Nicklaus, Dennis

Publications and source records attributed to Nicklaus, Dennis.

Disentangling Beam Losses in The Fermilab Main Injector Enclosure Using Real-Time Edge AI

The Fermilab Main Injector enclosure houses two accelerators, the Main Injector and Recycler Ring. During normal operation, high intensity proton beams exist simultaneously in both. The two accelerators share the same beam loss monitors (BLM) and monitoring system. Deciphering the origin of any of the 260 BLM readings is often difficult. The (Accelerator) Real-time Edge AI for Distributed Systems project, or READS, has developed an AI/ML model, and implemented it on fast FPGA hardware, that disentangles mixed beam losses and attributes probabilities to each BLM as to which machine(s) the loss originated from in real-time. The model inferences are then streamed to the Fermilab accelerator controls network (ACNET) where they are available for operators and experts alike to aid in tuning the machines.

43 PARTICLE ACCELERATORS↗

Semantic Regression for Disentangling Beam Losses in the Fermilab Main Injector and Recycler

Fermilab’s Main Injector enclosure houses two accelerators: the Main Injector (MI) and the Recycler (RR). In periods of joint operation, when both machines contain high intensity beam, radiative beam losses from MI and RR overlap on the enclosure’s beam loss monitoring (BLM) system, making it difficult to attribute those losses to a single machine. Incorrect diagnoses result in unnecessary downtime that incurs both financial and experimental cost. In this work, we introduce a novel neural approach for automatically disentangling each machine’s contributions to those measured losses. Using a continuous adaptation of the popular UNet architecture in conjunction with a novel data augmentation scheme, our model accurately infers the machine of origin on a per-BLM basis in periods of joint and independent operation. Crucially, by extracting beam loss information at varying receptive fields, the method is capable of learning both local and global machine signatures and producing high quality inferences using only raw BLM loss measurements.

43 PARTICLE ACCELERATORS↗

Beam Commissioning and Integrated Test of the PIP-II Injector Test Facility

The PIP-II Injector Test (PIP2IT) facility is a near-complete low energy portion of the Superconducting PIP-II linac driver. PIP2IT comprises the warm front end and the first two PIP-II superconducting cryomodules. PIP2IT is designed to accelerate a 2 mA H⁻ beam to an energy of 20 MeV. The facility serves as a testbed for a number of advanced technologies required to operate PIP-II and provides an opportunity to gain experience with commissioning of the superconducting linac, significantly reducing project technical risks. Some PIP2IT components are contributions from international partners, who also lend their expertise to the accelerator project. The project has been successfully commissioned with the beam in 2021, demonstrating the performance required for the LBNF/DUNE. In this paper, we describe the facility and its critical systems. We discuss our experience with the integrated testing and beam commissioning of PIP2IT, and present commissioning results. This important milestone ushers in a new era at Fermilab of proton beam delivery using superconducting radio-frequency accelerators.

43 PARTICLE ACCELERATORS↗

LCSL-II Cryomodule Testing at Fermilab

Cold powered testing of all LCLS-II production cryomodules at Fermilab is complete as of February 2021. A total of twenty-five tests on both 1.3 GHz and 3.9 GHz cryomodules were conducted over a nearly five year time span beginning in the summer of 2016. During the course of this campaign cutting-edge results for cavity Q₀ and gradient in continuous wave operation were achieved. A summary of all test results will be presented, with a comparison to established acceptance criteria, as well as overall test stand statistics and lessons learned.

43 PARTICLE ACCELERATORS↗

Real-Time Edge AI for Distributed Systems (READS): Progress on Beam Loss De-Blending for the Fermilab Main Injector and Recycler

The Fermilab Main Injector enclosure houses two accelerators, the Main Injector and Recycler. During normal operation, high intensity proton beams exist simultaneously in both. The two accelerators share the same beam loss monitors (BLM) and monitoring system. Beam losses in the Main Injector enclosure are monitored for tuning the accelerators and machine protection. Losses are currently attributed to a specific machine based on timing. However, this method alone is insufficient and often inaccurate, resulting in more difficult machine tuning and unnecessary machine downtime. Machine experts can often distinguish the correct source of beam loss. This suggests a machine learning (ML) model may be producible to help de-blend losses between machines. Work is underway as part of the Fermilab Real-time Edge AI for Distributed Systems Project (READS) to develop a ML empowered system that collects streamed BLM data and additional machine readings to infer in real-time, which machine generated beam loss.

43 PARTICLE ACCELERATORS↗

Optimizing Mu2e Spill Regulation System Algorithms

A slow extraction system is being developed for the Fermilab’s Delivery Ring to deliver protons to the Mu2e experiment. During the extraction, the beam on target experiences small intensity variations owing to many factors. Various adaptive learning algorithms will be employed for beam regulation to achieve the required spill quality. We discuss here preliminary results of the slow and fast regulation algorithms validation through the computer simulations before their implementation in the FPGA. Particle tracking with sextupole resonance was used to determine the fine shape of the spill profile. Fast semi-analytical simulation schemes and Machine Learning models were used to optimize the fast regulation loop.

43 PARTICLE ACCELERATORS↗

Resonance Control System for the PIP-II IT HWR Cryomodule

The HWR (half-wave-resonator) cryomodule is the first one in the superconducting section of the PIP-II LINAC project at Fermilab. PIP-II IT is a test facility for the project where the injector, warm front-end, and the first two superconducting cryomodules are being tested. The HWR cryomodule comprises 8 cavities operating at a frequency of 162.5 MHz and accelerating beam up to 10 MeV. Resonance control of the cavities is performed with a pneumatically operated slow tuner which compresses the cavity at the beam ports. Helium gas pressure in a bellows mounted to an end wall of the cavity is controlled by two solenoid valves, one on the pressure side and one on the vacuum side. The resonant frequency of the cavity can be controlled in one of two modes. A pressure feedback control loop can hold the cavity tuner pressure at a fixed value for the desired resonant frequency. Alternately, the feedback loop can regulate the cavity tuner pressure to bring the RF detuning error to zero. The resonance controller is integrated into the LLRF control system for the cryomodule. The control system design and performance of the resonance control system are described in this paper.

43 PARTICLE ACCELERATORS↗

Performance of the LLRF System for the Fermilab PIP-II Injector Test

PIP-II IT is a test facility for the PIP-II project where the injector, warm front-end, and the first two superconducting cryomodules are being tested. The 8-cavity half-wave-resonator (HWR) cryomodule operating at 162.5 MHz is followed by the 8-cavity single-spoke resonator(SSR1) cryomodule operating at 325 MHz. The LLRF systems for both cryomodules are based on a common SOC FPGA-based hardware platform. The resonance control systems for the two cryomodules are quite different, the first being a pneumatic system based on helium pressure and the latter a piezo/stepper motor type control. The data acquisition and control system can support both CW and Pulsed mode operations. Beam loading compensation is available which can be used for both manual/automatic control in the LLRF system. The user interfaces include EPICS, Labview, and ACNET. Testing of the RF system has progressed to the point of being ready for a 2 mA beam to be accelerated to 25 MeV. The design and performance of the field control and resonance control system operation with beam are presented in this paper.

43 PARTICLE ACCELERATORS↗