Engineering Papers⌕ Search

Engineering topics

Moe, Wayne L.

Publications and source records attributed to Moe, Wayne L..

At least 19 records

Determining the Appropriate Emergency Planning Attributes for Microreactors

Micro-reactor designs incorporate design features that provide very low reactor decay heat power at 24 hours after shutdown that is manageable in comparison with larger reactors. This attribute translates into a low probability of core damage negligible offsite dose. This paper provides the conceptual framework for appropriately structuring emergency planning requirements for micro-reactors while ensuring the U.S. Nuclear Regulatory Commission’s (NRC) commitment to safety is met. Due to the diversity in reactor designs comprising the micro-reactor community, this paper identifies the necessary concepts that should be considered to ensure emergency plans for micro-reactors are appropriate for the risk. This paper does not mandate specific design features for micro-reactors but provides reactor designers a conceptual framework for a scalable, graded approach to Emergency Planning Standards that should be considered in their individual designs in order to support simplified emergency plans. Given that accident source terms associated with micro-reactors are essentially negligible when compared with those for large light water reactors, revisions to emergency planning standards are justified. A graded approach to implementing emergency planning guidance can be used to appropriately structure micro-reactor emergency plans and reduce the size of the emergency planning zone and plume exposure pathway. Appropriately structuring emergency planning requirements will better optimize licensee and offsite agencies emergency planning resources and reduce the resources associated with emergency planning.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Risk-Informed and Performance-Based Evaluation of Defense-in-Depth Adequacy

This document supports the work contained in Nuclear Energy Institute (NEI) 18-04 “Risk-Informed Performance-Based Technology Inclusive Guidance for Advanced Reactor Licensing Basis Development” Revision 0. NEI 18-04 presents a modern, technology-inclusive, risk-informed, and performance-based (TI-RIPB) process for selection of Licensing Basis Events (LBEs); safety classification of structures, systems, and components (SSCs) and associated risk-informed special treatments; and determination of defense-in-depth (DID) adequacy for non-LWRs. The NEI guidance document provides one acceptable means for addressing the aforementioned topics as part of demonstrating a specific design provides reasonable assurance of adequate radiological protection. This report provides the framework and associated methodology guidelines and discussion for establishing, then evaluating, confirming, and documenting the adequacy of defense-in-depth (DID) for advanced non-light-water reactor technologies. It was developed as part of the Licensing Modernization Project led by Southern Company and cost-shared by the United States Department of Energy and has benefited from considerable NRC formal reviews and public workshops. The methodology converts the DID philosophy into a structured process that is implementable, embraces existing United States and international definitions and philosophies of DID that set the foundation for the process. It builds on the DID framework developed in the Department of Energy Next Generation Nuclear Plant Project and earlier works on this subject. The approach to establishing DID adequacy involves the incorporation of DID attributes into the plant capabilities and programmatic elements of DID. The integrated evaluation of DID adequacy includes both quantitative elements to incorporate risk-informed and performance-based (RIPB) considerations and qualitative elements that address uncertainties and limitations in the quantitative models and supporting data. Demonstration of DID adequacy ensures that there are multiple layers of defense for risk-significant challenges to the design and that the plant capabilities and programs that support each layer are provided in a manner that minimizes dependencies among these layers. The focus of this report is assurance of DID adequacy with respect to protection of the public from radiological exposures resulting from accidental releases of radioactive material. While other hazards are not specifically addressed, this methodology is expected to be beneficial for determining DID adequacy for them as well. Risk-informed evaluation of DID considers the integrated performance of all plant SSCs and associated programs to manage daily operational activities, transients, and accidents, including the evaluation of strategies for accident prevention and mitigation. The RIPB LBE scenario methodology used in this evaluation defines the challenges to the plant safety features included in the plant design basis and beyond, and the scope of all deterministic and probabilistic safety evaluations. By examining event sequences across the whole spectrum of LBEs, a systematic assessment of DID can be accomplished.

42 ENGINEERING↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: LMP Lessons Learned, Best Practices, and Frequently Asked Questions

This report captures lessons learned, best practices, and frequently asked questions with responses gleaned from the experiences of early adopters of the LMP RIPB process. Interviews were conducted in late 2019 with five non-LWR design organizations to gather their feedback on the application of the LMP RIPB process under real production conditions. The overall feedback from the reactor developers is that the LMP RIPB process can be successfully implemented with material benefits to the designer. As with any new processes, numerous challenges and questions were relayed by the designers. These challenges have been translated into lessons learned and best practices. Those two sections address both technical and organizational aspects of implementing the LMP RIPB process. Questions that were asked by multiple designers were turned into “frequently asked questions” and responses were provided by the LMP team.

