Space Operations Center orbit altitude selection strategy

The strategy for the operational altitude selection has to respond to the Space Operation Center's (SOC) maintenance requirements and the logistics demands of the missions to be supported by the SOC. Three orbit strategies are developed: two are constant altitude, and one variable altitude. In order to minimize the effect of atmospheric uncertainty the dynamic altitude method is recommended. In this approach the SOC will operate at the optimum altitude for the prevailing atmospheric conditions and logistics model, provided that mission safety constraints are not violated. Over a typical solar activity cycle this method produces significant savings in the overall logistics cost.

Indrikis, J.

Space construction system analysis. Part 2: Platform definition

The top level system requirements are summarized and the accompanying conceptual design for an engineering and technology verification platform (ETVP) system is presented. An encompassing statement of the system objectives which drive the system requirements is presented and the major mission and subsystem requirements are described with emphasis on the advanced communications technology mission payload. The platform design is defined and used as a reference configuration for an end to space construction analyses. The preferred construction methods and processes, the important interactions between the platform design and the construction system design and operation, and the technology development efforts required to support the design and space construction of the ETVP are outlined.

Hart, R. J.

Geosynchronous platform definition study. Volume 6: Geosynchronous program evaluation and recommendations

The programmatic analyses conducted to achieve the objectives of the study are presented. The characteristics are examined of alternate geosynchronous programs based on servicing concepts, geosynchronous platform configurations, and equipment definitions which have evolved during the study. The logistics support necessary to carry out programs using these systems is defined considering alternate approaches for on-orbit servicing. The costs of the resultant programs are then determined and the alternate program approaches compared. Conventional programs with expendable satellites are also defined to the extent necessary to permit comparison with on-orbit serviced platform programs.

Myers, H. L.

Geosynchronous platform definition study. Volume 7: Geosynchronous transporation requirements

The analyses and trade studies are presented which were conducted to define the interfaces between geosynchronous platforms and the space transportation system. Mission timelines are synthesized for both manned and unmanned placement and servicing operations. Physical, operational, and functional interfaces between platforms and the space shuttle and tug are derived from the timelines. Where interface incompatibilities exist, alternate approaches are evaluated and a preferred approach is defined. An evaluation of the adaptation of the solar electric propulsion (SEP) stage for geosynchronous operations is presented. A comparison of geosynchronous platform programs with and without the SEP stage in the transportation system is developed.

Myers, H. L.