. EMRALD can also interface with other applications by modifying inputs as well as running and using their results within EMRALD for dynamic and integrated assessment. To enable wider industry use cases, collaborative work between Idaho National Laboratory and FPoliSolutions was performed through the technology commercialization fund TCF-20-21448. This report covers the additional features and capabilities developed under this work.

97 MATHEMATICS AND COMPUTING↗

Analysis of Tasks in Autonomous Systems Using the EMRALD Dynamic Risk Assessment Tool

An autonomous system refers to the system that has the power and ability for self-governance in the performance of system functions. Autonomous systems have been actively pursued in a variety of domains such as automotive, aviation, maritime, medicine, and nuclear fields. As an unmanned concept employing the highest automation level, the autonomous system basically performs most of the work in normal operations or emergency situations. However, despite advances in technology, many researchers have noted these systems still require human actions. The nature of human actions on autonomous systems is different than the human actions that are considered in existing systems. Nevertheless, only a few studies have been conducted on 1) characterizing the different types of errors and risks associated with human actions interacting with autonomous systems and 2) how to evaluate human actions in the autonomous operations. As a starting point, this study aims to investigate differences of tasks in autonomous operation compared to those in existing nuclear power plant operation using the Event Modeling Risk Assessment Using Linked Diagram (EMRALD) software. In this paper, insights aspect of human error and time are derived out and discussed based on the output of the EMRALD models.

99 GENERAL AND MISCELLANEOUS↗

Approach and Model Used to Represent a Timeline Analysis for Security Design Enhancements

Next-generation reactors will be able to use risk to inform and performance base the licensing of many aspects of the reactor, facility, and site design, including attributes of physical security. There are several factors related to security, including site topography, reactor design, and physical protection system components, to consider when designing the physical protection system into the overall facility design and plan of operation. With the versatility of advanced reactors, especially micro reactors, methods are needed to simplify and quickly evaluate potential timelines for designing a site configuration. This report describes an approach to generate qualitative and quantitative insights using a risk-informed simulation. The modeling process is described in detail, focusing on three aspects: (1) the facility mission time (the time required to control the plant until safe), (2) the attacker timeline (the time to potential sabotage), and (3) the response timeline (the time to counter the facility attack). The modeling capabilities also are extended to include facility physical phenomena such as thermal-hydraulics and heat transfer to capture realistic representation of dynamic changes to a facility. While the plant models and examples are hypothetical and do not represent a real facility, these modeling approaches could be used for future security-by-design engineering in advanced reactors. The outputs and insights from the modeling approach may be used to modify and optimize the security posture of a facility by efficiently making modifications to the model and seeing the overall impact from the modification. Lastly, use of the approach described in this report can also provide the technical basis for a physical protection program, describing how the facility and security strategy will cope with off-normal events.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Investigating Application of LiDAR for Nuclear Power Plants

Many evaluation, assessment, and modeling tasks at nuclear power plants require spatial in-formation; this often requires physical visits to locations within the facility because the 2D or 3D schematics and current models do not contain enough detail or do not capture as-built and real-world conditions. These visits require extensive manual labor for not only the requesting party, but also support groups, such as security. Light Detection and Ranging (LiDAR) mapping is trying to solve that problem by providing very detailed 3D models for low costs. However, the use of these models can be very limited because either component reference information is missing and too costly to add or there is no way to extract specific spatial data needed for other tools. This report outlines two main efforts. First, to reduce the effort of “Tagging” data in large 3D models, a general Application Programming Interface (API) was developed to import a variety of existing plant database information into a 3D-visualization engine. Filters allow the user to have only zone-specific items listed; then, they can simply click and assign the information to a specific spot or component in the 3D model. The second part of the work is the development of an interface for importing pieces from the3D-LiDAR model into other systems needed for modeling and simulation, outlined around fire modeling. This interface allows for the retrieval of item location and boundaries, enabling the auto generation of models for varying tools.

3D Modelling↗

Enhancement of Industry Legacy Probabilistic Risk Assessment Methods and Tools

Probabilistic risk assessments (PRAs) are integral to nuclear power plant (NPP) operations, having tremendously benefitted the safety of the U.S. reactor fleet for decades. Insights obtained from the models have provided perspectives on a variety of applications, both at the plant and for the regulator. While these models are very useful, they are now being asked to represent and analyze aspects of the plant that were never envisioned by the initial PRA practitioners. Furthermore, heightened demands on the PRA models have led to increased computing power requirements. Additionally, as the complexity of the PRA models increased, the difficulty experienced by non-PRA experts in trying to understand these models, grasp the insights they provide, and effectively use that information has become problematic. The need for research to address key issues regarding PRA tools and methods has never been greater. Although the nuclear power industry has largely been well-served by these tools and methods, the underlying science is dated, remaining mostly unchanged for over two decades. Three areas were identified as most beneficial to address to maintain and improve the usefulness of the current practice legacy PRA tools: improvement in quantification speed, increased ability to efficiently model multi-hazard models, and improvement in modeling human action dependency in PRA. This report provides the outcomes from the FY2021 research into these three areas, identifying potential technical gaps and solutions, and charting the next steps forward to address current PRA challenges.

