Engineering Papers⌕ Search

Engineering topics

Myers, Lissa

Publications and source records attributed to Myers, Lissa.

Standardized Protocol for Real-Time APIs as Required by Title 23 CFR 680.116(c)

Improving the ability of drivers to easily locate working and available chargers is key to improving the public charging experience. Electric vehicle charging providers who are recipients of federal funds through the National Electric Vehicle Infrastructure (NEVI) Formula Program, Charging and Fueling Infrastructure (CFI) Discretionary Grant Program, and other funding programs as identified under Title 23 of the U.S. Code must deploy and maintain an application programming interface (API) to access information about charging stations they operate.1 This includes information about individual charging ports, pricing, and availability in accordance with the Federal Highway Administration’s National Electric Vehicle Infrastructure Standards and Requirements, 23 CFR 680.116(c), herein referred to as the minimum standards (Federal Highway Administration 2023). Specifically outlined in the minimum standards, states and other designated recipients are required to ensure that charging station information including location, connector type, power level, real-time status, and real-time price to charge are available free of charge to third-party software developers through an API. These requirements are intended to enable effective communication with consumers about available charging stations and help consumers make informed decisions about trip planning, including when and where to charge. This document provides a standardized protocol for how to structure data, data update frequency, and practices for making the data required to be shared via API usable for improving public transparency and the customer experience. These are recommendations only and do not modify the Federal Highway Administration’s minimum standards in any way.

33 ADVANCED PROPULSION SYSTEMS↗

National Electric Vehicle Infrastructure Formula Program Annual Report: Plan Year 2022-2023

The National Electric Vehicle Infrastructure (NEVI) Formula Program provides nearly $5 billion over 5 years to help states, the District of Columbia, and Puerto Rico (hereafter referred to as “states”) create a network of fast EV charging stations along designated Federal Highway Administration (FHWA) Alternative Fuel Corridors (AFCs), with emphasis along the Interstate Highway System. The first-year deployment plans were submitted to and reviewed by the Joint Office and FHWA and certified by FHWA in September 2022. To support the rollout of the NEVI Formula Program, the Joint Office has been providing technical assistance to the states since February 2022 and has developed DriveElectric.gov to serve as the front door for federal efforts to build out a national charging network. This report summarizes the key activities of the Joint Office in relation to the NEVI program and provides an individual and collective overview of the first-year deployment plans. The Joint Office will utilize the summary of these plans to inform program improvement and future technical assistance activities to support the states as they begin to implement their EV charging infrastructure.

33 ADVANCED PROPULSION SYSTEMS↗

Energy Resilience Assessment Methodology

With increasing utility grid outages in the United States, there is growing interest in assessing risk and developing mitigations to reduce the impact of grid outages and other power disruptions. The U.S. Department of Energy's National Renewable Energy Laboratory worked with military bases and stakeholders in their local community to develop a replicable energy resilience assessment methodology for sites, bases, and campuses to assess energy risks and develop prioritized solutions to increase site resilience. This includes steps to assess the baseline resilience of the site, identify and score hazards and vulnerabilities, analyze risks based on hazard likelihood and vulnerability probability and consequence, identify and prioritize mitigation actions based on cost, difficulty, and risk reduction, and then develop an action plan and implement solutions. The method focuses on risks to a site's primary missions, infrastructure, and population, as well as risks to infrastructure and population in the surrounding community that may impact the site.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