Engineering Papers⌕ Search

Engineering topics

Mishra, Chetan

Publications and source records attributed to Mishra, Chetan.

A Fixed-Flexible BESS Allocation Scheme for Transmission Networks Considering Uncertainties

Battery energy storage systems (BESSs) can play a key role in mitigating the intermittency and uncertainty associated with adding large amounts of renewable energy to the bulk power system (BPS). Two BESS technologies that have gained prominence in this regard are Lithium-ion (LI) BESS and Vanadium redox flow (VRF) BESS. Here, this paper proposes a fixed-flexible BESS allocation scheme that exploits the complementary characteristics of LI and VRF BESSs to attain optimal techno-economic benefits in a wind-integrated BPS. Studies carried out on relatively large transmission networks demonstrate that benefits such as reduction in system operation cost, wind spillage, voltage fluctuations, and discounted payback period, can be realized by using the proposed scheme.

42 ENGINEERING↗

Binary particle swarm optimisation‐based optimal substation coverage algorithm for phasor measurement unit installations in practical systems

Phasor measurement units (PMUs) play an important role in the wide‐area monitoring and protection of modern power systems. Historically, their deployment was limited by the prohibitive cost of the device itself. Therefore, the objective of the conventional optimal PMU placement problem was to find minimum number of devices, which when carefully placed throughout the network, maximised observability subject to different constraints. Due to improvements in relay technology, digital relays can now serve as both relays and PMUs. Under such circumstances, the substation installations consume the largest portion of the deployment cost, and not the devices themselves. Thus, for minimising cost of synchrophasor deployment, number of substation installations must be minimised. This study uses binary particle swarm optimisation to minimise number of substations in which installations must be performed for making all voltage levels observable, while being subject to various practical constraints. Standard IEEE systems have been used to explain the technique. Finally, a large‐scale network of Dominion Virginia Power is used as the test bed for implementation.

Mishra, Chetan↗