Engineering PapersSearch

Engineering topics

Parker, Joel

Publications and source records attributed to Parker, Joel.

NASA GNSS Activities: WG-B - Enhancement of GNSS Performance, New Services & Capabilities

NASA represents US civil space users at the United Nations International Committee on Global Navigation Satellite Systems (ICG). ICG Working Group B (WG-B) is responsible for Enhancement of Global Navigation Satellite Systems (GNSS) Performance, New Services and Capabilities. The development and characterization of the GNSS Space Service Volume (SSV) is a key area of activity for NASA within WG-B. This presentation contains NASA's contributions to the June 2018 meeting of the ICG WG-B. Topics covered include recent NASA lunar GPS analysis and results; proposed discussion topics for future SSV workshops and trade studies, an overview of the planned SSV Video, discussion of SSV Outreach, and NASA activities updates including GPS and Galileo Receiver for the International Space Station (GARISS), the International GNSS Service (IGS), Next-Generation Broadcast Services (NGBS), flight results from the Magnetospheric Multiscale (MMS) mission, flight results from the Geostationary Operational Environmental Satellite (GOES) R series, the Automated Flight Termination System (AFTS), and other topics.

NASA

WG-B - Enhancement of GNSS Performance, New Services & Capabilities

NASA represents US civil space users at the United Nations International Committee on Global Navigation Satellite Systems (ICG). ICG Working Group B (WG-B) is responsible for Enhancement of GNSS Performance, New Services and Capabilities. The development and characterization of the GNSS Space Service Volume (SSV) is a key area of activity for NASA within WG-B. This presentation contains NASA's contributions to the June 2018 meeting of the ICG WG-B. Topics covered include recent NASA lunar GPS analysis and results; proposed discussion topics for future SSV workshops and trade studies, an overview of the planned SSV Video, discussion of SSV Outreach, and NASA activities updates including GPS and Galileo Receiver for the International Space Station (GARISS), the International GNSS Service (IGS), Next-Generation Broadcast Services (NGBS), flight results from the Magnetospheric Multiscale (MMS) mission, flight results from the Geostationary Operational Environmental Satellite (GOES) R series, the Automated Flight Termination System (AFTS), and other topics.

Miller, J. J.

NASA Update: GNSS Space Service Volume Providers' Forum

NASA represents US civil space users at the United Nations International Committee on Global Navigation Satellite Systems (ICG). ICG Working Group B (WG-B) is responsible for Enhancement of GNSS Performance, New Services and Capabilities. The development and characterization of the GNSS Space Service Volume (SSV) is a key area of activity for NASA within WG-B. This presentation contains NASA's contributions to the June 2018 meeting of the ICG WG-B. Topics covered include recent NASA lunar GPS analysis and results; proposed discussion topics for future SSV workshops and trade studies, an overview of the planned SSV Video, discussion of SSV Outreach, and NASA activities updates including GPS and Galileo Receiver for the International Space Station (GARISS), the International GNSS Service (IGS), Next-Generation Broadcast Services (NGBS), flight results from the Magnetospheric Multiscale (MMS) mission, flight results from the Geostationary Operational Environmental Satellite (GOES) R series, the Automated Flight Termination System (AFTS), and other topics.

Global

GPS Operations in High Earth Orbit Recent - Experiences and Future Opportunities

Over the past two decades, spacecraft in Low Earth Orbit (LEO) have significantly benefited from real-time reception of navigation and timing signals from the Global Positioning System (GPS). By employing GPS receivers that are specially developed to support reception in space, LEO spacecraft now realize significantly reduced recovery time after trajectory maneuvers, improved operations cadence, increased satellite autonomy, and more precise, real-time navigation and timing performance. Now, despite extremely weak signal reception and less favorable geometry, a number of upcoming HEO missions are poised to benefit from improved navigation, timing, and onboard autonomy thanks to GPS. This paper will describe the results of two recent missions (MMS and GOES-16), provide an understanding of the benefits and limitations of GPS beyond LEO, and outline future missions and opportunities where this capability would result in significant and enabling benefits.

Space Service Volume

Using the General Mission Analysis Tool (GMAT)

This is a software tutorial and presentation demonstrating the application of the General Mission Analysis Tool (GMAT). These slides will be used to accompany the demonstration. The demonstration discusses GMAT basics, then presents a detailed example of GMAT application to the Transiting Exoplanet Survey Satellite (TESS) mission. This talk is a combination of existing presentations and material; system user guide and technical documentation; a GMAT basics and overview, and technical presentations from the TESS projects on their application of GMAT to critical mission design. The GMAT basics slides are taken from the open source training material. The TESS slides are a streamlined version of the CDR package provided by the project with SBU and ITAR data removed by the TESS project. Slides for navigation and optimal control are borrowed from system documentation and training material.

