Off-Nominal Planning for the Cryogenic Vacuum Test of the JWST Optical Telescope Element/Integrated Science Instrument Module at JSC

The cryogenic thermal vacuum/thermal balance test of the James Webb Space Telescope (JWST) combined Optical Telescope Element (OTE)/Integrated Science Instrument Module (ISIM), known as the OTIS, at the Johnson Space Center (JSC) Chamber A in 2017 was likely the most complex test ever performed by NASA for an unmanned mission. The test of the combined flight Optical Telescope and ISIM elements was prefaced by years of modifications to chamber facilities, and included three extensive precursor tests of non-flight and flight hardware to establish safe and optimal test operational procedures. One critical part of the test preparation was planning for off-nominal events that could arise, including appropriate responses. In some cases, assurance of personnel and payload safety required modification of original test hardware and procedures which had to be validated before the final test could begin. This planning proved especially prescient for the OTIS test, as Hurricane Harvey struck the Houston area during the test in August 2017, and consequences for the precious payload could have been severe. This paper describes the extent of the thermal off-nominal planning undertaken for the OTIS test, including including safing for hurricanes, and some real-life effects of Hurricane Harvey on the test conduct. Documentation of the consequences and mitigations for these events are discussed. The importance of off-nominal planning for future thermal vacuum/thermal balance tests is illustrated.

Off-Nominal Planning↗

Thermal Model Performance for the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in mid-2020, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, has recently been completed at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A system-level pre-test thermal model was constructed which fully captured the behavior of the payload, ground support equipment, and surrounding test chamber. This thermal model simulated both the transient cooldown to and warmup from a 20 K flight-like environment, as well as predicted the payload performance at cryo-stable conditions. The current work is an assessment of thermal model pre-test prediction performance against actual payload response during the OTIS CV test. Overall, the thermal model performed exceedingly well at predicting schedule and payload response. Looking in depth, this work examines both the benefits and shortcomings of assumptions made pre-test to simplify model execution when compared against test data. It explores in detail the role of temperature-dependent emissivities during transition to cryogenic temperatures, as well as the impact that model geometry simplifications have on tracking of critical hardware limits and constraints. This work concludes with a list of recommendations to improve the accuracy of thermal modeling for future large cryogenic tests. The insight gained from the OTIS CV test thermal modeling will benefit planning and execution for upcoming cryogenic missions.

Testing↗

Thermal Model Performance for the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, has recently been completed at the Johnson Space Center's Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A system-level pre-test thermal model was constructed which fully captured the behavior of the payload, ground support equipment, and surrounding test chamber. This thermal model simulated both the transient cooldown to and warmup from a 20K flight-like environment, as well as predicted the payload performance at cryo-stable conditions. The current work is a preliminary assessment of thermal model performance against actual payload response during the OTIS CV test. It examines both the benefits and shortcomings of assumptions made pre-test to simplify model execution when compared against test data. It explores in detail the role of temperature-dependent emissivities during transition to cryogenic temperatures, as well as the impact that model geometry simplifications have on tracking of critical hardware limits and constraints. This work concludes with a list of recommendations to improve the accuracy of thermal modeling for future large cryogenic tests. It is hoped that the insight gained from the OTIS CV test thermal modeling will benefit planning and execution for upcoming cryogenic missions.

JWST↗

Thermal Model Performance for the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in early 2019, is currently undergoing a series of system-level environmental tests to verify its workmanship and end-to-end functionality. As part of this series, the Optical Telescope Element and Integrated Science Instrument Module (OTIS) Cryo-Vacuum (CV) test, the most complex cryogenic test executed to date by NASA, has recently been completed at the Johnson Space Center’s Chamber A facility. The OTIS CV test was intended as a comprehensive test of the integrated instrument and telescope systems to fully understand its optical, structural, and thermal performance within its intended flight environment. Due to its complexity, extensive pre-test planning was required to ensure payload safety and compliance with all limits and constraints. A system-level pre-test thermal model was constructed which fully captured the behavior of the payload, ground support equipment, and surrounding test chamber. This thermal model simulated both the transient cooldown to and warmup from a 20K flight-like environment, as well as predicted the payload performance at cryo-stable conditions. The current work is a preliminary assessment of thermal model performance against actual payload response during the OTIS CV test. Overall, the thermal model performed exceedingly well at predicting schedule and payload response. Looking in depth, this work examines both the benefits and shortcomings of assumptions made pre-test to simplify model execution when compared against test data. It explores in detail the role of temperature-dependent emissivities during transition to cryogenic temperatures, as well as the impact that model geometry simplifications have on tracking of critical hardware limits and constraints. This work concludes with a list of recommendations to improve the accuracy of thermal modeling for future large cryogenic tests. It is hoped that the insight gained from the OTIS CV test thermal modeling will benefit planning and execution for upcoming cryogenic missions.

