Vibrational measurement for commissioning SRF Accelerator Test Facility at Fermilab

The commissioning of two cryomodule components is underway at Fermilab's Superconducting Radio Frequency (SRF) Accelerator Test Facility. The research at this facility supports the next generation high intensity linear accelerators such as the International Linear Collider (ILC), a new high intensity injector (Project X) and other future machines. These components, Cryomodule No.1 (CM1) and Capture Cavity II (CC2), which contain 1.3 GHz cavities are connected in series in the beamline and through cryogenic plumbing. Studies regarding characterization of ground motion, technical and cultural noise continue. Mechanical transfer functions between the foundation and critical beamline components have been measured and overall system displacement characterized. Baseline motion measurements given initial operation of cryogenic, vacuum systems and other utilities are considered.

43 PARTICLE ACCELERATORS↗

First high power pulsed tests of a dressed 325 MHz superconducting single spoke resonator at Fermilab

In the recently commissioned superconducting RF cavity test facility at Fermilab (SCTF), a 325 MHz, {beta} = 0.22 superconducting single-spoke resonator (SSR1) has been tested for the first time with its input power coupler. Previously, this cavity had been tested CW with a low power, high Q{sub ext} test coupler; first as a bare cavity in the Fermilab Vertical Test Stand and then fully dressed in the SCTF. For the tests described here, the design input coupler with Q{sub ext} {approx} 10{sup 6} was used. Pulsed power was provided by a Toshiba E3740A 2.5 MW klystron.

43 PARTICLE ACCELERATORS↗

Microphonics control for Project X

The proposed multi-MW Project X facility at Fermilab will employ cavities with bandwidths as narrow as 20 Hz. This combination of high RF power with narrow bandwidths combined requires careful attention to detuning control if these cavities are to be operated successfully. Detuning control for Projects X will require a coordinated effort between the groups responsible for various machine subsystems. Considerable progress in this area has been made over the past year. Detuning levels in the Project X cavities, specifically the Low and High {beta} 650 MHz elliptical types, can have a significant impact on the overall cost of the project. The narrow bandwidths, and the high RF Power requirements, and the large number of these cavities mean that careful attention to detuning control will be required if these cavities are to operate successfully. Limiting cavity detuning in Project X will require a coordinated effort between the groups responsible for various subsystems of the planned machine. Considerable progress towards this goal has been made by each of these groups over the past year.

43 PARTICLE ACCELERATORS↗

Test of a coaxial blade tuner at HTS FNAL

A coaxial blade tuner has been selected for the 1.3GHz SRF cavities of the Fermilab SRF Accelerator Test Facility. Results from tuner cold tests in the Fermilab Horizontal Test Stand are presented. Fermilab is constructing the SRF Accelerator Test Facility, a facility for accelerator physics research and development. This facility will contain a total of six cryomodules, each containing eight 1.3 GHz nine-cell elliptical cavities. Each cavity will be equipped with a Slim Blade Tuner designed by INFN Milan. The blade tuner incorporates both a stepper motor and piezo actuators to allow for both slow and fast cavity tuning. The stepper motor allows the cavity frequency to be statically tuned over a range of 500 kHz with an accuracy of several Hz. The piezos provide up to 2 kHz of dynamic tuning for compensation of Lorentz force detuning and variations in the He bath pressure. The first eight blade tuners were built at INFN Milan, but the remainder are being manufactured commercially following the INFN design. To date, more than 40 of the commercial tuners have been delivered.

43 PARTICLE ACCELERATORS↗

Resonance control in SRF cavities at FNAL

The Lorentz force can dynamically detune pulsed Superconducting RF cavities. Considerable additional RF power can be required to maintain the accelerating gradient if no effort is made to compensate for this detuning. Compensation systems using piezo actuators have been used successfully at DESY and elsewhere to control Lorentz Force Detuning (LFD). Recently, Fermilab has developed an adaptive compensation system for cavities in the Horizontal Test Stand, in the SRF Accelerator Test Facility, and for the proposed Project X.