Engineering Papers⌕ Search

Engineering topics

Narang, David

Publications and source records attributed to Narang, David.

33 records · Page 2

Informative Background on the Interoperability Requirements in IEEE Std 1547-2018

The intent of this document is to support local authorities governing interconnection requirements in adopting the most current requirements for interconnecting distributed energy resources (DERs) to the electric distribution system, as specified in the Institute of Electrical and Electronics Engineers Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces (IEEE Std 1547-2018 ). To create interconnection rules that successfully address policy goals, market trends, and technical requirements, electric service regulators need to be well informed of DER integration considerations. Interconnection processes and technical issues often overlap; the two are not easily segregated, and they are often considered and evaluated concurrently within the context of interconnection rulemaking. Accordingly, this document addresses both the technical issues and related process considerations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Considerations for Distributed Energy Resource Integration in Puerto Rico: DOE Multi-Lab Grid Modeling Support for Puerto Rico; Analytical Support for Interconnection and IEEE Std 1547-2018 National Renewable Energy Laboratory (Task 3.0)

To ensure the sustainable long-term recovery of Puerto Rico's electric power grid from hurricanes María and Irma and to build capacity to manage future potential natural disasters in the most secure and resilient way, the U.S. Department of Energy (DOE) convened experts from multiple national laboratories to develop a comprehensive set of data, models, analytic tools, and studies, considering inputs from a wide variety of stakeholder groups, to support technically sound recommendations for Puerto Rico's energy investment decisions. A resilient electric grid is vital to Puerto Rico's security, economy, and way of life, and it will provide the foundation for essential services that people and businesses on the island rely on every day. This report shows progress for a grid modeling task under the DOE-sponsored project that is a collaboration among the National Renewable Energy Laboratory (NREL) and other national laboratories. In Phase 1 of the multilab effort to support Puerto Rico's recovery, NREL provided the utility company Puerto Rico Electric Power Authority (PREPA) recommendations for a new framework of interconnection standards to accelerate the integration of utility-scale, transmission-connected renewable electrical generation and energy storage that ensure cross-technology compatibility and enable high deployment levels without compromising grid reliably, safety, or security. This Phase 2 report focuses on the interconnection of distributed energy resources (DERs) to the electric distribution system in Puerto Rico. This report is intended to familiarize the reader with Puerto Rico's distribution infrastructure and operational practices and procedures that are relevant to DER interconnection. The report also provides considerations for streamlining the interconnection process given the expected increase in deployments resulting from Puerto Rico's renewable portfolio standard (RPS) goal of 100% renewables by 2050. Accordingly, the report identifies considerations and concerns associated with the increase in intermittent generation, strategies for DER interconnection best practices, and the potential use of the latest technological solutions identified in the latest revision of the Institute of Electrical and Electronics Engineers (IEEE) 1547-2018 interconnection standard.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Reduced-Order Parameterized Short-Circuit Current Model of Inverter-Interfaced Distributed Generators

The short-circuit response of inverter-interfaced distributed generators (IIDGs) is not adequately represented in many conventional protection studies. This paper presents an in-depth analysis of IIDG behavior during grid faults and proposes a more accurate reduced-order parameterized short-circuit current (RPSC) model of inverters. Typical inverter components are thoroughly investigated to identify those that play dominant roles during faults. The paper shows that the current limiter is the dominant factor for the steady-state fault-current of inverter; while the inverter filter along with the severity of the voltage disturbance largely determine the initial transient spike of inverter fault current. The proposed model is low-order and can be used in large scale simulations. The parameters of the proposed RPSC model can be extracted from laboratory experiments without requiring proprietary manufacturer information. The proposed fault-current model is analogous to the well-known synchronous machine model that segregates the inverter fault current into subtransient, transient, and steady-state fault currents. Finally, experimental and simulation tests are presented to validate the model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Fault Response of Distributed Energy Resources Considering the Requirements of IEEE 1547-2018

Inverter-based DER responses to faults on the electric power system are different than those of conventional generators and are often poorly understood. Inverter fault responses are largely software-defined, within physics-based constraints. DERs are regulated by standards and grid codes that also constrain their responses. Though fault response of DERs will vary widely, for any DER following any particular standard, a pattern of fault response can be synthesized by observing that particular standard. In this paper, the recently published IEEE 1547-2018 is examined to explore the general fault response of any DER that follows IEEE 1547-2018. Additionally, an IEEE 1547-2018 compliant inverter model is developed and tested in simulation to find the fault response, and that response is compared with the fault response of a commercial off-the-shelf inverter.

