Learning model combining convolutional deep neural network with a self-attention mechanism for AC optimal power flow

Alternating current optimal power flow (OPF) analysis is critical for efficient and reliable operation of power systems. For large systems or repetitive computations, the traditional methods such as the direct and gradient methods, or non-traditional methods, such as the genetic algorithm and simulating annealing, are time-consuming and unsuitable for real-time computing. The work in this paper proposes a novel framework to obtain the optimal solution of power flow in real-time using a combination of convolutional neural networks and a self-attention mechanism. All parameters of the power networks are rearranged in an image-like shape of a multi-channel image where each channel is a two-dimensional matrix. The proposed approach is adaptive with every input size of power systems as well as frequent variations of network topologies without intervention to the framework core. The encompassment of all power system contexts in which all parameters of internal elements, generation costs, and topology information are included, contributes to the higher accuracy of inference compared to other current machine-learning-based OPF-solving methods. Besides, the proposed framework established on ubiquitous platforms is effortlessly integrated into current infrastructures of power systems, and the great efficiency along with the computation speed may serve as a critical point for practical implications, such as enabling faster decision-making during real-time operations, predicting system contingencies, and remedial actions based on an offline pre-trained model. Furthermore, this supervised learning process is applied to the dataset of four case studies of meshed power systems: the IEEE 5-bus system (IEEE-5), the IEEE 30-bus system (IEEE-30), the IEEE 39-bus system (IEEE-39), and the IEEE 57-bus system (IEEE-57) to prove the efficacy of the proposed method.

42 ENGINEERING↗

Probabilistic Sizing of Energy Storage Systems for Reliability and Frequency Security in Wind-Rich Power Grids

The penetration of wind energy has increased significantly in the power grid in recent times. Although wind is abundant, environment-friendly, and cheap, it is variable in nature and does not contribute to system inertia as much as conventional synchronous generators. Coupled with the low inertia contribution, the generation intermittency of wind power leads to reliability and stability issues in the power system. Energy storage systems (ESSs) are among the most prominent alternatives to alleviate these concerns associated with high wind penetration. This paper proposes a planning strategy to size ESS for the reliability and frequency security of wind-rich power grids. A probabilistic methodology for ESS sizing is developed utilizing a composite reliability-based framework with sequential Monte Carlo simulation (MCS). The MCS generates composite reliability indices for the power system, which are employed to obtain the capacity for a reliability energy storage system (RESS). Simultaneously, the MCS-derived probability of synchronization of conventional generators is integrated into an analytical approach for sizing a frequency support energy storage system (FESS). The effect of wind farm dispersion across geographical regions is incorporated in the framework to study possible reductions in the ESS size while maintaining the system reliability and frequency security. Furthermore, the efficacy of the proposed strategy is demonstrated on the RTS-GMLC test system.

25 ENERGY STORAGE↗

Quantification of storage required for preserving frequency security in wind‐integrated systems

Abstract The penetration of wind power generation into the power grid has been accelerated in recent times due to the aggressive emission targets set by governments and other regulatory authorities. Although wind power has the advantage of being environment‐friendly, wind as a resource is intermittent in nature. In addition, wind power contributes little inertia to the system as most wind turbines are connected to the grid via power electronic converters. These negative aspects of wind power pose serious challenges to the frequency security of power systems as penetration increases. In this work, an approach is proposed where an energy storage system (ESS) is used to mitigate frequency security issues of wind‐integrated systems. ESSs are well equipped to supply virtual inertia to the grid due to their fast‐acting nature, thus replenishing some of the energy storage capability of displaced inertial generation. In this work, a probabilistic approach is proposed to estimate the amount of inertia required by a system to ensure frequency security. Reduction in total system inertia due to the displacement of conventional synchronous generation by wind power generation is considered in this approach, while also taking into account the loss of inertia due to forced outages of conventional units. Monte Carlo simulation is employed for implementing the probabilistic estimation of system inertia. An ESS is then sized appropriately, using the system swing equation, to compensate for the lost inertia. The uncertainty associated with wind energy is modeled into the framework using an autoregressive moving average technique. Effects of increasing the system peak load and changing the wind profile on the expected system inertia are studied to illustrate various factors that might affect system frequency security. The proposed method is validated using the IEEE 39‐bus test system.

17 WIND ENERGY↗

Maximising the investment returns of a grid‐connected battery considering degradation cost

Energy storage systems (ESSs) are being deployed widely due to numerous benefits including operational flexibility, high ramping capability, and decreasing costs. This study investigates the economic benefits provided by battery ESSs when they are deployed for market‐related applications, considering the battery degradation cost. A comprehensive investment planning framework is presented, which estimates the maximum revenue that the ESS can generate over its lifetime and provides the necessary tools to investors for aiding the decision making process regarding an ESS project. The applications chosen for this study are energy arbitrage and frequency regulation. Lithium‐ion batteries are considered due to their wide popularity arising from high efficiency, high energy density, and declining costs. A new degradation cost model based on energy throughput and cycle count is developed for Lithium‐ion batteries participating in electricity markets. The lifetime revenue of ESS is calculated considering battery degradation and a cost–benefit analysis is performed to provide investors with an estimate of the net present value, return on investment and payback period. The effect of considering the degradation cost on the estimated revenue is also studied. The proposed approach is demonstrated on the IEEE Reliability Test System and historical data from PJM Interconnection.