42 ENGINEERING↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Safety Classification and Performance Criteria for Structures, Systems, and Components

This report, “Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Safety Classification and Performance Criteria for Structures, Systems and Components,” represents a key element in the development of a framework for the efficient licensing of advanced non-Light Water Reactors (non-LWRs). It is the result of a Licensing Modernization Project (LMP) led by Southern Company and cost-shared by the United States Department of Energy (DOE).

42 ENGINEERING↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors (Final Project Report)

Advanced (i.e., non-light-water) reactor technologies offer developers new opportunities to enhance the reliability, efficiency, and safety of nuclear power reactors through changes in fundamental design and operation. A variety of advanced design concepts are being developed that generally trend toward increased reliance on innovative, inherent, and passive safety features. Many of these features are substantially different from components now found in large light water reactors (LWRs) that dominate the commercial operating fleet. Similarly, non-light water reactor (non-LWR) suppliers are also pursuing market niches quite different from the regional baseload power generation sites typically associated with large LWR facilities.

42 ENGINEERING↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Selection and Evaluation of Licensing Basis Events

This report, “Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Selection and Evaluation of Licensing Basis Events,” represents a key element in the development of a methodology for the efficient licensing of advanced non-light water reactors (non-LWRs). It is the result of a Licensing Modernization Project (LMP) led by Southern Company and cost-shared by the U.S. Department of Energy (DOE). The LMP will result in detailed proposals for establishing licensing technical requirements to facilitate risk-informed and performance-based design and licensing of advanced non-LWRs. Such a methodology acknowledges enhancements in safety achievable with advanced designs and reflects more recent states of knowledge regarding safety and design innovation, creating an opportunity for reduced regulatory complexity with increased levels of safety. The project builds on best practices as well as previous activities through DOE and industry-sponsored advanced reactor licensing initiatives.

42 ENGINEERING↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Probabilistic Risk Assessment Approach

This report, “Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Probabilistic Risk Assessment Approach,” represents a key element in the development of a methodology for the efficient licensing of advanced non-light water reactors (non-LWRs). It is the result of a Licensing Modernization Project (LMP) led by Southern Company and cost-shared by the U.S. Department of Energy (DOE). The LMP has developed detailed proposals for establishing licensing technical requirements to facilitate risk-informed and performance-based design and licensing of advanced non-LWRs. Such a methodology acknowledges enhancements in safety achievable with advanced designs and reflects more recent states of knowledge regarding safety and design innovation, creating an opportunity for reduced regulatory complexity with increased levels of safety. The project builds on best practices, as well as previous activities through DOE and industry-sponsored advanced reactor licensing initiatives.

42 ENGINEERING↗

Key Regulatory Issues in Nuclear Micro-Reactor Transport and Siting

Inherent and passively safe nuclear micro reactors are being developed that feature mobility and autonomous operations much different than the current fleet. Numerous commercial, industrial, and military applications exist for this emerging technology. Challenges in licensing such flexible systems are foreseen, especially in areas related to siting and transport. New assessment approaches will be needed if micro reactors are to realize their full commercial potential while still preserving public safety. This report offers an initial examination of some key regulatory concerns related to micro reactor transport and siting in the continental U.S. Three deployment scenarios were developed to support a regulatory needs analysis concerning the appropriate regulatory structure for the technology, treatment of fueled and unfueled micro reactor modules during transport, and the means by which siting independence can be enhanced. With the exception of certain ultra mobile Department of Defense (DOD) applications, existing statutes suggest the Nuclear Regulatory Commission (NRC) is the appropriate regulatory agency to regulate a domestic commercial micro reactor fleet.

42 ENGINEERING↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Selection and Evaluation of Licensing Basis Events

This report, “Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Selection and Evaluation of Licensing Basis Events,” represents a key element in the development of a methodology for the efficient licensing of advanced non-light water reactors (non-LWRs).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Risk-Informed and Performance-Based Evaluation of Defense-in-Depth Adequacy

This document supports the work contained in Nuclear Energy Institute (NEI) 18-04 “Risk-Informed Performance-Based Technology Inclusive Guidance for Advanced Reactor Licensing Basis Development” Revision 0.[19] NEI 18-04 presents a modern, technology-inclusive, risk-informed, and performance-based (TI-RIPB) process for selection of Licensing Basis Events (LBEs); safety classification of structures, systems, and components (SSCs) and associated risk-informed special treatments; and determination of defense-in-depth (DID) adequacy for non-LWRs.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Safety Classification and Performance Criteria for Structures, Systems, and Components