41 EE - Solar Energy Technologies Office (EE-4S)↗

TEMPEST (Thermo-Electric Model for Powering Energy Storage Technologies)

NREL's TEMPEST model combines electrical and thermal modeling for residential-scale battery systems. The model and default parameters are based off of two common commercial residential batteries. Key inputs to the model include house load, temperature of the battery location, and the solar profile. The key output of the TEMPEST model is the battery profile and internal battery temperature. If internal battery temperature exceeds limits, a derating will occur and this will be reflected in the battery profile. In addition to thermal modeling, the TEMPEST model uses realistic operating principals that are common in today's residential batteries. Mainly, the TEMPEST model incorporates "modes" of operation that constrain battery setpoint based on house load, solar output, and state of charge. The TEMPEST model can be used to analyze the effect of battery temperature, deratings, and mode setpoints on utility network loading and customer bills.

Blonsky, Michael↗

Fault Response of Distributed Energy Resources Considering the Requirements of IEEE 1547-2018

Inverter-based DER responses to faults on the electric power system are different than those of conventional generators and are often poorly understood. Inverter fault responses are largely software-defined, within physics-based constraints. DERs are regulated by standards and grid codes that also constrain their responses. Though fault response of DERs will vary widely, for any DER following any particular standard, a pattern of fault response can be synthesized by observing that particular standard. In this paper, the recently published IEEE 1547-2018 is examined to explore the general fault response of any DER that follows IEEE 1547-2018. Additionally, an IEEE 1547-2018 compliant inverter model is developed and tested in simulation to find the fault response, and that response is compared with the fault response of a commercial off-the-shelf inverter.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Clause-by-Clause Summary of Requirements in IEEE Standard 1547-2018

The revised IEEE 1547 standard (IEEE Std 1547-2018) contains eleven chapters (clauses) and eight annexes that comprise 136 pages. Each clause specifies information or requirements that apply to certain aspects important to the interconnection of distributed energy resources to the electric power system. Implementation of the requirements needs a careful study of the underlying technical concept and also needs the appropriate information that may be required to calculate various settings and configurations. This document aims to provide an introductory text to assist users of IEEE Std 1547-2018 in identifying the following questions: what is the primary audience of the clause/subclause? What knowledge is required to understand the technical subject matter? What information is required to apply/implement the requirements specified? What level of fluency with the subject matter is required to apply/implement the requirements?

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electric Distribution System Planning with DERs - High-level Assessment of Tools and Methods

This document addresses analytical tools and methods to support electric distribution system planning with distributed energy resources (DERs) and grid modernization, drawing on leading-edge research and examples from around the United States. In this report, tools include computer models and software, as well as other analytical aids and practices that support distribution system planning. At its core, distribution system planning is about supporting investment decisions. Enhanced and integrated distribution system planning allows utilities to move from a passive reactive role to smart proactive planning with respect to DERs. Distribution system planning can increase transparency around utility distribution system investments before they are brought to the regulatory body for cost recovery, can support deferring traditional infrastructure investments, and can provide information and incentives to customers and third parties about where DERs can help the grid. A growing number of states are beginning to consider a comprehensive distribution system planning process that addresses the costs and benefits of DERs, reflects more choices coming from the customer/third-party domains, is integrated with resource and transmission planning, and incorporates planning scenarios that reflect the dynamic and changing nature of the electricity system

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interoperability Maturity Model

This document presents the relevant concepts for specifying criteria that support a grid modernization strategic vision for interoperability. It focuses on the ways to assess levels of interoperability. The assessment of interoperability needs to clearly show the relationship to interoperability and provide the necessary data to create a roadmap for how to improve interoperability. A key point to understand is that interoperability has several crucial elements, any of which may have areas for improvement. To measure interoperability, it is helpful to focus on specific areas based on the objectives of the stakeholders that are initiating the desired interoperability advancement. The measurement tool for interoperability allows the measurement tool and the area to which it is being applied to be segmented and applied in various ways. The measurement tool is based on, and developed from, the GridWise® Architecture Council’s (GWAC’s) Beta release of its Interoperability Maturity Model (GWAC 2011). As such, it represents an evolution of that approach, so the working name used in this document is IMM.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interoperability Maturity Roadmap Methodology, V1.3

The Interoperability Roadmap Methodology document supports the U.S. Department of Energy (DOE) Grid Modernization Laboratory Consortium (GMLC) Interoperability Project’s efforts to advance interoperability as an essential component for the successful and more seamless integration of intelligent, communicating technologies into the electric power system. This proposed methodology supports the strategic approach to advance interoperability described in the GMLC Interoperability Project’s Interoperability Strategic Vision: Enabling an Interactive Grid. That document proposes engaging an ecosystem of businesses interested in integrating smart technology with the electric power system to develop an interoperability roadmap using a methodical approach. This roadmap methodology is to be applied to technology integration ecosystems (e.g., electric vehicles, photovoltaic inverters, or automated buildings), using tools that measure the state of interoperability today, to identify the gaps and challenges that can be overcome to improve interoperability, and thereby, simplify the integration process.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Ensuring System Reliability: Distributed Energy Resources and Bulk Power System Considerations

