Engineering Papers⌕ Search

Engineering topics

Neuffer, David

Publications and source records attributed to Neuffer, David.

At least 55 records · Page 3

A Staged Muon-based Facility to Enable Intensity and Energy Frontier Science in the US

Muon-based facilities offer a unique potential to provide capabilities at both the Intensity Frontier with Neutrino Factories and the Energy Frontier with Muon Colliders ranging from the Higgs energy to the multi-TeV energy range. They rely on novel technology with challenging parameters, for which the feasibility is currently being assessed by the U.S. Muon Accelerator Program (MAP) [1]. A realistic scenario for a complementary series of staged facilities with increasing complexity and significant physics potential at each stage has been developed. It takes advantage of and leverages the capabilities already planned at Fermilab, especially Project X and LBNE. Each stage is defined in such a way as to provide an R&D platform to validate the technologies required for subsequent stages. The rationale and sequence of a realistic staging process are presented.

Delahaye, Jean-Pierre↗

Design of the beam combination section for stochastic injection

The stochastic injection scenario proposed by D. Neuffer in early 1980’s [1] features the injection and acceptance of pions into the muon storage ring, and is used in the design and simulation of nuSTORM injection and ring [2,3]. The pions decay to muons in the long decay straight section of the ring, then the secondary muons are accepted by the straight FODO structure. The critical design element in this scenario is the Beam Combination Section (BCS), which serially includes a defocusing quadrupole, a bending dipole, and a focusing quadrupole. This paper describes in detail the the design of such a BCS and the matching from this BCS to the downstream side of magnetic horn used to collect the pions after target.

43 PARTICLE ACCELERATORS↗

Determining the Pion Reference Momentum for nuSTORM Injection Design

The stochastic injection scenario used by nuSTORM features the pion decay and secondary muon acceptance in the storage ring’s long decay straight [1,2]. The designed momentum acceptance of the nuSTORM decay ring is centered at 3.8 GeV/c, based on neutrino detector performance, with a $\pm\,$10% bin. In order to design the injection section, and to obtain as many useful muons from pion decay as possible, the center momentum of the pion beam being injected needs to be carefully chosen. This paper describes in detail the determination of the center momentum of the pion beam, with simulation from G4Beamline [3].

43 PARTICLE ACCELERATORS↗

Energy Deposition and Shielding Study of the Front End for the Neutrino Factory

In the Neutrino Factory and Muon Collider muons are produced by firing high energy protons onto a target to produce pions. The pions decay to muons which are then accelerated. This method of pion production results in significant background from protons and electrons, which may result in heat deposition on superconducting materials and activation of the machine preventing manual handling. In this paper we discuss the design of a secondary particle handling system. The system comprises a solenoidal chicane that filters high momentum particles, followed by a proton absorber that reduces the energy of all particles, resulting in the rejection of low energy protons that pass through the solenoid chicane. We detail the design and optimization of the system and energy deposition and shielding analysis in MARS15.

43 PARTICLE ACCELERATORS↗

Numerical study of a bucked-coil system for muon transport and cooling

A Neutrino Factory, which can deliver an intense flux of {approx}10{sup 21} neutrinos per year from a multi-GeV stored muon-beam is seemingly the ideal tool for studying neutrino oscillations and CP-violations for leptons. The front-end of this facility plays a critical role in determining the number of muons that can be accepted by the downstream accelerators. Delivering peak performance requires transporting the muon beams through long sections of a beam channel containing high-gradient rf cavities and strong focusing solenoids. Here, we propose a novel scheme to improve the performance of the cavities, thereby increasing the number of muons within the acceptance of the accelerator chain. The key element of our new scheme is to apply a set of bucked coils along the lattice, thus forcing the external magnetic field to drop substantially within the cavity. We incorporate this idea into a new lattice design for a Neutrino Factory, and detail its performance numerically.

43 PARTICLE ACCELERATORS↗

Use of Helical Transport Channels for Bunch Recombination

Cooling scenarios for a high-luminosity Muon Collider require bunch recombination for optimal luminosity. In this report we note that the tunable chronicity property of a helical transport channel (HTC) makes it a desirable component of a bunch recombiner. A large chronicity HTC is desirable for the bunch recombining transport, while more isochronous transport may be preferred for rf manipulations. Scenarios for bunch recombination are presented, with initial 1-D simulations, in order to set the stage for future 3-D simulation and optimization. HTC transports may enable a very compact bunch recombiner.

43 PARTICLE ACCELERATORS↗

Bunch Coalescing in a Helical Channel

A high-luminosity Muon Collider requires bunch recombination for optimal luminosity. In this report, we take advantage of the large slip factor in a helical transport channel (HTC) to coalesce bunches of muons into a single one over a shorter distance than can be achieved over a straight channel. To reduce complications associated with matching out of upstream and into downstream subsystems, we designed the bunch coalescing subsystem with a value for the slip factor that is representative of an existing helical cooling channel (HCC) design. Alternate designs have been developed to investigate the tradeoffs between simplifications in reducing the number of RF cavities versus performance. All key components of the bunch coalescing subsystem have been simulated in 3-D.

43 PARTICLE ACCELERATORS↗

H2 Gas-filled RF Cavities and the Neutrino Factory Front End

RF breakdown has been observed in high gradient RF cavities within large magnet fields. Recent experiments and analyses also show that RF breakdown is suppressed in gas-filled RF cavities, but that large beam loading effects could occur. The front end of a neutrino factory or muon collider requires high gradient RF within magnetic fields and gas-filled RF cavities could avoid breakdown. Beam loading caused by secondary electrons produced within the gas by beam ionization can be very large. The effect at Front End parameters and its mitigation are discussed.

