Engineering PapersSearch

Engineering topics

Mudgway, D. J.

Publications and source records attributed to Mudgway, D. J..

Galileo early cruise, including Venus, first Earth, and Gaspra encounters

This article documents Deep Space Network (DSN) support for the Galileo cruise to Jupiter. The unique trajectory affords multiple encounters during this cruise phase. Each encounter had or will have unique requirements for data acquisition and DSN support configurations. An overview of the cruise and encounters through the asteroid Gaspra encounter is provided.

Beyer, P. E.

Ka-band study: 1988

The Ka-band study team was chartered in late 1987 to bring together all the planning elements for establishing 32 GHz (Ka-band) as the primary downlink frequency for deep-space operation, and to provide a stable baseline from which to pursue that development. This article summarizes the results of that study at its conclusion in mid-1988, and corresponds to material presented to NASA's Office of Space Operations on July 14, 1988. For a variety of reasons, Ka-band is the right next major step in deep-space communications. It offers improved radio metric accuracy through reduced plasma sensitivity and increased bandwidth. Because of these improvements, it offers the opportunity to reduce costs in the flight radio system or in the DSN by allocating part of the overall benefits of Ka-band to this cost reduction. A mission scenario is being planned that can drive at least two and possibly all three of the DSN subnets to provide a Ka-band downlink capability by the turn of the century. The implementation scenario devised by the study team is believed to be feasible within reasonable resource expectations, and capable of providing the needed upgrade as a natural follow-on to the technology development which is already underway.

Layland, J. W.

Telecommunications and data acquisition systems support for the Viking 1975 mission to Mars

The background for the Viking Lander Monitor Mission (VLMM) is given, and the technical and operational aspects of the tracking and data acquisition support that the Network was called upon to provide are described. An overview of the science results obtained from the imaging, meteorological, and radio science data is also given. The intensive efforts that were made to recover the mission are described.

Mudgway, D. J.

The 1986 launch of the Galileo spacecraft via the Space Transportation System

Beginning with the Galileo spacecraft launch, deep space payloads will be launched via the Space Shuttle. This change from the previous use of expendable launch vehicles will introduce large changes in procedures and data flow configurations for both the flight project and the Deep Space Network during the launch period. The planned Galileo launch period sequence of events and telemetry and command data flow configurations are described.

Berman, A. L.

Tracking and data system support for the Viking 1975 mission to Mars: Extended mission operations, December 1976 to May 1978, volume 4

The support which was provided by the Deep Space Network to the Viking Extended Mission from December 1976 to May 1978 is described. Tracking and data acquisition support required the continuous operation of a world-wide network of tracking stations with 64-meter and 26-meter diameter antennas, together with a global communications system for the transfer of commands, telemetry, and radio metric data between the stations and the Network Operations Control Center in Pasadena, California. Performance of the deep-space communications links between Earth and Mars, and innovative new management techniques for operations and data handling are included.

Mudgway, D. J.

Tracking and data system support for the Viking 1975 mission to Mars. Volume 3: Planetary operations

The support provided by the Deep Space Network to the 1975 Viking Mission from the first landing on Mars July 1976 to the end of the Prime Mission on November 15, 1976 is described and evaluated. Tracking and data acquisition support required the continuous operation of a worldwide network of tracking stations with 64-meter and 26-meter diameter antennas, together with a global communications system for the transfer of commands, telemetry, and radio metric data between the stations and the Network Operations Control Center in Pasadena, California. Performance of the deep-space communications links between Earth and Mars, and innovative new management techniques for operations and data handling are included.

Mudgway, D. J.

Tracking and data system support for the Viking 1975 mission to Mars. Volume 2: Launch through landing of Viking 1

Problems inherent in the deployment and management of a worldwide tracking and data acquisition network to support the two Viking Orbiters and two Viking Landers simultaneously over 320 million kilometers (200 million miles) of deep space are discussed. Activities described include tracking coverage of the launch phase, the deep space operations during the long cruise phase that occupied approximately 11 months, and the implementation of the a vast worldwide network of tracking sttions and global communications systems. The performance of the personnel, hardware, and software involved in this vast undertaking are evaluated.

Mudgway, D. J.

Tracking and data system support for the Viking 1975 mission to Mars. Volume 1: Prelaunch planning, implementation, and testing

The tracking and data acquisition support for the 1975 Viking Missions to Mars is described. The history of the effort from its inception in late 1968 through the launches of Vikings 1 and 2 from Cape Kennedy in August and September 1975 is given. The Viking mission requirements for tracking and data acquisition support in both the near earth and deep space phases involved multiple radar tracking and telemetry stations, and communications networks together with the global network of tracking stations, communications, and control center. The planning, implementation, testing and management of the program are presented.

Mudgway, D. J.

Viking mission support

The final operations tests prior to Mars orbit insertion for Viking 1 are discussed together with the real-time operations support for the two months preceding this event. Several special operational strategies and procedures designed to optimize the DSN support during the critical planetary phases of the mission are described. The final phases of Network implementation for Viking and the support afforded to the radio science experiments and Mars radar observations are also included.

Mudgway, D. J.

Viking mission support

On April 26, 1976, the network operations control center was declared available for planetary operations in support of the Viking project. This final capability in the network configuration for Viking had been delayed since February with hardware and software problems both in the control center and at the Deep Space stations. The effect of these problems, particularly insofar as they affected production of intermediate data records, the resolution of the problems, and the current status of the network operations control center in the Viking environment, are given in this article. Also discussed are the operational verification tests performed to check out the new capabilities and associated procedures. The Viking project tests supported by the DSN and finally the DSN support of Viking cruise operations, along with some statistics on performance, are included.

Mudgway, D. J.