Engineering Papers⌕ Search

Engineering topics

Parker, B

Publications and source records attributed to Parker, B.

SU-E-J-189: Credentialing of IGRT Equipment and Processes for Clinical Trials

Purpose: Current dosimetry phantoms used for clinical trial credentialing do not directly assess IGRT processes. This work evaluates a custom-built IGRT phantom for credentialing of multiple IGRT modalities and processes. Methods: An IGRT phantom was built out of a low-density body with two inserts. Insert A is used for the CT simulation. Insert B is used for the actual treatment. The inserts contain identical targets in different locations. Relative positions are unknown to the user. The user simulates the phantom (with insert A) as they would a patient, including marking the phantom. A treatment plan is created and sent to the treatment unit. The phantom (with insert B) is then positioned using local IGRT practice. Shifts (planned isocenter, if applicable, and final isocenter) are marked on the phantom using room lasers. The mechanical reproducibility of re-inserting the inserts within the phantom body was tested using repeat high-resolution CT scans. The phantom was tested at 7 centers, selected to include a wide variety of imaging equipment. Results: Mechanical reproducibility was measured as 0.5-0.9mm, depending on the direction. Approaches tested to mark (and transfer) simulation isocenter included lasers, fiducials and reflective markers. IGRT approaches included kV imaging (Varian Trilogy, Brainlab ExacTrac), kV CT (CT-on-rails), kV CBCT (Varian Trilogy, Varian Truebeam, Elekta Agility) and MV CT (Tomotherapy). Users were able to successfully use this phantom for all combinations of equipment and processes. IGRT-based shifts agreed with the truth within 0.8mm, 0.8mm and 1.9mm in the LR, AP, and SI directions, respectively. Conclusion: Based on these preliminary results, the IGRT phantom can be used for credentialing of clinical trials with an action level of 1mm in AP and LR directions, and 2mm in the SI direction, consistent with TG142. We are currently testing with additional institutions with different equipment and processes, including Cyberknife. This project was funded by the Cancer Prevention Research Institute of Texas.

60 APPLIED LIFE SCIENCES↗

Challenges And Concepts for Design of An Interaction Region With Push-Pull Arrangement of Detectors - An Interface Document

Two experimental detectors working in a push-pull mode has been considered for the Interaction Region of the International Linear Collider. The push-pull mode of operation sets specific requirements and challenges for many systems of detector and machine, in particular for the IR magnets, for the cryogenics and alignment system, for beamline shielding, for detector design and overall integration, and so on. These challenges and the identified conceptual solutions discussed in the paper intend to form a draft of the Interface Document which will be developed further in the nearest future. The authors of the present paper include the organizers and conveners of working groups of the workshop on engineering design of interaction region IRENG07, the leaders of the IR Integration within Global Design Effort Beam Delivery System, and the representatives from each detector concept submitting the Letters Of Intent.

43 PARTICLE ACCELERATORS↗

BNL Direct Wind Superconducting Magnets

BNL developed Direct Wind magnet technology is used to create a variety of complex multi-functional multi-layer superconducting coil structures without the need for creating custom production tooling and fixturing for each new project. Our Direct Wind process naturally integrates prestress into the coil structure so external coil collars and yokes are not needed; the final coil package transverse size can then be very compact. Direct Wind magnets are produced with very good field quality via corrections applied during the course of coil winding. The HERA-II and BEPC-II Interaction Region (IR) magnet, J-PARC corrector and Alpha antihydrogen magnetic trap magnets and our BTeV corrector magnet design are discussed here along with a full length ILC IR prototype magnet presently in production and the coils that were wound for an ATF2 upgrade at KEK. A new IR septum magnet design concept for a 6.2 T combined-function IR magnet for eRHIC, a future RHIC upgrade, is introduced here.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Construction and Operational Experience with a Superconducting Octupole Used to Trap Antihydrogen

A superconducting octupole magnet has seen extensive service as part of the ALPHA experiment at CERN. ALPHA has trapped antihydrogen, a crucial step towards performing precision measurements of anti-atoms. The octupole was made at the Direct Wind facility by the Superconducting Magnet Division at Brookhaven National Laboratory. The magnet was wound with a six-around-one NbTi cable about 1 mm in diameter. It is about 300 mm long, with a radius of 25 mm and a peak field at the conductor of 4.04 T. Specific features of the magnet, including a minimal amount of material in the coil and coil ends with low multipole content, were advantageous to its use in ALPHA. The magnet was operated for six months a year for five years. During this time it underwent about 900 thermal cycles (between 4K and 100K). A novel operational feature is that during the course of data-taking the magnet was repeatedly shut off from its 950 A operating current. The magnet quenches during the shutoff, with a decay constant of 9 ms. Over the course of the five years, the magnet was deliberately quenched many thousands of times. It still performs well.

99 GENERAL AND MISCELLANEOUS↗

Status of Superconducting Magnet System for the J-PARC Neutrino Beam Line

The superconducting magnet system for the J-PARC neutrino beam line for the T2K experiment has been served for the beam operation without serious disturbance since April 2009. Present most concern of the system is the operational current limit of superconducting corrector magnets for beam steering due to systematic quenches at lower currents. Operational experience of the magnet system and examples of troubleshoot including countermeasures against the corrector magnet quenches are presented.

