Engineering Papers⌕ Search

Engineering topics

Penzo, P. A.

Publications and source records attributed to Penzo, P. A..

34 records · Page 2

Impact of Saturn's rings on mission analysis for MJS 77

Mariner Jupiter-Saturn '77 mission objectives for Saturn are considered which affect the trajectory design and in particular the aim point at Saturn. These objectives include the following: (1) earth, sun occulation of Saturn, rings, and satellites; (2) close as possible to surface; (3) close as possible to rings; (4) close encounter with Titan (approximately 20,000 km); (5) close encounter with lapetus; (6) multiple satellite encounters; (7) post-Saturn trajectory to Uranus; and (8) post-Saturn trajectory toward solar apex.

Penzo, P. A.↗

Computation and analysis of satellite opportunities for the Mariner Jupiter/Saturn 1977 mission

The MJS77 mission provides the United States with the first opportunity to study the large satellites of Jupiter and Saturn at close range. Techniques are presented which allow the mission analyst to generate single and multiple satellite encounters at Jupiter and Saturn, and to incorporate satellite gravity assist into the targeting problem. These methods are applied to the MJS77 mission to generate, parametrically, the single and multiple satellite opportunities and characteristics at both flyby planets. An interesting consequence of this study is that a close encounter with a Galilean satellite increases the flexibility of a trajectory design which would otherwise require sizable post-Jupiter trajectory correction maneuvers to achieve the desired Saturn arrival date timing. In addition the Saturn studies revealed that as many as four satellites can be encountered on a single trajectory.

Beerer, J. G.↗

Mariner Jupiter/Saturn 1977 - The mission frame.

Following the cancellation of the Outer Planet Grand Tour Project, NASA and JPL examined less ambitious, alternative missions for exploring the outer planets. The mission that proved most attractive scientifically and fits within the projected NASA budget constraints embraces dual flights to Jupiter and Saturn, with launch in 1977. NASA has implemented it as the Mariner Jupiter/Saturn 1977 (MJS77) Project. The MJS77 mission covers exploratory investigations of the Jupiter and Saturn planetary systems and the interplanetary medium out to Saturn. Items of special interest include Jupiter's great red spot, the question of Io's anomalous brightening and phenomena associated with its EM behavior. After Saturn encounter, the spacecraft will escape the solar system in the general direction of the solar apex.

Bourke, R. D.↗

Mariner Jupiter/Saturn 1977 preliminary mission design.

Current plans of NASA are to take advantage of the 1977 launch opportunity by sending a Mariner class spacecraft on a gravity assisted flyby of Jupiter which will then continue on to Saturn. The background of this Mariner Jupiter-Saturn 77 Project is reviewed and science objectives for this mission as currently adapted are given. This paper illustrates properties of the Jupiter-Saturn opportunities between 1976 and 1980 to give context to the 1977 opportunity. Details of the possibilities for the 1977 launch are shown along with constraints and example candidate trajectories. Options include close flybys and/or occultations of the satellites at Jupiter and Saturn, penetration of Saturn's rings, and various occultations of the planets. A short discussion of other factors, such as navigation and planetary quarantine (documented elsewhere) are included.

Bourke, R. D.↗

Design of Grand Tour missions

Grand Tour mission design, discussing navigation, trajectory parameters, launch vehicles and satellite flybys

Bourke, R. D.↗

The extended stay lunar exploration mission.

Extended stay lunar exploration mission in terms of lunar landing site with relaxation of certain Apollo constraints and ground rules

LUNAR EXPLORATION SYSTEM FOR APOLLO /LESA/↗