Engineering Papers⌕ Search

Engineering topics

Pinayev, Igor

Publications and source records attributed to Pinayev, Igor.

21 records · Page 2

Coherent Electron Cooling Demonstration Experiment

Coherent electron cooling (CEC) is considered to be on of potential candidates capable of cooling high-energy, high-intensity hadron beams to very small emittances. It also has a potential to significantly boost luminosity of high-energy hadron-hadron and electron-hadron colliders. In a CEC system, a perturbation of the electron density caused by a hadron is amplified and fed back to the hadrons to reduce the energy spread and the emittance of the beam. Following the funding decision by DoE office of Nuclear Physics, we are designing and building coherent electron cooler for a proof-of-principle experiment at RHIC to cool 40 GeV heavy ion beam. In this paper, we describe the layout of the CeC installed into IP2 interaction region at RHIC. We present the design of the CeC cooler and results of preliminary simulations.

Litvinenko, Vladimir N.↗

Storage Ring Current Monitor

The storage ring current monitor is expected to be utilized for the following functions: - measurement of the current circulating in the storage ring; - measurement of the beam lifetime; - measurement of the injection efficiency; - provide the level of the circulating current for the equipment protection system; - provide amount of charge required for the next injection cycle in the top-up mode operation. The current will be monitored with a parametric current transformer (DCCT) integrated into the vacuum system of the storage ring. The electronic module will convert the current reading into the corresponding voltage which will be measured with a digital voltmeter (DVM). The digitized data will be processed by the control system.

36 MATERIALS SCIENCE↗

Injection System Diagnostics

The linac beam diagnostics will be provided by Research Instruments (former ACCEL) as part of the linac package: • one removable Faraday cup after electron source, • five wall current monitors (WCM) located after electron source, bunching system and accelerating sections 1, 2, and 3, • six removable YAG:Ce screens including cameras, • five sets of buttons for beam position monitoring. BNL will provide receivers for the beam position monitors (BPMs).

36 MATERIALS SCIENCE↗