Engineering Papers⌕ Search

Engineering topics

Pham, Hai

Publications and source records attributed to Pham, Hai.

Predictive Contaminant Transport Simulation with the P2R Model for the Composite Analysis Inventory Sensitivity Case

The Plateau to River (P2R) Model is a groundwater flow and contaminant fate and transport (F&T) simulation model used to support remedial activities conducted by the Central Plateau Cleanup Company (CPCCo) at the Hanford Site in Washington State. The model simulates contaminants of concern within the saturated zone of the uppermost aquifer beneath the Central Plateau and downgradient to the Columbia River. The overall objective of the saturated zone modeling effort is to provide a basis for making informed remedial action decisions based on descriptions of current and expected future contaminant concentrations in groundwater at decision points within and downgradient of the Central Plateau of the Hanford Site. Specifically, the purpose of this environmental calculation file (ECF) is to describe an inventory sensitivity case of the CA base case. The inventory sensitivity case implements a change in the activity contribution from the vadose zone in the A Trenches Area model (for tritium (H-3) and iodine-129 (I-129)), BC Cribs and Trenches model (for I-129 and technetium-99 (Tc-99)), and the PUREX Area model (for H-3 and I-129). All other simulated inventories are identical to the CA base case. The simulation of F&T of contaminants reported in this case will support dose predictions as part of the Hanford Site CA.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Predictive Contaminant Transport Simulation with the P2R Model for the Composite Analysis Recharge Sensitivity Case

The Plateau-to-River (P2R) model is a groundwater flow and contaminant fate and transport (F&T) simulation model used to support remedial activities conducted by the Central Plateau Cleanup Company (CPCCo) at the Hanford Site in south-central Washington State. The overall objective of the saturated zone modeling effort is to provide a basis for making informed remedial action decisions based on descriptions of current and expected future contaminant concentrations in groundwater at decision points within and downgradient of the Central Plateau of the Hanford Site. Specifically, the purpose of this environmental calculation file (ECF) is to describe a recharge sensitivity case of the CA base case. The recharge sensitivity case implements a change in the activity contribution from the vadose zone in the A Trenches Area model (for tritium [H-3] and iodine-129 [I-129]), BC Cribs and Trenches model (for I-129 and technetium-99 [Tc-99]), or the Plutonium Uranium Extraction (PUREX) Area model (for H-3 and I-129). All other simulated inventories are identical to the CA base case. The simulation of fate and transport of contaminants reported in this case will support dose predictions as part of the updated Hanford Site CA.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Predictive Flow Simulation with the P2R Model for the Composite Analysis Base Case

In order to meet the requirements of U.S. Department of Energy (DOE) in DOE O 435.1, Radioactive Waste Management, a composite analysis (CA) must be completed for the Central Plateau at the Hanford Site. The CA requires estimates of fate and transport of radionuclides in the groundwater from multiple sources within the modeling domain. This document details the application of the Plateau-to-River (P2R) Model version 8.3 to predict the flow of groundwater on the Central Plateau for the 10,000-year simulation to support the CA. The simulated flow field will support the simulation of fate and transport of contaminants for use in predicting dose as part of the CA. This document describes the changes made to model inputs in order to simulate the predictive flow field for the CA.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