trajectory

Monte Carlo Analysis as a Trajectory Design Driver for the Transiting Exoplanet Survey Satellite (TESS) Mission

The Transiting Exoplanet Survey Satellite (TESS) will be injected into a highly eccentric Earth orbit and fly 3.5 phasing loops followed by a lunar flyby to enter a mission orbit with lunar 2:1 resonance. Through the phasing loops and mission orbit, the trajectory is significantly affected by lunar and solar gravity. We have developed a trajectory design to achieve the mission orbit and meet mission constraints, including eclipse avoidance and a 30-year geostationary orbit avoidance requirement. A parallelized Monte Carlo simulation was performed to validate the trajectory after injecting common perturbations, including launch dispersions, orbit determination errors, and maneuver execution errors. The Monte Carlo analysis helped identify mission risks and is used in the trajectory selection process.

monte carlo

Monte Carlo Analysis as a Trajectory Design Driver for the TESS Mission

The Transiting Exoplanet Survey Satellite (TESS) will be injected into a highly eccentric Earth orbit and fly 3.5 phasing loops followed by a lunar flyby to enter a mission orbit with lunar 2:1 resonance. Through the phasing loops and mission orbit, the trajectory is significantly affected by lunar and solar gravity. We have developed a trajectory design to achieve the mission orbit and meet mission constraints, including eclipse avoidance and a 30-year geostationary orbit avoidance requirement. A parallelized Monte Carlo simulation was performed to validate the trajectory after injecting common perturbations, including launch dispersions, orbit determination errors, and maneuver execution errors. The Monte Carlo analysis helped identify mission risks and is used in the trajectory selection process.

trajectory

Trajectory Design Enhancements to Mitigate Risk for the Transiting Exoplanet Survey Satellite (TESS)

The Transiting Exoplanet Survey Satellite (TESS) will employ a highly eccentric Earth orbit, in 2:1 lunar resonance, which will be reached with a lunar flyby preceded by 3.5 phasing loops. The TESS mission has limited propellant and several constraints on the science orbit and on the phasing loops. Based on analysis and simulation, we have designed the phasing loops to reduce delta-V (DV) and to mitigate risk due to maneuver execution errors. We have automated the trajectory design process and use distributed processing to generate and optimal nominal trajectories; to check constraint satisfaction; and finally to model the effects of maneuver errors to identify trajectories that best meet the mission requirements.

satellite

Trajectory Design for the Transiting Exoplanet Survey Satellite (TESS)

The Transiting Exoplanet Survey Satellite (TESS) is a National Aeronautics and Space Administration (NASA) mission launching in 2017. TESS will travel in a highly eccentric orbit around Earth, with initial perigee radius near 17 Earth radii (Re) and apogee radius near 59 Re. The orbit period is near 2:1 resonance with the Moon, with apogee nearly 90 degrees out-of-phase with the Moon, in a configuration that has been shown to be operationally stable. TESS will execute phasing loops followed by a lunar flyby, with a final maneuver to achieve 2:1 resonance with the Moon. The goals of a resonant orbit with long-term stability, short eclipses and limited oscillations of perigee present significant challenges to the trajectory design. To rapidly assess launch opportunities, we adapted the SWM76 launch window tool to assess the TESS mission constraints. To understand the long-term dynamics of such a resonant orbit in the Earth-Moon system we employed Dynamical Systems Theory in the Circular Restricted 3-Body Problem (CR3BP). For precise trajectory analysis we use a high-fidelity model and multiple shooting in the General Mission Analysis Tool (GMAT) to optimize the maneuver delta-V and meet mission constraints. Finally we describe how the techniques we have developed can be applied to missions with similar requirements.

Monte Carlo

The U.S. Rosetta Project: Mars Gravity Assist

Since launch on March 2, 2004, the International Rosetta Mission has flown by the Earth/Moon system one time and conducted several distant observations of comets, including support for the Deep Impact measurements of comet 9 P/Tempel 1. In 2007, Rosetta flew by Mars for a gravity assist, and conducted observations of the Martian upper atmosphere as well as extended observations, in support of the New Horizons Jupiter encounter, of the Jovian magnetotail and Io torus. In late 2007 Rosetta had its second encounter with the Earth/Moon system. NASA's contribution to the Rosetta mission consists of three hardware experiments, and the portion of the electronics package for a fourth, as well as the participation of an Interdisciplinary Scientist (IDS); backup tracking, telecommunications, and navigation assurance provided by the Deep Space Network (DSN); support for the scientific participation of U.S. investigators on non-U.S. PI-led experiments. Collectively these elements are known as the U.S. Rosetta Project. In this paper we will update the status of the instruments following the both the Mars and Earth/Moon gravity assists. In addition, we will present a summary of the science observations for both Mars and Jupiter. 12.

Rosetta