Engineering Papers⌕ Search

Engineering topics

Ng, Cho-Kuen

Publications and source records attributed to Ng, Cho-Kuen.

Status and future plans for C 3 R&D

C 3 is an opportunity to realize an e + e - collider for the study of the Higgs boson at √s = 250 GeV, with a well defined upgrade path to 550 GeV while staying on the same short facility footprint. C 3 is based on a fundamentally new approach to normal conducting linear accelerators that achieves both high gradient and high efficiency at relatively low cost. Given the advanced state of linear collider designs, the key system that requires technical maturation for C 3 is the main linac. This paper presents the staged approach towards a facility to demonstrate C 3 technology with both Direct (source and main linac) and Parallel (beam delivery, damping ring, ancillary component) R&D. The primary goal of the C 3 Demonstration R&D Plan is to reduce technical and cost risk by building and operating the key components of C 3 at an adequate scale. This R&D plan starts with the engineering design, and demonstration of one cryomodule and will culminate in the construction of a 3 cryomodule linac with pre-production prototypes. This R&D program would also demonstrate the linac rf fundamentals including achievable gradient and gradient stability over a full electron bunch train and breakdown rates. It will also investigate beam dynamics including energy spread, wakefields, and emittance growth. This work will be critical to confirm the suitability of the C 3 beam parameters for the physics reach and detector performance in preparation for a Conceptual Design Report (CDR), as well as for follow-on technology development and industrialization. The C 3 Demonstration R&D Plan will open up significant new scientific and technical opportunities based on development of high-gradient and high-efficiency accelerator technology. It will push this technology to operate both at the GeV scale and mature the technology to be reliable and provide high-brightness electron beams. The timeline for progressing with C 3 technology development will be governed by practical limitations on both the technical progress and resource availability. It consists of four stages: Stage 0) Ongoing fundamental R&D on structure prototypes, damping and vibrations. Stage 1) Advancing the engineering maturity of the design and developing start-to-end simulations including space-charge and wakefield effects. This stage will include testing of strucutres operating at cryogenic temperatures. Beam tests would be performed with high beam current to test full beam loading. Stage 2) Production and testing of the first cryomodule at cryogenic temperatures. This would provide sufficient experimental data to compile a CDR and it is anticipated for Stage 2 to last 3 years and to culminate with the transport of photo-electrons through the first cryomodule. Stage 3) Updates to the engineering design of the cryomodules, production of the second and third cryomodule and their installation. Lower charge and lower emittance beams will be used to investigate emittance growth. The successful full demonstration of the 3 cryomodules to deliver up to a 3 GeV beam and achieve the C 3 five gradient will allow a comprehensive and robust evaluation of the technical design of C 3 as well as mitigate technical, schedule, and cost risks required to proceed with a Technical Design Report (TDR).

radiation hardened magnets↗

Beam delivery and beamstrahlung considerations for ultra-high energy linear colliders

As part of the Snowmass'21 community planning excercise, the Advanced Accelerator Concepts (AAC) community proposed future linear colliders with center-of-mass energies up to 15 TeV and luminosities up to 50 × 1034 cm -2 s -1 in a compact footprint. In addition to being compact, these machines must also be energy efficient. We identify two challenges that must be addressed in the design of these machines. First, the Beam Delivery System (BDS) must not add significant length to the accelerator complex. Second, beam parameters must be chosen to mitigate beamstrahlung effects and maximize the luminosity-per-power of the machine. In this paper, we review advances in plasma lens technology that will help to reduce the length of the BDS system, and we detail new Particle-in-Cell simulation studies that will provide insight into beamstrahlung mitigation techniques. We apply our analysis to both $e$ + $e$ - and $γγ$ colliders. The challenges and solutions described in this paper are considered independently. In conclusion, a unified, self-consistent concept for a BDS system for a 15 TeV linear collider will be the subject of future work.

47 OTHER INSTRUMENTATION↗

Multi-objective optimization with an integrated electromagnetics and beam dynamics workflow

In particle accelerators, RF cavities are used to accelerate charged particle beams to designed high energy for physical applications. In a typical accelerator design, the optimization of RF cavities and the optimization of beam dynamics are carried out in separate studies. For a more general and unrestricted accelerator design, a coupled optimization of the RF cavities and the beam parameters is required. For this coupled optimization problem, we have developed an integrated electromagnetics and beam dynamics workflow management system. Within this system, the geometries for a set of cavity components are first adjusted; the field modes are then computed with an electromagnetics program, and imported into a beam dynamics program for beam dynamics simulation. This workflow is encapsulated into a parallel multi-objective optimizer to achieve the integrated accelerator design optimization. A multi fidelity strategy is developed to improve the speed of the optimizer. Furthermore, this integrated global optimization capability is illustrated using a photoinjector design example and yields an improved design.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