This report, “Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: Safety Classification and Performance Criteria for Structures, Systems and Components,” represents a key element in the development of a framework for the efficient licensing of advanced non-Light Water Reactors (non-LWRs).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Licensing Modernization Project for Advanced Reactor Technologies: FY 2018 Project Status Report

The promise of new nuclear technology and the future of commercial power in the United States (U.S.) are linked to the existence of an efficient and safety-focused regulatory review and licensing process. With an appropriate regulatory framework, reactor suppliers and regulators can design, license, build, and export advanced reactor units more effectively and efficiently and thereby help meet the growing need for clean and reliable energy. To help address the challenge of maintaining compatibility between the regulatory environment and new commercial nuclear plant designs, the U.S. Department of Energy (DOE) is supporting an industry-led effort called the Licensing Modernization Project (LMP). This cost-shared initiative, started in 2016 and scheduled to continue through mid-2019, targets amendment to key elements of the U.S. nuclear power reactor regulatory framework to specifically address licensing barriers in advanced-reactor concepts. The project is focused on updating guidance for certain technical licensing requirements that are largely incompatible with non-light-water reactors (non-LWR) and establish a new pathway for design-safety evaluations and license-application development. Upon completion, the project will have created a new pathway, founded on modern probabilistic assessment techniques, that offers developers, suppliers, regulators, and owner/operatorowner-operators greater clarity and assurance in design and licensing decisions. The LMP employs a team of advanced reactor technology and licensing subject matter experts working closely with U.S. regulators, affected industries, and interested members of the public. The project is managed by Southern Company and supported through a cost share arrangement with DOE. Technical contributions are also provided to the project from the Idaho National Laboratory (INL) Regulatory Development area, the Nuclear Energy Institute (NEI), and the U.S. Nuclear Regulatory Commission (NRC). The LMP identified a suite of high priority issues that provided significant uncertainty within the regulated non-LWR community. It was determined that much of this uncertainty could be retired by issuing updated licensing guidance founded on safety performance demonstrations and modern probabilistic methodologies. The success criteria for the project were established as: • Generate sets of technology inclusive (TI), risk-informed, and performance-based (TI-RIPB) technical requirements, recommendations, and proposals that could be reviewed, amended, and adopted for use by both NRC staff and industry. The proposals would create an optional-use regulatory framework without imposing additional (i.e., mandatory) requirements. • Support LMP the recommended updates of LMP such that they can be finalized, endorsed by NRC, and used by applicants within 5 years. This also supports the DOE advanced- reactor development and deployment goal of completing licensing reviews for technically mature non-LWR concepts sufficient to allow construction to proceed by the early 2030’s. • Further overall programmatic objectives established by DOE’s Gateway for Accelerated Innovation in Nuclear (GAIN) initiative by resolving technology-inclusive policy issues that adversely impact regulatory reviews, siting, permitting, and/or licensing of non-LWRs. This would provide significantly more regulatory certainty for advanced reactor developers.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Advanced Reactor Technologies - Regulatory Technology Development Plan (RTDP)

This DOE-NE Advanced Small Modular Reactor (AdvSMR) regulatory technology development plan (RTDP) will link critical DOE nuclear reactor technology development programs to important regulatory and policy-related issues likely to impact a “critical path” for establishing a viable commercial AdvSMR presence in the domestic energy market. Accordingly, the regulatory considerations that are set forth in the AdvSMR RTDP will not be limited to any one particular type or subset of advanced reactor technology(s) but rather broadly consider potential regulatory approaches and the licensing implications that accompany all DOE-sponsored research and technology development activity that deal with commercial non-light water reactors. However, it is also important to remember that certain “minimum” levels of design and safety approach knowledge concerning these technology(s) must be defined and available to an extent that supports appropriate pre-licensing regulatory analysis within the RTDP. Final resolution to advanced reactor licensing issues is most often predicated on the detailed design information and specific safety approach as documented in a facility license application and submitted for licensing review. Because the AdvSMR RTDP is focused on identifying and assessing the potential regulatory implications of DOE-sponsored reactor technology research very early in the pre-license application development phase, the information necessary to support a comprehensive regulatory analysis of a new reactor technology, and the resolution of resulting issues, will generally not be available. As such, the regulatory considerations documented in the RTDP should be considered an initial “first step” in the licensing process which will continue until a license is issued to build and operate the said nuclear facility. Because a facility license application relies heavily on the data and information generated by technology development studies, the anticipated regulatory importance of key DOE reactor research initiatives should be assessed early in the technology development process. Quality assurance requirements supportive of later licensing activities must also be attached to important research activities to ensure resulting data is usable in that context. Early regulatory analysis and licensing approach planning thus provides a significant benefit to the formulation of research plans and also enables the planning and development of a compatible AdvSMR licensing framework, should significant modification be required.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Regulatory Risk Reduction for Advanced Reactor Technologies: FY 2017 Framework Modernization Proposals and Status