Yang, Kan↗

Augmented Method to Improve Thermal Data for the Figure Drift Thermal Distortion Predictions of the JWST OTIS Cryogenic Vacuum Test

The JWST Optical Telescope Element (OTE) assembly is the largest optically stable infrared-optimized telescope currently being manufactured and assembled, and is scheduled for launch in 2018. The JWST OTE, including the 18 segment primary mirror, secondary mirror, and the Aft Optics Subsystem (AOS) are designed to be passively cooled and operate near 45K. These optical elements are supported by a complex composite backplane structure. As a part of the structural distortion model validation efforts, a series of tests are planned during the cryogenic vacuum test of the fully integrated flight hardware at NASA JSC Chamber A. The successful ends to the thermal-distortion phases are heavily dependent on the accurate temperature knowledge of the OTE structural members. However, the current temperature sensor allocations during the cryo-vac test may not have sufficient fidelity to provide accurate knowledge of the temperature distributions within the composite structure. A method based on an inverse distance relationship among the sensors and thermal model nodes was developed to improve the thermal data provided for the nanometer scale WaveFront Error (WFE) predictions. The Linear Distance Weighted Interpolation (LDWI) method was developed to augment the thermal model predictions based on the sparse sensor information. This paper will encompass the development of the LDWI method using the test data from the earlier pathfinder cryo-vac tests, and the results of the notional and as tested WFE predictions from the structural finite element model cases to characterize the accuracies of this LDWI method.

Thermal Modeling↗

Thermal Considerations for Reducing the Cooldown and Warmup Duration of the James Webb Space Telescope OTIS Cryo-Vacuum Test

The James Webb Space Telescope (JWST), set to launch in 2018, is NASAs next-generation flagship telescope. The Optical Telescope Element (OTE) and Integrated Science Instrument Module (ISIM) contain all of the optical surfaces and instruments to capture and analyze the telescopes infrared targets. The integrated OTE and ISIM are denoted as OTIS, and will be tested as a single unit in a critical thermal-vacuum test in mid-2017 at NASA Johnson Space Centers Chamber A facility. The payload will be evaluated for workmanship and functionality in a 20K simulated flight environment during this thermal-vacuum test. However, the sheer thermal mass of the OTIS payload as well as the restrictive gradient, rate, and contamination-related constraints placed on test components precludes rapid cooldown or warmup to its steady-state cryo-balance condition. Hardware safety considerations precludes injection of helium gas for free molecular heat transfer. Initial thermal analysis predicted that transient radiative cooldown from ambient temperatures, while meeting all limits and constraints, would take 33.3 days; warmup similarly would take 28.4 days. This paper discusses methods used to reduce transition times from the original predictions through modulation of boundary temperatures and environmental conditions. By optimizing helium shroud transition rates and heater usage, as well as rigorously re-examining previously imposed constraints, savings of up to three days on cooldown and up to a week on warmup can be achieved. The efficiencies gained through these methods allow the JWST thermal test team to create faster cooldown and warmup profiles, thus reducing the overall test duration and cost, while keeping all of the required test operations.

Thermal↗

Successful Completion of the JWST OGSE2 Cryogenic Test at JSC Chamber-A While Managing Numerous Challenges

The James Webb Space Telescope (JWST) Optical Telescope Element (OTE) assembly is the largest optically stable infrared-optimized telescope currently being manufactured and assembled, and scheduled for launch in 2018. The JWST OTE, including the primary mirrors, secondary mirror, and the Aft Optics Subsystems (AOS) are designed to be passively cooled and operate at near 45 degrees Kelvin. Due to the size of its large sunshield in relation to existing test facilities, JWST cannot be optically or thermally tested as a complete observatory-level system at flight temperatures. As a result, the telescope portion along with its instrument complement will be tested as a single unit very late in the program, and on the program schedule critical path. To mitigate schedule risks, a set of 'pathfinder' cryogenic tests will be performed to reduce program risks by demonstrating the optical testing capabilities of the facility, characterizing telescope thermal performance, and allowing project personnel to learn valuable testing lessons off-line. This paper describes the 'pathfinder' cryogenic test program, focusing on the recently completed second test in the series called the Optical Ground Support Equipment 2 (OGSE2) test. The JWST OGSE2 was successfully completed within the allocated project schedule while faced with numerous conflicting thermal requirements during cool-down to the final cryogenic operational temperatures, and during warm-up after the cryo-stable optical tests. The challenges include developing a pre-test cool-down and warm-up profiles without a reliable method to predict the thermal behaviors in a rarified helium environment, and managing the test article hardware safety driven by the project Limits and Constraints (L&C's). Furthermore, OGSE2 test included the time critical Aft Optics Subsystem (AOS), a part of the flight Optical Telescope Element that would need to be placed back in the overall telescope assembly integrations. The OGSE2 test requirements included the strict adherence of the project contamination controls due to the presence of the contamination sensitive flight optical elements. The test operations required close coordination of numerous personnel while they being exposed and trained for the 'final' combined OTE and instrument cryo-test in 2017. This paper will also encompass the OGSE2 thermal data look-back review.

