Piesciorovsky, Emilio C.

Publications and source records attributed to Piesciorovsky, Emilio C..

Total Power Factor Smart Contract with Cyber Grid Guard Using Distributed Ledger Technology for Electrical Utility Grid with Customer-Owned Wind Farm

In modern electrical grids, the numbers of customer-owned distributed energy resources (DERs) have increased, and consequently, so have the numbers of points of common coupling (PCC) between the electrical grid and customer-owned DERs. The disruptive operation of and out-of-tolerance outputs from DERs, especially owned DERs, present a risk to power system operations. A common protective measure is to use relays located at the PCC to isolate poorly behaving or out-of-tolerance DERs from the grid. Ensuring the integrity of the data from these relays at the PCC is vital, and blockchain technology could enhance the security of modern electrical grids by providing an accurate means to translate operational constraints into actions/commands for relays. This study demonstrates an advanced power system application solution using distributed ledger technology (DLT) with smart contracts to manage the relay operation at the PCC. The smart contract defines the allowable total power factor (TPF) of the DER output, and the terms of the smart contract are implemented using DLT with a Cyber Grid Guard (CGG) system for a customer-owned DER (wind farm). This article presents flowcharts for the TPF smart contract implemented by the CGG using DLT. The test scenarios were implemented using a real-time simulator containing a CGG system and relay in-the-loop. The data collected from the CGG system were used to execute the TPF smart contract. The desired TPF limits on the grid-side were between +0.9 and +1.0, and the operation of the breakers in the electrical grid and DER sides was controlled by the relay consistent with the provisions of the smart contract. The events from the real-time simulator, CGG, and relay showed a successful implementation of the TPF smart contract with CGG using DLT, proving the efficacy of this approach in general for implementing electrical grid applications for utilities with connections to customer-owned DERs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Advanced Synchronized Time Digital Grid Twin Testbed for Relay Misoperation Analysis of Electrical Fault Type Detection Algorithms

Distributed energy resources and the number of relays are expected to rise in modern electrical grids; consequently, relay misoperations are also expected to grow. Relays can detect electrical fault types using an internal algorithm and can display the result using light indicators on the front of the relay. However, some relays’ internal algorithms for predicting types of electrical faults could be improved. This study assesses a relay’s external and internal algorithms with an Advanced Synchronized Time Digital Grid Twin (ASTDGT) testbed with paired relays. A misoperation relay analysis focused on measuring the accuracy of using the boundary admittance (the external algorithm) versus the set-default (the internal algorithm) relay method to determine the electrical fault types was performed. In this study, the internal and external relay algorithms were assessed with a synchronized time digital grid twin testbed using a real-time simulator. This testbed evaluated two sets of logic at the same time with the digital grid twin and paired relays in the loop. Different types of electrical faults were simulated, and the relays’ recorded events and electrical fault light indicator states were collected from the human–machine interfaces. This ASTDGT testbed with paired relays successfully evaluated the relay algorithm misoperations. The boundary admittance method had an accuracy of 100% for line-to-line, line-to-ground, and line-to-line ground faults.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid Forming Inverter With Increased Short-Circuit Contribution to Address Inverter-Based Microgrid Protection Challenges

Substantial differences in fault levels between grid-tied and islanded modes is one of the primary challenges of microgrid protection. During grid-tied mode, the bulk grid provides significant short-circuit, while during islanded operation the short-circuit magnitude is small due to inverter-based resources limiting their current output close to nominal ratings. Consequently, conventional distribution protection strategies based on overcurrent cannot reliably protect microgrids when operating in islanded mode. Fuses and circuit breakers are particularly affected because of their inverse characteristics. Presently, the absence of affordable solutions for protecting microgrids in islanded mode leads to microgrids shutting down during electrical faults. The contribution of this article is two-fold. The first innovation proposes specific hardware modifications to grid-forming inverters to increase their short-circuit current during electrical faults. The second innovation introduces a novel control strategy designed to preserve control stability margins even when the grid-filter saturates, ensuring sinusoidal output currents under normal and fault conditions. Through experimental results, the inverter with the proposed modifications can provide more than three-times its nominal current during electrical faults. For the prototype testbed, this was sufficient to enable the use of traditional legacy overcurrent protection, achieving the fuse-to-relay and relay-to-relay minimum coordination time for the line-to-ground, line-to-line to ground, and three-phase electrical faults.

42 ENGINEERING↗

Medium-Voltage Testbed for Comparing Advanced Power Line Sensors vs. Measurement Transformers with Electrical Grid Events

Electrical utilities have relied upon potential transformers (PTs) and current transformers (CTs) for very accurate metering and to provide reliable signals for protective relays. Less expensive alternative sensing technologies offer the possibility of wider deployment, particularly in grids that employ distributed energy resources. In this work, the performance of an advanced medi-um-voltage sensor is compared with a reference PT and CT and experimentally evaluated for different power grid scenarios on an advanced outdoor power line sensor testbed at the US De-partment of Energy’s Oak Ridge National Laboratory. The sensor is based on a capacitive divider for voltage monitoring and a Rogowski coil with integrator for current monitoring. The advanced outdoor power line sensor testbed has a real-time simulator that was used to generate transient scenarios (e.g., electrical faults, capacitor bank operation, service restoration), while the analog signals were recorded by the same high resolution power meter. The behavior of analog signals, harmonic components, total harmonic distortion, and crest factors were assessed for this power line sensor compared with the reference PT/CT, because of the absence for testing standards for advanced outdoor power line sensors.

