Engineering Papers⌕ Search

Engineering topics

Poudel, Anju

Publications and source records attributed to Poudel, Anju.

Rugged bialkali photocathodes encapsulated with graphene and thin metal film

Protection of free-electron sources has been technically challenging due to lack of materials that transmit electrons while preventing corrosive gas molecules. Two-dimensional materials uniquely possess both of required properties. Here, we report three orders of magnitude increase in active pressure and factor of two enhancement in the lifetime of high quantum efficiency (QE) bialkali photocathodes (cesium potassium antimonide (CsK 2 Sb)) by encapsulating them in graphene and thin nickel (Ni) film. The photoelectrons were extracted through the graphene protection layer in a reflection mode, and we achieved QE of ~ 0.17% at ~ 3.4 eV, 1/e lifetime of 188 h with average current of 8.6 nA under continuous illumination, and no decrease of QE at the pressure of as high as ~ 1 × 10 –3 Pa. In comparison, the QE decreased drastically at 10 –6 Pa for bare, non-protected CsK 2 Sb photocathodes and their 1/e lifetime under continuous illumination was ~ 48 h. We attributed the improvements to the gas impermeability and photoelectron transparency of graphene.

36 MATERIALS SCIENCE↗

LAMP Manufacturing Survey [Slides]

The LANL Accelerator Strategy Office (ASO) requires the support of AOT-MDE to perform a trade study on the current manufacturing capabilities required to modernize the Los Alamos Neutron Science Center (LANSCE). The purpose of the study will be to identify and potentially minimize cost and schedule risks that could impact the LANSCE Modernization Project (LAMP).

43 PARTICLE ACCELERATORS↗

LAMP Manufacturing Survey (Final Report)

This report presents the results of a market manufacturing survey performed for fabricating radiofrequency quadrupoles (RFQ) and Drift Tube Linear Accelerator (DTL) components needed for the Los Alamos Neutron Science Center (LANSCE) Modernization Project (LAMP). A review on existing RFQs and DTLs with their parameters, a summary of specific capabilities needed to manufacture them, the common issues during the fabrication process, their consequences, and resolutions to these problems is presented in this report. The goal of this study is to identify potential collaborators and companies capable of manufacturing the necessary accelerator equipment, while minimizing cost and schedule risks that could impact the future modernization of the LANSCE facility.

43 PARTICLE ACCELERATORS↗