Jacobs recently completed site preparation work supporting the private commercial development of a world-scale petrochemical complex (an 'ethylene cracker' to produce the primary building block for many forms of plastic) in Monaca, Pennsylvania - the first major U.S. project of its kind outside the Gulf Coast region in 20 years and one of the largest (multi-billion dollar) construction projects in the eastern U.S. Prior to beginning construction on the petrochemical complex, the site's previous large, industrial zinc smelter operations had to be decommissioned and the facilities had to be removed. During the previous 80 years, the smelting operations at the site were used to produce zinc, lead, mercury, and sulfuric acid (a by-product of smelting). The smelting operations left landfills and industrial soil over a large area that had to be removed or closed under regulatory review to allow development across the 81,000 m{sup 2} (200-acre) industrial site located near a major river and local populations. In order to meet Pennsylvania's site-specific Land Recycling Program (commonly referred to as 'Act 2') legislative requirements, the direct contact pathway for landfill soil and slag was removed or mitigated. The site preparation work, or 'Early Works', started in January 2015. As the selected Early Works overall Engineering, Procurement, and Construction Management (EPCM) contractor, Jacobs performed the front end engineering and design. Subsequently, Jacobs had overall responsibility for procurement, construction management, health and safety, quality, security, and environmental services for the entire site and all contractors. The Early Works project included eight separate work scope packages: 1) Site Preparation, 2) Site Development, 3) Marine Works, 4) Rail Works, 5) Road Works and Offsite Utilities, 6) Site Security, 7) Construction Facilities, and 8) High Voltage Line Relocation. The Early Works scope was successfully completed in 2017. The challenges faced by this privately funded commercial project have much in common with large DOE and government construction projects. This paper explores lessons learned from the project and compares how project challenges were addressed on this private commercial project with those anticipated at large DOE/government construction and remediation sites, particularly those in the areas of Safety, Logistics, Infrastructure, and Stakeholder Involvement. The identification of best practices demonstrated on this successful project are shared for the purpose of bringing outside, commercial perspectives to ongoing or planned DOE/government construction projects. (authors)
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