The regulatory framework governing the licensing of commercial nuclear power plants in the U.S. developed over recent decades with a strong emphasis towards assessing large light water reactor (LWR) safety. However, recent shifts in energy market needs and priorities has brought new and different types of nuclear technologies into consideration for applications that include but are not limited to electric power generation. In order to realize the benefits in efficiency, reliability and safety that advanced (non-LWR) can potentially offer, efforts are needed to modernize the existing regulatory framework to make technical licensing requirements more compatible with radically new nuclear technologies. To serve the needs of the energy market, this update should be performed on a schedule conducive to deployments projected to begin as early as 2025. Beginning in 2016, an initiative was launched to amend the U.S. nuclear power reactor licensing framework by making the technical requirements contained therein more generically compatible with non LWR technology. The Licensing Modernization Project (LMP) was established as an industry-led team of subject matter experts managed by Southern Company Services and supported through a cost sharing arrangement with the U.S. Department of Energy (DOE). Technical and programmatic coordination for the effort was also provided by the Nuclear Energy Institute (NEI), the Licensing Department of the Advanced Reactor Technologies (ART) Program located at the Idaho National Laboratory (INL), and others.

42 ENGINEERING↗

Licensing basis event selection framework for advanced reactors - 18818

This paper describes key aspects of the risk-informed, performance-based licensing methodology as developed by the Department of Energy (DOE) for the Next Generation Nuclear Plant (NGNP) project. The discussion focuses on an event selection process using modular high temperature gas-cooled reactor (HTGR) design attributes and identifies how top-level regulatory criteria can be placed on a frequency-consequence (F-C) curve. Nuclear Regulatory Commission (NRC) staff evaluations of the proposed approach are included. In addition, important lessons learned during the NGNP prelicensing effort and their potential applications to alternative advanced reactor designs are presented. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Cost saving opportunities in emergency planning at nuclear power plants - 18819

This paper identifies generalized offsite emergency planning costs for 2014 covering twenty different commercial nuclear plant locations in the U.S. This information was analyzed to quantify the potential cost savings associated with reduction in offsite emergency planning zone size as a function of sixteen offsite emergency planning standards contained in 10 CFR 50.47(b). Mean annual operating and maintenance costs and startup costs for a typical offsite nuclear power plant emergency planning program were $2.25 M and $10 M, respectively. However, if a reactor design technical basis were developed that allowed for a reduction in offsite plume emergency planning zone (EPZ) size from the nominal 10 mile standard currently used, collocation of that EPZ with the site plant boundary could produce programmatic savings in excess of 90% over a typical 40 year plant life. Lesser, but still potentially significant savings, are possible if the plume EPZ were resized to five and two miles. Negligible potential cost savings were identified with reductions in the ingestion pathway EPZ size which has been typically set at 50 miles. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Opportunities in SMR Emergency Planning

Using year 2014 cost information gathered from twenty different locations within the current commercial nuclear power station fleet, an assessment was performed concerning compliance costs associated with the offsite emergency Planning Standards contained in 10 CFR 50.47(b). The study was conducted to quantitatively determine the potential cost benefits realized if an emergency planning zone (EPZ) were reduced in size according to the lowered risks expected to accompany small modular reactors (SMR). Licensees are required to provide a technical basis when proposing to reduce the surrounding EPZ size to less than the 10 mile plume exposure and 50 mile ingestion pathway distances currently being used. To assist licensees in assessing the savings that might be associated with such an action, this study established offsite emergency planning costs in connection with four discrete EPZ boundary distances, i.e., site boundary, 2 miles, 5 miles and 10 miles. The boundary selected by the licensee would be based on where EPA Protective Action Guidelines are no longer likely to be exceeded. Additional consideration was directed towards costs associated with reducing the 50 mile ingestion pathway EPZ. The assessment methodology consisted of gathering actual capital costs and annual operating and maintenance costs for offsite emergency planning programs at the surveyed sites, partitioning them according to key predictive factors, and allocating those portions to individual emergency Planning Standards as a function of EPZ size. Two techniques, an offsite population-based approach and an area-based approach, were then employed to calculate the scaling factors which enabled cost projections as a function of EPZ size. Site-specific factors that influenced source data costs, such as the effects of supplemental funding to external state and local agencies for offsite response organization activities, were incorporated into the analysis to the extent those factors could be representatively apportioned.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