Piesciorovsky, Emilio↗

Assessment and Commissioning of Electrical Substation Grid Testbed with a Real-Time Simulator and Protective Relays/Power Meters in the Loop

Electrical utility substations are wired with intelligent electronic devices (IEDs), such as protective relays, power meters, and communication switches. Substation engineers commission these IEDs to assess the appropriate measurements for monitoring, control, power system protection, and communication applications. Like real electrical utility substations, complex electrical substation grid testbeds (ESGTs) need to be assessed for measuring current and voltage signals in monitoring, power system protection, control (synchro check), and communication applications that are limited by small measurement percentage errors. In the process of setting an ESGT with real-time simulators and IEDs in the loop, protective relays, power meters, and communication devices must be commissioned before running experiments. In this study, an ESGT with IEDs and distributed ledger technology was developed. The ESGT with a real-time simulator and IEDs in the loop was satisfactorily assessed and commissioned. The commissioning and problem-solving tasks of the testbed are described to define a method with flowcharts to assess possible trouble-shooting in ESGTs. This method was based on comparing the simulations versus IED measurements for the phase current and voltage magnitudes, three-phase phasor diagrams, breaker states, protective relay times with selectivity coordination at electrical faults, communication data points, and time-stamp sources.

Piesciorovsky, Emilio↗

Electrical substation grid testbed for DLT applications of electrical fault detection, power quality monitoring, DERs use cases and cyber-events

Electrical utilities continue to deploy more intelligent electronic devices (IEDs) inside and outside electrical substation, and are associated with customer-owned distributed energy resources (DERs). The integrity and confidentiality of data from these IEDs, like power meters and protective relays, is crucial. Blockchain technology could improve the resilience of microgrids by improving the security of data sharing. The penetration of customer-owned DERs (renewable energy sources) and the increasing deployment of IEDs can lead to integrate power system applications with Distributed Ledger Technology (DLT). In this study, we implemented the electrical faulted phase detection and power quality monitoring algorithms with a Cyber Grid Guard (CGG) system using DLT. In addition, the DERs (wind turbine farms) use case and protective relay cyber-event tests were assessed, by using the CGG system with DLT. In the experimental model, the testbed was created by using a real-time simulator and CGG system with power meters/ protective relays in-the-loop. The data collected from the CGG system and IEDs were compared with the same time stamp source. These results had shown the successful assessment of protection, control and monitoring applications using a CGG system with DLT. In the future, the ESGT with DERs and the CGG system will be used in other power system applications, based on implementing smart contracts between electrical utilities with customer-owned DERs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Outdoor Test Bed Performance of a Power Line Sensor Using a Real-Time Event Simulator

This report summarizes the design and application of an outdoor power line sensor testbed (OPLST) with a real-time simulator and power meter to compare a potential transformer (PT) and current transformer (CT) versus an advanced line-post sensor. The OPLST was created to validate advanced medium-voltage (20/34.5 kV) outdoor power line sensors used in electrical distribution systems. Electrical utilities have installed metering and relay-protection transformers like PTs and CTs for several decades. The PTs/CTs are iron core measurement transformers based on the electromagnetic induction principle and provide reliable data in normal grid operation. However, new outdoor power line sensors (OPLS) using other technologies like voltage divider, Rogowski coil and optical principles have become available and may have favorable performance and costs compared to PTs/CTs. Therefore, the importance of testing these technologies with the PT/CT, to compare the measured phase voltage/current at different power grid scenarios is crucial to understand the performance of these new OPLS. For this study a G&W Electric Model CVS-36-O power line sensor was chosen as the OPLS to test with voltage/current signals. An OPAL-RT Technologies Model OP4510 real-time simulator and Schweitzer Engineering Laboratories Model SEL-735 power meter were installed with the 20/34.5 kV OPLST to compare the measured transient events collected from an advanced OPLS and the PT/CT. This system is installed at the Distributed Energy Communications and Control (DECC) lab, Oak Ridge National Laboratory (ORNL). The simulator generated different power grid scenarios (electrical faults, capacitor bank operation, service restoration, etc.), and its analog-output signals were connected to the voltage/current amplifiers that feed the 20/34.5 kV aerial cable loop through the PT/CT devices. Additional PT/CT devices were also wired with the medium voltage aerial cable loop to measure the phase current/voltage signals and server as references. After each test, common format for transient data exchange (COMTRADE) files were collected from the SEL-735 power meter and used to compare the performance of the OPLS with the PT/CT. The behavior of analog signals, harmonic components, total harmonic distortion and crest factors were assessed and found favorable for the G&W sensor as compared to the reference PT/CT.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Assessment of the Phase-to-Ground Fault Apparent Admittance Method with Phase/Ground Boundaries to Detect Types of Electrical Faults for Protective Relays Using Signature Library and Simulated Events

