Assessment of M2020 Terrain Relative Landing Accuracy: Flight Performance vs Predicts
No abstract provided
Engineering topics
Publications and source records attributed to Otero, Richard.
No abstract provided
Terrain Relative Navigation (TRN) was a critical enabling Entry, Descent, and Landing (EDL) technology that enabled Mars 2020 mission Perseverance rover to land at Jezero crater. TRN pro-vides real-time, autonomous, map-relative position determination and generates a landing target based on a priori knowledge of hazards. The required performance for TRN was to land within 60m of the selected target. The required 60m was sub-allocated to various error sources in three major categories: targeting error, knowledge error, and control error. The targeting error is the error in selecting an appropriate landing target and the knowledge of the target on the surface. It includes the Lander Vision System (LVS) position localization with respect the ground, the synchronization between the Lander Vision System measurement and the main Navigation filter, and errors associated with the LVS Reference Map and Safe Target Selec-tion (STS). The knowledge error is the contribution of knowledge growth from the synchronization with LVS to touchdown. The control error encompasses how accurately the system could stay on the desired reference trajectory. The TRN error budget uses a combination of analysis, simulation, and hardware test-ing results to bound the various error contributions obtained during the verification and validation process. This paper first presents a description the TRN system, focusing on the architecture of LVS and STS. The paper then gives detailed overview of the TRN error budget, with a description of the major error contribu-tions in each of the three categories. Next, the paper gives the results for three versions of the error budget, pre-launch, in-flight pre-landing, and post-landing. The paper compares the pre-flight analysis, the pre-landing analysis using in-flight data during cruise, to the post-landing analysis of the TRN performance. Pre-landing analysis best estimate of the landing performance was 33m, compared to the 60m require-ment. Post-landing analysis estimated a landing accuracy of 8.53m or better, much better than the 33m pre-landing estimate. The actual post-landing imagery calculated the distance of the rover to the targeted location to be 5m. The post-landing analysis closely bounds the image-based assessment of landing accu-racy, indicating the success of the error budget architecture in bounding the landing accuracy, as well as the fidelity of the simulations used to model and predict performance.
Building upon the success of the Mars Science Laboratory (MSL) landing and surface mission, the Mars 2020 project is a flagship-class science mission intended to address key questions about the potential for life on Mars and collect samples for possible Earth return by a future mission. [1] Mars 2020 will also demonstrate technologies needed to enable future human expeditions to Mars. Utilizing the groundbreaking entry, descent, and landing (EDL) architecture pioneered by the MSL, [2] [3] Mars 2020 will launch in July 2020 and land on Mars in February 2021.
This paper is to describe the engineering challenges in the surface mobility of the Mars 2020 Rover mission that are considered in the landing site selection process, introduce new automated traversability analysis capabilities, and present the preliminary analysis results for top candidate landing sites.
The objective of this paper is three-fold: 1) to describe the engineering challenges in the surface mobility of the Mars 2020 Rover mission that are considered in the landing site selection processs, 2) to introduce new automated traversability analysis capabilities, and 3) to present the preliminary analysis results for top candidate landing sites. The analysis capabilities presented in this paper include automated terrain classification, automated rock detection, digital elevation model (DEM) generation, and multi-ROI (region of interest) route planning. These analysis capabilities enable to fully utilize the vast volume of high-resolution orbiter imagery, quantitatively evaluate surface mobility requirements for each candidate site, and reject subjectivity in the comparison between sites in terms of engineering considerations. The analysis results supported the discussion in the Second Landing Site Workshop held in August 2015, which resulted in selecting eight candidate sites that will be considered in the third workshop.