Final Mission and Navigation Design for the 2016 Mars InSight Mission

NASA’s Interior Exploration using Seismic Investigations, Geodesy, and Heat Transport (InSight) mission was scheduled to launch the next lander to Mars in March 2016 arriving to the Red Planet in the fall. Derived from the Phoenix mission which successfully landed on Mars in May 2008, the InSight Entry, Descent, and Landing system will place a lander in the Elysium Planitia region. This paper specifies the mission and navigation requirements set by the Project and how the final mission and navigation design satisfies those requirements. Background information affecting navigation including spacecraft modeling and the physical environment which influences the spacecraft motion are included. (Note from the author: The InSight launch in 2016 was suspended due to critical issues with the Seismic Experiment for Interior Structure (SEIS) instrument that could not be fixed prior to the planned launch period. This paper represents the state of the design for the 2016 mission. No attempt has been made to reflect the latest developments).

Abilleira, Fernando

A Journey with MOM

In late 2013, the Indian Space Research Organization (ISRO) launched its "Mars Orbiter Mission" (MOM). ISRO engaged NASA's Jet Propulsion Laboratory (JPL) for navigation services to support ISRO's objectives of MOM achieving and maintaining Mars orbit. The navigation support included planning, documentation, testing, orbit determination, maneuver design /analysis, and tracking data analysis. Several of MOM's attributes had an impact on navigation processes, e.g., S -band telecommunications, Earth Orbit Phase maneuvers, and frequent angular momentum desaturation s (AMDs). The primary source of tracking data was NASA/ JPL's Deep Space Network (DSN); JPL also conducted a performance assessment of Indian Deep Space Network (IDSN) tracking data. Planning for the Mars Orbit Insertion (MOI) was complicated by a pressure regulator failure that created uncertainty regarding MOM's main engine and raised potential planetary protection issues. A successful main engine test late on approach resolved these issues; it was quickly followed by a successful MOI on 24-September - 2014 at 02:00 UTC. Less than a month later, Comet Siding Spring's Mars flyby necessitated plans to minimize potential spacecraft damage. At the time of this writing, MOM's orbital operations continue, and plans to extend JPL 's support are in progress. This paper covers the JPL 's support of MOM through the Comet Siding Spring event.

Mars orbiter

Mars Science Laboratory Orbit Determination

Mars Science Laboratory (MSL) Orbit Determination (OD) met all requirements with considerable margin, MSL OD team developed spin signature removal tool and successfully used the tool during cruise, A novel approach was used for the MSL solar radiation pressure model and resulted in a very accurate model during the approach phase, The change in velocity for Attitude Control System (ACS) turns was successfully calibrated and with appropriate scale factor resulted in improved change in velocity prediction for future turns, All Trajectory Correction Maneuvers were successfully reconstructed and execution errors were well below the assumed pre-fight execution errors, The official OD solutions were statistically consistent throughout cruise and for OD solutions with different arc lengths as well, Only EPU-1 was sent to MSL. All other Entry Parameter Updates were waived, EPU-1 solution was only 200 m separated from final trajectory reconstruction in the B-plane

Mars Science Laboratory (MSL)

Mars Reconnaissance Orbiter Navigation During the Primary Science Phase

The Mars Reconnaissance Orbiter began science operations in November 2006, with a suite of seven instruments and investigations, some of which required navigation accuracies much better than previous Mars missions. This paper describes the driving performance requirements levied on Navigation and how well those requirements have been met thus far. Trending analyses that have a direct impact on the Navigation performance, such as atmospheric bias determination, are covered in detail, as well as dynamic models, estimation strategy, tracking data reduction techniques, and residual noise.

MRO

Mars Reconnaissance Orbiter Interplanetary Cruise Navigation

Carrying six science instruments and three engineering payloads, the Mars Reconnaissance Orbiter (MRO) is the first mission in a low Mars orbit to characterize the surface, subsurface, and atmospheric properties with unprecedented detail. After a seven-month interplanetary cruise, MRO arrived at Mars executing a 1.0 km/s Mars Orbit Insertion (MOI) maneuver. MRO achieved a 430 km periapsis altitude with the final orbit solution indicating that only 10 km was attributable to navigation prediction error. With the last interplanetary maneuver performed four months before MOI, this was a significant accomplishment. This paper describes the navigation analyses and results during the 210-day interplanetary cruise. As of August 2007 MRO has returned more than 18 Terabits of scientific data in support of the objectives set by the Mars Exploration Program (MEP). The robust and exceptional interplanetary navigation performance paved the way for a successful MRO mission.

You, Tung-Han

Navigation of the space VLBI mission-HALCA

In February 1997, the Japanese Space Agency ISAS launched the first space VLBI satellite, HALCA, with an 8 meter diameter wire mesh antenna and radio astronomy receivers capable of observing at 1.6, 4.8, and 22 Ghz. In a 560 by 21000 km orbit with a 6 hour period and 31 degree inclination, it observes celestial radio sources in conjunction with a world wide network of ground radio telescopes as part of an international collaborative effort which includes facilities in Japan, the U.S., Canada, Australia, and Europe. JPL is providing tracking and navigation support using a dedicated subnet of 11 meter antennas as well as co-observations using the DSN 70 meter antennas. This paper describes the spacecraft dynamics model and orbit determination strategies developed to meet the stringent trajectory accuracy requirements for generating predictions for the transfer of a stable uplink frequency to the spacecraft and for determining reconstructed orbits for delivery to the NRAO VLBI correlator and the international VLBI science community.

You, Tung Han

Giotto interplanetary orbit determination

Development, testing, and application of the Giotto orbit determination software are described. The final targetting for a close flyby of comet Halley is described.

Morley, Trevor A.