43 PARTICLE ACCELERATORS↗

Use of a Helical Channel with a Large Slip Factor for Bunch Recombination

Cooling scenarios for a high-luminosity Muon Collider require bunch recombination for optimal luminosity. In this report we note that the tunable slip factor of a helical transport channel (HTC) makes it a desirable component of a bunch recombiner. A HTC with a large slip factor is desirable for the bunch recombining transport, while more isochronous transport may be preferred for RF manipulations prior to bunch recombination. The effectiveness of a bunch recombiner that starts from a string of muon bunches is presented; the bunch centers are displaced in energy at 10 MeV intervals, with each bunch having 6-D emittances equivalent to that at the end of an HCC. Eleven bunches spread from 160 to 260 MeV are demonstrated to have kinematics at the end of the channel that favor them to be merged into a single bunch with greater than 99% efficiency, ignoring decays which would be roughly 3% over the 52 m long channel (Lz = 37m with pitch angle 45º) for 200 MeV muons. Future work will examine how to transform the mono-energetic bunches at the end of the HCC into those with displaced energies at which this study has started.

43 PARTICLE ACCELERATORS↗

IDR muon capture front end and variations

The (International Design Report) IDR neutrino factory scenario for capture, bunching, phase-energy rotation and initial cooling of {mu}'s produced from a proton source target is explored. It requires a drift section from the target, a bunching section and a {phi}-{delta}E rotation section leading into the cooling channel. The rf frequency changes along the bunching and rotation transport in order to form the {mu}'s into a train of equal-energy bunches suitable for cooling and acceleration. Optimization and variations are discussed. An important concern is rf limitations within the focusing magnetic fields; mitigation procedures are described. The method can be extended to provide muons for a {mu}{sup +}-{mu}{sup -} Collider; variations toward optimizing that extension are discussed.

43 PARTICLE ACCELERATORS↗

Positron Production for a Compact Tunable Intense Gamma Ray Source

A compact tunable gamma ray source has many potential uses in medical and industrial applications. One novel scheme to produce an intense beam of gammas relies on the ability to create a high flux of directional positrons. These positrons would traverse a dipole and wedge configuration to reduce their momentum spread and be directed onto a target to annihilate with electrons, producing an intense source of gammas. We present in this paper a study for the start of the process that aims to produce an intense beam of directional positrons.

43 PARTICLE ACCELERATORS↗

Proton Beam Formation at Fermilab for mu2e (and for NF/MC)

Proton bunch formation from the Fermilab proton sources for the mu2e experiment is discussed. In the initial scenario a single intense h = 1 bunch is formed in the Accumulator/Debuncher, with slow extraction providing the required spill. However, the mu2e experiment could use h = 4 bunching in the Accumulator rather than h = 1, with the 4 bunches fed one at a time into the more isochronous Debuncher for slow extraction. The h = 4 variant has several advantages and a few disadvantages, and can reduce peak beam intensities, and therefore improve space charge limits. The method can be extended to project X to enable high duty cycle extraction within space charge limits. A further extension should make possible an accumulator/buncher scenario that can provide 8 GeV short bunches for a neutrino factory and/or muon collider scenario.

43 PARTICLE ACCELERATORS↗

Use of Helical Transport Channels for Bunch Recombination

Cooling scenarios for a high-luminosity Muon Collider require bunch recombination for optimal luminosity. In this report we note that the tunable chronicity property of a helical transport channel (HTC) makes it a desirable component of a bunch recombiner. A large chronicity HTC is desirable for the bunch recombining transport, while more isochronous transport may be preferred for rf manipulations. Scenarios for bunch recombination are presented, with initial 1-D simulations, in order to set the stage for future 3-D simulation and optimization. HTC transports may enable a very compact bunch recombiner.

43 PARTICLE ACCELERATORS↗

Studies toward a Candidate IDS Neutrino Factory Front-End Configuration

A front end scenario for the IDS neutrino factory is presented. The scenario is based on the Study 2A example for capture, bunching and phase-energy rotation of muons from a proton source for a neutrino factory, and the goal is the capture of a maximal number of muons in a string of 201.25 MHz rf bunches. We present a candidate release scenario that is somewhat shorter than the Study 2A example and its parameters are optimized for smaller magnetic fields and gradients. We consider the variation of performance with achievable gradient, obtaining acceptable capture with reduced gradients. We also consider variation in production target performance, and develop the specifications toward the practical requirements of the cost study.

43 PARTICLE ACCELERATORS↗

Proton beam formation at Fermilab for Mu2e (and for NF/MC)

Proton bunch formation from the Fermilab proton sources for the mu2e experiment is discussed. In the initial scenario a single intense h=1 bunch is formed in the Accumulator/Debuncher, with slow extraction providing the required spill. However, the mu2e experiment could use h=4 bunching in the Accumulator rather than h=1, with the 4 bunches fed one at a time into the more isochronous Debuncher for slow extraction. The h=4 variant has several advantages and a few disadvantages, and can reduce peak beam intensities, and therefore improve space charge limits. The method can be extended to project X to enable high duty cycle extraction within space charge limits. A further extension should make possible an accumulator/buncher scenario that can provide 8 GeV short bunches for a neutrino factory and/or muon collider scenario.

43 PARTICLE ACCELERATORS↗