42 ENGINEERING↗

Industry Level Integrated Fire Modeling Using Fire Risk Investigation in 3D (FRI3D)

The software Fire Risk Investigation in 3D (FRI3D) has been developed over the last 2 years to integrate 3D spatial modeling with existing fire probabilistic risk assessment (PRA) models and fire simulation codes. The goal of this research and development is to automate many of the fire analysis manual tasks to reduce industry efforts in the initial fire modeling and operational costs for the model maintenance and evaluations required during normal plant operations. The tasks for Fiscal Year (FY) 2021 include first testing the FRI3D modeling capabilities by importing an industry fire model into FRI3D and making a 3D model of a complex/high-risk significant area. (For this work, the switchgear room was chosen.) Then, the second task of FY 2021 is to develop a dynamic fire PRA process that can help optimize traditional fire PRA models. The switchgear room model will be used for the dynamic fire PRA work. This report describes the work and insights learned when using FRI3D software to model both a Nuclear Regulatory Report (NUREG) example models and a full industry switchgear room.

97 MATHEMATICS AND COMPUTING↗

Risk Importance Ranking of Fire Data Parameters to Enhance Fire PRA Model Realism

Fire is historically and analytically a significant contributor to nuclear power plant risk. The level of fire risk and the methods, tools and data for modeling this risk is highly debated by experts. One area of debate is the input data used in fire modeling and how to deal with this data’s high uncertainty. This report outlines initial work performed for determining the key parameters causing this uncertainty and how it propagates into nuclear power plant models. This research paves the way for the development of methods to reduce fire data uncertainty used in modeling. The Nuclear Regulatory Commission has mandated that nuclear power plants perform fire risk modeling. However, there are several issues with the current risk modeling implementation that affect the results. Approved modeling methods can be overly conservative and often do not match plant experience. Also, the data used in the modeling can have high uncertainties and is influenced by expert judgement. To evaluate input data uncertainty, researchers performed an initial review of several fire experiments done at Sandia National Laboratories. Uncertainties for fire data can come from many sources, such as experiment design constraints, environmental conditions, or other plant-specific aspects. There are many different significant and insignificant parameters driving the uncertainty. Additionally, the uncertainty of the different input data used in the fire modeling could have a significant or insignificant effect on the entire plant risk. A four-step methodology was developed to perform Integrated Probabilistic Risk Assessment Importance Ranking. A demonstration case using these steps was set up and three of the four steps were completed in fiscal year (FY) 2019 and the fourth step done FY 2020. These steps are: 1. The qualitative analysis of potential sources was conducted with the following items identified for the demonstration. • Maximum heat release rate • Time to maximum heat release rate • Duration of max heat release rate • Time to decay • Thermal conductivity of concrete • Specific heat of concrete • Density of concrete • Cable jacket thickness 2. A quantitative characterization of dominant sources of uncertainty was performed. A list of distributions and determined values of the dominant sources is shown in Appendix A. 3. A quantitative screening of the potential sources of uncertainty using Morris Elementary Effects Analysis was completed. An experimental model using the physics-based fire modeling tool Fire Dynamics Simulator was developed and coupled with the Risk Analysis Virtual Environment. The Morris analysis identified at least two parameters that can be eliminated as significant contributors (specific heat of concrete and cable jacket thickness). 4. Global importance measure (Global IM) analysis to generate a comprehensive ranking based on their influence on the plant risk. In this research, a moment-independent Global IM is used since it can address (a) uncertainty in the input parameters of the fire model, (b) uncertainty in the risk outputs, and (c) non-linearity and interactions among input parameters in the fire model, more accurately than the correlation-based and variance-based global methods. The observations from the research showed that, depending on the initial and boundary conditions of the fire scenarios, fire-induced damage could have a very small probability and could be dominated by the tail of the uncertainty distribution; hence, the accuracy of the correlation-based and variance-based methods is questionable. The moment-independent Global IM analysis in this research provides a better understanding of how experimental uncertainty data affects industry’s plant models and where improvements in that data will have the largest benefit for improving fire modeling accuracy in causing core damage. Among the five unscreened parameters obtained from the Morris EE analysis, the Global IM analysis results for the case study indicated that max heat release rate and fire location are the most important parameters. The report also outlines benefits of using a unified computational platform that integrates the underlying simulations (e.g., a fire progression model), quantitative screening (using the Morris EE method), and the Global IM analysis. A unified platform can (i) facilitate the ranking of input parameters considering multiple key fire scenarios simultaneously, rather than considering one scenario at a time, (ii) contribute to more explicit and accurate treatment of dependencies at multiple levels of Fire PRA, (iii) facilitate the sampling-based uncertainty quantification for Fire PRA, and (iv) help generating both “industry-wide” and "plant-specific" ranking of uncertainty sources in Fire PRA. Future research should be done to include additional parameters such as detection/suppression or cable fire spread. Adding a PRA software such as SAPHIRE to the RAVEN platform would help with plant model integration and improve treatment of fire-induced dependency. The I-PRA risk importance ranking methodology offered in this report can provide valuable information for efficiently (a) enhancing the realism of Fire PRA for existing plants and (b) supporting the development of Dynamic Fire PRA for advanced reactors and new plants.

