Interconnection Cost Analysis in ISO-New England

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 194 projects in New England from interconnection studies performed between 2010 and 2021. Project-level cost summary data are available for download on this page. We find: -Interconnection costs have grown over time, especially for projects that withdraw. -Interconnection costs are highest for onshore wind, followed by solar and storage. Natural gas and offshore wind projects tend to cost less to interconnect, in comparison. -Economies of scale exist for solar and possibly storage projects, but not for other resource types. -Wind and solar projects requesting capacity network resource interconnection service have higher interconnection costs, despite being evaluated using the same interconnection standard in the analyzed studies. -Low and high interconnection costs can be found throughout the ISO-NE footprint. -Costs are split fairly evenly between investments at the point of interconnection and within the broader network for active and withdrawn projects, while complete projects incur most costs at the point of interconnection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Generator Interconnection Cost Analysis in the Southwest Power Pool (SPP) Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 845 projects from interconnection studies for the Southwest Power Pool (SPP) Territory. The studies were performed between 2002 and 2023 and include all of the most refined cost estimates available. Project-level cost summary data are available for download on this page. We find: -Project-specific interconnection costs can differ widely. -Average interconnection costs are stable for projects that complete all interconnection studies but have escalated for those that withdraw. -Broader network upgrade costs are the primary driver of recent cost increases, especially for withdrawn projects. -Potential interconnection costs of all solar and wind requests have been greater than those of storage and natural gas projects. -Economies of scale exist for completed wind and solar projects but not for other fuel types or withdrawn projects. -Interconnection costs vary by location. Berkeley Lab publishes a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interconnection Cost Analysis in the PJM Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the PJM Territory, representing nearly 86% of all new unique generators requesting interconnection from 2000 to 2022. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Generator Interconnection Cost Analysis in the Midcontinent Independent System Operator (MISO) territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the Midcontinent Independent System Operator (MISO), representing nearly 50% of all projects requesting interconnection from 2010 to 2020. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