Engineering Papers⌕ Search

Engineering topics

Nutt, William

Publications and source records attributed to Nutt, William.

Execution Strategy Analysis (ESA) Origin Sites Readiness Model - 19073

This is a technical paper that does not take into account the contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in multi-assembly canisters to be an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail. The DOE Office of Nuclear Energy (DOE-NE) Office of Spent Fuel and Waste Disposition (SFWD) Integrated Waste Management System (IWMS) program is developing an Execution Strategy Analysis (ESA) Origin Sites Readiness Model using the Goldsim{sup TM} software application to provide information on potential future approaches for removing SNF and HLW from origin sites such as commercial nuclear power plant sites. The purpose of this ESA model is to apply integrated waste management system analysis, system engineering, and decision analysis principles to inform future decisions regarding potential future nuclear waste management system architectures. The ESA Origin Sites Readiness Model is a dynamic simulation modeling capability. It is developed for use in the analysis and comparison of potential future implementation strategies associated with an integrated nuclear waste management program. The model is designed to be independent of the destination of the SNF or HLW so the results from the Origin Sites Readiness Model are equally applicable to a wide range of scenarios involving shipments to generic destinations in an integrated waste management system. The model explicitly takes significant assumptions, uncertainties, and risks into account. Currently, the ESA Origin Sites Readiness Model includes 14 shutdown sites (Maine Yankee, Yankee Rowe, Connecticut Yankee, Vermont Yankee, La Crosse, Big Rock Point, Zion, Kewaunee, Fort Calhoun, Trojan, Rancho Seco, Humboldt Bay, San Onofre, and Crystal River) and is designed to be modular so that other sites can be added in the future. The model also includes multiple transportation modes (heavy haul truck, rail, and barge), activities related to the acquisition of transportation assets such as railcars and transportation casks, and site-specific considerations of on-site and near-site transportation infrastructure. The model was developed using the ESA process with Subject Matter Experts (SME); it incorporates uncertainty and risks and provides a structured, systematic methodology for evaluating potential SNF campaign scenarios. The model also complements other system-level logistics tools being developed by SFWD. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Virtual Simulation of Spent Nuclear Fuel Repackaging Facility Design Concepts - 19479

This paper presents recent implementation of virtual simulation of SNF repackaging facility operation. The development was based on recent wet and dry facility design concepts. The development involved creating equipment and facility models and implementation of discrete event simulation of large-scale facility-level operation. Lastly, it presented how a hardware-in-the-loop simulation is possible and that a good amount of accuracy was retained from virtual simulation to hardware simulation for the tested configuration. It is expected that this type of simulation will act as a proof of concept for system engineers and help them make more informed decisions when considering potential solutions for SNF handling and disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