Protective relays in electric power grids recognize the types of electrical faults in a few seconds. The most common detection method to detect the types of electrical faults is based on measuring the angle between the zero and negative sequence currents. However, it is not completely accurate because the phase-to-phase-ground and phase-to-ground electrical faults could have the same detection conditions. Therefore, engineers need to plot the events after an electrical fault to observe the nature of the incidents in detail. In this study, the phase-to-ground fault apparent (PGFA) admittance method with phase/ground boundaries identified the types of electrical faults located in distribution power lines and feeders. This method was based on measuring the PGFA admittance magnitudes for the faulted and nonfaulted phases, resulting in greater than zero and near zero, respectively. The PGFA admittance algorithm was built with MATLAB/Simulink software and tested with signature library and grid simulation events. The PGFA method with phase/ground boundaries was evaluated with the confusion matrix. The measured and predicted values matched in more than 90% of the tests, and the PGFA admittance method with phase/ground boundaries presented an accuracy of 94.3% and a precision of 100%.

42 ENGINEERING↗

Oak Ridge National Laboratory Pilot Demonstration of an Attestation and Anomaly Detection Framework using Distributed Ledger Technology for Power Grid Infrastructure

This report summarizes the design and pilot demonstration of a framework called Grid Guard that was created to provide increased data and device trustworthiness to electric grid devices by leveraging distributed ledger technology (DLT), specifically blockchain. Grid Guard contains a combination of core cryptographic methods such as the secure hash algorithm (SHA), and asymmetric cryptography, private permissioned blockchain, baselining configuration data, consensus algorithm (Raft) and the Hyperledger Fabric (HLF) framework. The system implements a low energy, fast, and robust enhancement to system trustworthiness within and across electric grid systems such as substations, control centers and metering infrastructures. Blockchain is a distributed database structured that provides a practically unalterable (immutable) timeline of stored transactions. By relying on hashing and the Raft consensus algorithm, if an entity tries to illegitimately alter a record at one instance of the database the other ledger nodes are not altered. They work to cross-reference each other and easily locate any incorrectly added data and remove it. The bulk raw data is stored in an off-chain storage (outside of the blockchain ledger) and a hash of this baseline data is stored in the Blockchain ledger via hashing windows of time-series and configuration data, after aggregation and filtering. The bulk off-chain data repository is then considered to be trust-anchored using the hashes stored in the blockchain. To secure the electric grid testbed devices and data, device configuration baselines were compared to those baselines that had been previously stored in the ledger. Statistical baselines for device configurations, network communication patterns, and high-speed sensor data are calculated and then stored off-chain and hashes stored in the ledger. Measurements such as three-phase voltage and current, frequency, breaker status, protection scheme settings, network configuration settings (and other device configuration artifacts) and network traffic features (packet interarrival times) are compared every minute or other selected time windows. During phase 1 of the Grid Guard DLT project different DLT technologies were studies, and an assessment was performed on DLT technology vulnerabilities, uses, and key characteristics. DLT consensus protocols were studies (e.g., RAFT, named after Reliable, Replicated, Redundant, And Fault-Tolerant). Also, cryptography, public, private and permissioned or permissionless systems were assessed. Grid Guard implements a permissioned private DLT. Consensus algorithm selection and choice of DLT implementation depended heavily on the use-case. For this use-case, parameters were selected to measure performance and existing tools for assessment. Benchmarking was performed theoretically and practically. During phase 2 hashed transactions/blocks were inserted into the ledger every second. During phase 2 of the Grid Guard DLT project, a prototype framework was developed and demonstrated for attestation of critical substation devices and data using precision timing systems that use PTP and IRIG-B protocols) on a testbed of operational devices that emulated a distribution substation, control center, and power metering infrastructure using real Operational Technology (OT). The testbed includes OT devices such as protective relays, human machine interfaces (HMI), and power meters. To determine when to collect and compare system and network baselines, an initial examination of an anomaly detection capability to identify malicious manipulation of data streams was conducted. The resulting anomaly detection was demonstrated in a set of experiments and leveraged to trigger device artifact attestation checks. Attestation checks occur against device configuration baselines when compared with the immutable blockchain-stored baselines, which provided a cryptographically supported means by which to store baselines. The electrical substation-grid testbed was created to test the Grid Guard framework. The testbed emulates the operations of a portion of a power grid and SCADA systems as closely as possible. The testbed integrates real protocols, mainly IEC 61850 standard protocols, such as the Sampled Value (SV) and the GOOSE protocols. The testbed also supports DNP3 and other layer 2 and layer 3 protocols such as Telnet, SSH, SFTP/FTP and other proprietary protocols needed to connect to industrial control system equipment. The testbed emulates real power conditions using the OpalRT hardware-in-the-loop (HIL) device which can create fault situations that cannot be easily tested on real systems. The electrical substation-grid testbed was created using real measurement, communication, and protection devices that electrical utilities commonly use.

24 POWER TRANSMISSION AND DISTRIBUTION↗