JWST OGSE2 Cryogenic Test↗

The CALIPSO Integrated Thermal Control Subsystem

The Cloud-Aerosol Lidar and Infrared Pathfinder Satellite Observation (CALIPSO) is a joint NASA-CNES mission to study the Earth's cloud and aerosol layers. The satellite is composed of a primary payload (built by Ball Aerospace) and a spacecraft platform bus (PROTEUS, built by Alcatel Alenia Space). The thermal control subsystem (TCS) for the CALIPSO satellite is a passive design utilizing radiators, multi-layer insulation (MLI) blankets, and both operational and survival surface heaters. The most temperature sensitive component within the satellite is the laser system. During thermal vacuum testing of the integrated satellite, the laser system's operational heaters were found to be inadequate in maintaining the lasers required set point. In response, a solution utilizing the laser system's survival heaters to augment the operational heaters was developed with collaboration between NASA, CNES, Ball Aerospace, and Alcatel-Alenia. The CALIPSO satellite launched from Vandenberg Air Force Base in California on April 26th, 2006. Evaluation of both the platform and payload thermal control systems show they are performing as expected and maintaining the critical elements of the satellite within acceptable limits.

Gasbarre, Joseph F.↗

The Calipso Thermal Control Subsystem

The Cloud-Aerosol Lidar and Infrared Pathfinder Satellite Observation (CALIPSO) is a joint NASA-CNES mission to study the Earth s cloud and aerosol layers. The satellite is composed of a primary payload (built by Ball Aerospace) and a spacecraft platform bus (PROTEUS, built by Alcatel Alenia Space). The thermal control subsystem (TCS) for the CALIPSO satellite is a passive design utilizing radiators, multi-layer insulation (MLI) blankets, and both operational and survival surface heaters. The most temperature sensitive component within the satellite is the laser system. During thermal vacuum testing of the integrated satellite, the laser system s operational heaters were found to be inadequate in maintaining the lasers required set point. In response, a solution utilizing the laser system s survival heaters to augment the operational heaters was developed with collaboration between NASA, CNES, Ball Aerospace, and Alcatel-Alenia. The CALIPSO satellite launched from Vandenberg Air Force Base in California on April 26th, 2006. Evaluation of both the platform and payload thermal control systems show they are performing as expected and maintaining the critical elements of the satellite within acceptable limits.

Gasbarre, Joseph F.↗

Hubble Space Telescope Thermal Blanket Repair Design and Implementation

Substantial damage to the outer layer of Hubble Space Telescope (HST) thermal blankets was observed during the February 1997 servicing mission. After six years in LEO, many areas of the aluminized Teflon(R) outer blanket layer had significant cracks, and some material was peeled away to expose inner layers to solar flux. After the mission, the failure mechanism was determined, and repair materials and priorities were selected for follow-on missions. This paper focuses on the thermal, mechanical, and EVA design requirements for the blanket repair, the creative solutions developed for these unique problems, hardware development, and testing.

Ousley, Wes↗

The Submillimeter-Wave Astronomy Satellite: On-Orbit Thermal Performance and Design Retrospective

A large telescope aperture, stringent thermal stability and temperature range requirements, and a passively-cooled 1500K module presented major challenges in thermal design and hardware fabrication of this Small Explorer satellite. This paper reviews briefly the thermal design of the SWAS science instrument, and examines the first three months of on-orbit thermal history. Measured temperatures for both the science payload and the spacecraft module and solar arrays are compared with those predicted by the correlated analytical model. Similarities and differences are interpreted in terms of the major uncertainties remaining after thermal-balance testing, especially those of MLI performance and telescope aperture properties. Review of the thermal model adequacy and thermal design verification are included to suggest improvements in the thermal design process for future missions.

Boyd, David A.↗

The Submillimeter-Wave Astronomy Satellite: On-Orbit Thermal Performance and Design Retrospective

A large telescope aperture, stringent thermal stability and temperature range requirements, and a passively-cooled 150 K module presented major challenges in thermal design and hardware fabrication of this Small Explorer satellite. This paper reviews briefly the thermal design of the SWAS science instrument, and examines the first three months of on-orbit thermal history. Measured temperatures for both the science payload and the spacecraft module and solar arrays are compared with those predicted by the correlated analytical model. Similarities and differences are interpreted in terms of the major uncertainties remaining after thermal-balance testing, especially those of MLI performance and telescope aperture properties. Review of the thermal model adequacy and thermal design verification are included to suggest improvements in the thermal design process for future missions.

Boyd, David A.↗

Thermal performance testing of the Explorer Platform

The Explorer Platform (EP) has been designed to accommodate on-orbit payload and bus module changeout via Space Transportation System (STS) servicing. Such a versatile spacecraft platform designed to experience widely different environmental exposures and operational conditions, coupled with program constraints on schedule and budget, presented a challenge to implementing a technically sound thermal vacuum/thermal balance test program. This paper discusses thermal performance tests implemented at the subsystem and system levels, and the risks accepted resulting from test sequence, configuration. and tests omitted from the program. No thermal cycling or thermal balance tests were performed on the integrated spacecraft level, although both the Payload (EUVE) and Platform (EP) received independent testing. The decision to take this approach is discussed with respect to the thermal design and the associated risks taken to maintain budget and schedule.

Wasson, David↗