25 ENERGY STORAGE↗

A Homotopy-Based Method for Robust Computation of Controlling Unstable Equilibrium Points

This paper proposes a homotopy-based method for efficiently computing and precisely determining controlling unstable equilibrium points (CUEPs) in transient stability analysis and screening using direct methods. The proposed method is intended to overcome potential numerical convergence problems associated with computing CUEPs. These convergence problems are mostly due to irregularities in the region of convergence of CUEPs which make it difficult to determine suitable initial points. The most commonly used initial points in computing CUEPs are minimum gradient points (MGPs) on the stability boundary which in turn rely on the determination of exit points (EPs-points at which sustained-fault trajectories exit system stability boundaries). However, determination of MGPs and EPs are computationally involved and sophisticated numerical methods have been introduced such as stability-boundary-following procedure and shadowing method to correct the solution trajectory. The proposed method does not depend on MGPs and also does not require accurate EPs. The proposed method maps the solution from EPs to the CUEPs. The proposed method is applied on several known systems including the NE 39 bus system and the reduced WECC system and the results are provided. The results are compared with the traditional methods such as Boundary of stability region based CUEP method (BCU method).

42 ENGINEERING↗

Linear optimal power flow system and method

An electric power system or power grid is optimized using a computer-implemented tool the represents in computer memory the optimization function and at least one constraint, which the processor operates upon using a linear programming solver algorithm. The constraints are represented in memory as data structures that include both real and reactive power terms, corresponding to at least one of a power flow model and a transmission line model. The transmission line model is represented using a piecewise linear representation. The power flow model may also include for each node in the power system a real power loss term representing transmission line loss allocated to that node.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Tool employing homotopy-based approaches in finding the controlling unstable equilibrium point in the electric power grid

The analysis tool employs a computer-implemented algorithm that uses homotopy-based approaches to map the solution from the exit point to the controlling unstable equilibrium point (UEP). The computational time is reduced significantly by using an approximate exit point rather than computing an accurate exit point as it is required in finding the controlling UEPs using traditional transient stability direct methods. In addition, this method eliminates the necessity of computing the minimum gradient point (MGP) which is a key element in using Newton methods. These properties provide an advantage to homotopy-based approaches over traditional iterative methods in terms of both speed of computation and reliability of finding solutions.

97 MATHEMATICS AND COMPUTING↗

A Lyapunov Function Based Remedial Action Screening Tool Using Real-Time Data

This report summarizes the outcome of a research project that comprised the development of a Lyapunov function based remedial action screening tool using real-time data (L-RAS). The L-RAS is an advanced computational tool that is intended to assist system operators in making real-time redispatch decisions to preserve power grid stability. The tool relies on screening contingencies using a homotopy method based on Lyapunov functions to avoid, to the extent possible, the use of time domain simulations. This enables transient stability evaluation at real-time speed without the use of massively parallel computational resources. The project combined the following components. 1. Development of a methodology for contingency screening using a homotopy method based on Lyapunov functions and real-time data. 2. Development of a methodology for recommending remedial actions based on the screening results. 3. Development of a visualization and operator interaction interface. 4. Testing of screening tool, validation of control actions, and demonstration of project outcomes on a representative real system simulated on a Real-Time Digital Simulator (RTDS) cluster. The project was led by Michigan State University (MSU), where the theoretical models including homotopy-based screening, trajectory correction using real-time data, and remedial action were developed and implemented in the form of research-grade software. Los Alamos National Laboratory (LANL) contributed to the development of energy margin sensitivity dynamics, which constituted a part of the remedial action portfolio. Florida State University (FSU) and Southern California Edison (SCE) developed a model of the SCE system that was implemented on FSU's RTDS cluster to simulate real-time data that was streamed over the internet to MSU where the L-RAS tool was executed and remedial actions were communicated back to FSU to execute stabilizing controls on the simulated system. LCG Consulting developed the visualization and operator interaction interface, based on specifications provided by MSU. The project was performed from October 2012 to December 2016, at the end of which the L-RAS tool, as described above, was completed and demonstrated. The project resulted in the following innovations and contributions: (a) the L-RAS software prototype, tested on a simulated system, vetted by utility personnel, and potentially ready for wider testing and commercialization; (b) an RTDS-based test bed that can be used for future research in the field; (c) a suite of breakthrough theoretical contributions to the field of power system stability and control; and (d) a new tool for visualization of power system stability margins. While detailed descriptions of the development and implementation of the various project components have been provided in the quarterly reports, this final report provides an overview of the complete project, and is demonstrated using public domain test systems commonly used in the literature. The SCE system, and demonstrations thereon, are not included in this report due to Critical Energy Infrastructure Information (CEII) restrictions.