97 MATHEMATICS AND COMPUTING↗

Current Challenges, Constraints and Recommendations for Reducing Cost of Physical Security at US Commercial Nuclear Power Plants

Economic or financial causes have led to closure or announced early retirement of several US nuclear reactors in the last five years. The published report "Economic and Market Challenges Facing the U.S. Nuclear Commercial Fleet – Cost and Revenue Study" by Idaho National Laboratory identified 63 of the 79 studied nuclear power plants (NPPs) lost money in the year 2016. The revenue gap analysis performed in the study also concluded that additional revenue is required to return most of these nuclear power units to profitable operations. This can be achieved by reducing operation and maintenance (O&M) costs that accounts for about 70% of total operating expenditures for an NPP. The Light Water Reactor Sustainability (LWRS) Program conducts research and development, sponsored by the US Department of Energy, that provides a technical foundation for licensing and managing the long-term safe and economical operation of current nuclear power plants, utilizing the unique capabilities of the national laboratory system. Reduction in O&M costs aligns with the LWRS program’s mission of providing science-based solutions to the nuclear industry to implement technologies and methodologies for safe, efficient, economical, and long-term operation.

97 MATHEMATICS AND COMPUTING↗

RISA Industry Use Case Analysis

This report provides a status of development of utility RISA Use Case applications for which potential sponsoring utility partners have been identified. These applications were developed with utility participation during meetings held at Idaho National Laboratory (INL) on 15 May 2018. Each of these Use Case applications meets the needs of both plant owner / operators and the objectives of the LWRS Program. These applications also meet the needs of the host utilities and the overall industry in that they can be accomplished within a timeframe that can provide economic value to both the sponsoring host utility and the current operating fleet. In particular, the methods and tools that will be developed during these Use Case applications are be designed with the intent that they can be in place and supporting near term resolution of the issue (i.e. within the next 5 years) across the industry.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Multi-Hazard Advanced Seismic Probabilistic Risk Assessment Tools and Applications

Design of nuclear power plant (NPP) facilities to resist natural hazards has been a part of the regulatory process from the beginning of the NPP industry in the United States (US), but has evolved substantially over time. The original set of approaches and methods was entirely deterministic in nature and focused on a traditional engineering margins-based approach. However, over time probabilistic and risk-informed approaches were also developed and implemented in US Nuclear Regulatory Commission (NRC) guidance and regulation. A defense-in-depth framework has also been incorporated into US regulatory guidance over time. As a result, today, the US regulatory framework incorporates deterministic and probabilistic approaches for a range of different applications and for a range of natural hazard considerations. This framework will continue to evolve as a result of improved knowledge and newly identified regulatory needs and objectives, most notably in response to the NRC activities developed in response to the 2011 Fukushima accident in Japan. Although the US regulatory framework has continued to evolve over time, the tools, methods and data available to the US nuclear industry to meet the changing requirements have not kept pace. Notably, there is significant room for improvement in the tools and methods available for external event probabilistic risk assessment (PRA), which is the principal assessment approach used in risk-informed regulations and risk-informed decision-making applied to natural hazard assessment and design. This is particularly true if PRA is applied to natural hazards other than seismic loading. Development of a new set of tools and methods that incorporate current knowledge, modern best practice, and state-of-the-art computational resources would lead to more reliable assessment of facility risk and risk insights (e.g., the SSCs and accident sequences that are most risk-significant), with less uncertainty and reduced conservatisms.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Demonstration of External Hazards Analysis

This initial demonstration shows the capabilities of the baseline RISMC toolkit and better quantification of the safety margins of the analyzed nuclear power plant model.

31274↗

Cloud-based Architecture Capabilities Summary Report

In collaborating scientific research arena it is important to have an environment where analysts have access to a shared of information documents, software tools and be able to accurately maintain and track historical changes in models. A new cloud-based environment would be accessible remotely from anywhere regardless of computing platforms given that the platform has available of Internet access and proper browser capabilities. Information stored at this environment would be restricted based on user assigned credentials. This report reviews development of a Cloud-based Architecture Capabilities (CAC) as a web portal for PRA tools.

97 MATHEMATICS AND COMPUTING↗