Engineering Papers⌕ Search

Engineering topics

Morash, Sean

Publications and source records attributed to Morash, Sean.

Grid Planning for Building Electrification: A Report by the Energy Systems Integration Group’s Grid Planning for Building Electrification Task Force

The increased electrification of buildings across the United States is being driven by technical advancements, cost reductions for some building technologies, consumer preferences, and policy goals for decarbonization. However, the effects of this load growth on the electric distribution system are often only a minor consideration in policymaking and long-term planning studies. The long lead time and useful life of power system equipment means that the decisions taken today are expected to support our society well into the 2060s and beyond. Distribution planning stakeholders can take steps today to establish a grid foundation that captures the new challenges presented by building electrification. This report focuses on building electrification for the residential and commercial sectors, focusing most heavily on space heating, as this end use stands to most strongly impact demand.1 Across all end uses, building electrification could require somewhere between 10% and 70% more electricity generation capacity than exists today depending on technology adoption and energy efficiency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid Enhancing Technologies in ISO-NE

Assess Grid Enhancing Technologies in transmission planning by coupling economic and reliability analysis over an entire time horizon rather than a few dispatch conditions for ISO-NE.

24 POWER TRANSMISSION AND DISTRIBUTION↗

DLR Calculation Engine Interoperability Profile: A Project for the TOGETs Task Force

This document contains a detailed interoperability profile outlining how the components of the CIM can be used to implement DLR in support of the two use cases identified in the Use Case Document. An interoperability profile is defined by the Smart Electric Power Alliance (SEPA) as a document that “specifies standards-based requirements for interfaces or applications that are accepted by the user-community, testing authorities, and other stakeholders. It specifies configuration options within a standard’s requirements sufficient to deliver the desired level of interoperability and functionality.” To that end, this document is not in itself a standard, nor has it been approved by any formal body. Rather, it is an example of how to implement the CIM standard and has been reviewed by industry, including transmission operators and DLR vendors.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid Enhancing Technologies Modeling Methodology: Telos Approach

Grid Enhancing Technologies Modeling Methodology Introduction -Grid Enhancing Technology -PLEXOS and TARA Modeling Methodology Overview -PLEXOS/TARA agreement -Flowgate identification -DLR and PFC Location Identification Key Lessons Learned and Possible Improvements

24 POWER TRANSMISSION AND DISTRIBUTION↗

Real Time and Forecasted DLR: Use Cases

This document contains two use cases for the utilization of dynamic line ratings in operational practices. These use cases were developed in support of the Transmission Optimization and Grid Enhancing Technology (TOGETS) task force aimed at facilitating the deployment of dynamic line rating and power flow technologies across the United States. The project included a demonstration of the technology on the Idaho National Laboratory system. The procurement documents, tests scripts, and field-validated results from multiple vendors will be published to improve industry’s familiarity with the products. Because of the urgency in performing this work and INL’s unique test setup, the Task Force identified a need for additional public information on the information exchanges required for operationalizing DLR (i.e. integrating DLR’s within actual system operations). As such, this use case document and an accompanying interoperability profile have been developed with input from the Task Force and various vendors whose systems would ultimately support the functionality described. The use case and interoperability profile support two distinct functionalities with different purposes.

24 POWER TRANSMISSION AND DISTRIBUTION↗