Rooftop solar energy, storage batteries, and electric vehicles are changing the way people use and produce electricity. These are among the growing set of technologies called distributed energy resources (DERs) because they are typically connected to the utility at the medium-voltage distribution system. In general, the utility distribution system connects substations to homes and businesses. The effect of DE Rs on operating the power grid has been dramatic and exciting, and they provide both challenges and benefits to the entire grid: spanning utilization, distribution, and transmission voltage ranges. The zero-carbon resources among the broader family of DE Rs are critical in complying with state and federal energy policies. This, in turn, has required grid operators, utilities, regulators, consumer advocates, and lawmakers to reach out across traditional domains to engage in the robust dialog and coordination needed to integrate distribution-level resources to the larger high-voltage grid and the networked bulk power systems (BPSs).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interoperability Strategic Vision

The Interoperability Strategic Vision whitepaper aims to promote a common understanding of the meaning and characteristics of interoperability and to provide a strategy to advance the state of interoperability as applied to integration challenges facing grid modernization. This includes addressing the quality of integrating devices and systems and the discipline to improve the process of successfully integrating these components as business models and information technology improve over time. The strategic vision for interoperability described in this document applies throughout the electric energy generation, delivery, and end-use supply chain. Its scope includes interactive technologies and business processes from bulk energy levels to lower voltage level equipment and the millions of appliances that are becoming equipped with processing power and communication interfaces. A transformational aspect of a vision for interoperability in the future electric system is the coordinated operation of intelligent devices and systems at the edges of grid infrastructure. This challenge offers an example for addressing interoperability concerns throughout the electric system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interconnection Assessment Methodology and Cost Benefit Analysis for High-Penetration PV Deployment in the Arizona Public Service System

In an effort to better understand the impacts of high penetrations of photovoltaic (PV) generators on distribution systems, Arizona Public Service and its partners completed a multi-year project to develop the tools and knowledge base needed to safely and reliably integrate high penetrations of utility- and residential-scale PV. Building upon the APS Community Power Project-Flagstaff Pilot, this project investigates the impact of PV on a representative feeder in northeast Flagstaff. To quantify and catalog the effects of the estimated 1.3 MW of PV that will be installed on the feeder (both smaller units at homes and large, centrally located systems), high-speed weather and electrical data acquisition systems and digital 'smart' meters were designed and installed to facilitate monitoring and to build and validate comprehensive, high-resolution models of the distribution system. These models are being developed to analyze the impacts of PV on distribution circuit protection systems (including coordination and anti-islanding), predict voltage regulation and phase balance issues, and develop volt/VAr control schemes. This paper continues from a paper presented at the 2014 IEEE PVSC conference that described feeder model evaluation and high penetration advanced scenario analysis, specifically feeder reconfiguration. This paper presents results from Phase 5 of the project. Specifically, the paper discusses tool automation; interconnection assessment methodology and cost benefit analysis.

14 SOLAR ENERGY↗

High Penetration of Photovoltaic Generation Study – Flagstaff Community Power (Final Technical Report, Results of Phases 2-5)

APS’s renewable energy portfolio, driven in part by Arizona’s Renewable Energy Standard (RES) currently includes more than 1100 MW of installed capacity, equating to roughly 3000 GWh of annual production. Overall renewable production is expected to grow to 6000 GWh by 2025. It is expected that distributed photovoltaics, driven primarily by lower cost, will contribute to much of this growth and that by 2025, distributed installations will account for half of all renewable production (3000GHW). As solar penetration increases, additional analysis may be required for routine utility processes to ensure continued safe and reliable operation of the electric distribution network. Such processes include residential or commercial interconnection requests and load shifting during normal feeder operations. Circuits with existing high solar penetration will also have to be studied and results will need to be evaluated for adherence to utility practices or strategy. Increased distributed PV penetration may offer benefits such as load offsetting, but it also has the potential to adversely impact distribution system operation. These effects may be exacerbated by the rapid variability of PV production. Detailed effects of these phenomena in distributed PV applications continue to be studied. Comprehensive, high-resolution electrical models of the distribution system were developed to analyze the impacts of PV on distribution circuit protection systems (including coordination and anti-islanding), predict voltage regulation and phase balance issues, and develop volt/VAr control schemes. Modeling methods were refined by validating against field measurements. To augment the field measurements, methods were developed to synthesize high resolution load and PV generation data to facilitate quasi-static time series simulations. The models were then extended to explore boundary conditions for PV hosting capability of the feeder and to simulate common utility practices such as feeder reconfiguration. The modeling and analysis methodology was implemented using open source tools and a process was developed to aid utility engineers in future interconnection requests. Methods to increase PV hosting capacity were also explored during the course of the study. A 700kVA grid-supportive inverter was deployed on the feeder and each grid support mode was demonstrated. Energy storage was explored through simulation and models were developed to calculate the optimum size and placement needed to increase PV hosting capacity. A tool was developed to aid planners in assigning relative costs and benefits to various strategies for increasing PV hosting capacity beyond current levels. Following the completion of the project, APS intends to use the tools and methods to improve the framework of future PV integration on its system. The tools and methods are also expected to aid other utilities to accelerate distributed PV deployment.

14 SOLAR ENERGY↗