99 GENERAL AND MISCELLANEOUS↗

IMPLEMENTATION OF A DC BUMP AT THE STORAGE RING INJECTION STRAIGHT SECTION

The NSLS II beam injection works with a DC septum, a pulsed septum and four fast kicker magnets. The kicker power supplies each produce a two revolution period pulsed field, 5.2 {micro}s half sine waveform, using {approx}5kA drive voltage. The corresponding close orbit bump amplitude is {approx}15mm. It is desired that the bump is transparent to the users for top-off injection. However, high voltage and short pulse power supplies have challenges to maintain pulse-to-pulse stability and magnet-to-magnet reproducibility. To minimize these issues, we propose implementing a DC local bump on top of the fast bump to reduce the fast kicker strength by a factor of 2/3. This bump uses two storage ring corrector magnets plus one additional magnet at the septum to create a local bump. Additionally, these magnets could provide a DC bump to simulate the septum position effects on the store beam lifetime. This paper presents the detail design of this DC injection bump and related beam dynamics.

43 PARTICLE ACCELERATORS↗

PROGRESS WITH NSLS-II INJECTION STRAIGHT SECTION DESIGN

The NSLS-II injection straight section (SR) consists of pulsed and DC bumps, septa system, beam trajectory correction and diagnostics systems. In this paper we discuss overall injection straight layout, preliminary element designs, specifications for the pulsed and DC magnets and their power supplies, vacuum devices and chambers and diagnostics devices. Prior to selecting the current 'conventional' design of the injection straight section we analyzed an option of injection via pulsed multipole pioneered at PF-AR. We found that this promising approach was not suited to the NSLS-II storage ring optics, since it would require a impractically compact arrangement of the injection straight section components and a complex modification of the transport line optics due to the strong focusing of the injected beam passing off the pulsed multipole axis. In addition, the requirement for a small injection transient of the stored beam orbit severely constrains the vertical alignment tolerance of the pulsed multipole. The design of the NSLS-II injection straight section is now completed with exception of transition chamber details, which will be adjusted to accommodate the actual layouts of the pulsed magnets.

43 PARTICLE ACCELERATORS↗

High luminosity electron-hadron collider eRHIC

We present the design of a future high-energy high-luminosity electron-hadron collider at RHIC called eRHIC. We plan on adding 20 (potentially 30) GeV energy recovery linacs to accelerate and to collide polarized and unpolarized electrons with hadrons in RHIC. The center-of-mass energy of eRHIC will range from 30 to 200 GeV. The luminosity exceeding 10{sup 34} cm{sup -2} s{sup -1} can be achieved in eRHIC using the low-beta interaction region with a 10 mrad crab crossing. We report on the progress of important eRHIC R&D such as the high-current polarized electron source, the coherent electron cooling, ERL test facility and the compact magnets for recirculation passes. A natural staging scenario of step-by-step increases of the electron beam energy by building-up of eRHIC's SRF linacs is presented.

43 PARTICLE ACCELERATORS↗

A Superconducting Magnet Upgrade of the ATF2 Final Focus

The ATF2 facility at KEK is a proving ground for linear collider technology with a well instrumented extracted beam line and Final Focus (FF). The primary ATF2 goal is to demonstrate the extreme beam demagnification and spot stability needed for a linear collider FF. But the ATF2 FF uses water cooled magnets and the ILC baseline has a superconducting (SC) FF. We plan to upgrade ATF2 and replace some of the warm FF magnets with SC FF magnets. The ATF2 SC magnets, like the ILC FF, will made via direct wind construction. ATF2 coil winding is in progress at BNL and warm magnetic measurements indicate we have achieved good field quality. Studies indicate that having ATF2 FF magnets with larger aperture and better field quality should allow reducing the ATF2 FF beta function for study of focusing regimes relevant to CLIC. The ATF2 magnet cryostat will have laser view ports for directly monitoring cold mass movement. We plan to make stability measurements at BNL and KEK to relate ATF2 FF magnet performance to that of a full length ILC QD0 R and D FF prototype under construction at BNL.

43 PARTICLE ACCELERATORS↗

Scenarios For The ATF2 Ultra-Low Betas Proposal

The current ATF2 Ultra-Low beta proposal was designed to achieve 20nm vertical IP beam size without considering the multipolar components of the FD magnets. In this paper we describe different scenarios that avoid the detrimental effect of these multipolar errors to the beam size at the interaction point (IP). The simplest approach consists in modifying the optics, but other solutions are studied as the introduction of super-conducting wigglers to reduce the emittance or the replacement of the normal-conducting focusing quadrupole in the Final Doublet (NC-QF1FF) with a super-conducting quadrupole one (SC-QF1FF). These are fully addressed in the paper.

43 PARTICLE ACCELERATORS↗

Lattice design for the ERL electron ion collider in RHIC

We present electron ion collider lattice design for the Relativistic Heavy Ion Collider (eRHIC) where the electrons have multi-passes through recirculating linacs (ERL) and arcs placed in the existing RHIC tunnel. The present RHIC interaction regions (IR's), where the electron ion collisions will occur, are modified to allow for the large luminosity. Staging of eRHIC will bring the electron energy from 4 up to 20 (30) GeV as the superconducting cavities are built and installed sequentially. The synchrotron radiation from electrons at the IR is reduced as they arrive straight to the collision while ions and protons come with 10 mrad crossing angle using the crab cavities.

43 PARTICLE ACCELERATORS↗

ATF2 Commissioning

ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

43 PARTICLE ACCELERATORS↗

Construction of Superconducting Magnet System for the J-PARC Neutrino Beam Line

Following success of a prototype R&D, construction of a superconducting magnet system for J-PARC neutrino beam line has been carried out since 2005. A new conceptual beam line with the superconducting combined function magnets demonstrated the successful beam transport to the neutrino production target.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