Engineering Papers⌕ Search

Engineering topics

Milligan, Michael

Publications and source records attributed to Milligan, Michael.

At least 19 records

Practice Consolidation Among U.S. Radiation Oncologists Over Time

Health care practices across the United States have been consolidating in response to various market forces. The degree of practice consolidation varies widely across specialties but has not been well studied within radiation oncology. This study used Medicare data to characterize the extent of practice consolidation among radiation oncologists and to investigate associated market factors.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Quantifying Risk in an Uncertain Future: The Evolution of Resource Adequacy

As our power grids transition toward a decarbonized energy mix, ensuring reliability and provision of grid services remains paramount. The power system has always been heavily influenced by the weather - extreme temperatures determine the timing of peak demand, winter cold snaps can limit natural gas supply, gas turbine reliability and output are affected by ambient conditions, and hydro output varies seasonally and annually. However, as the grid increasingly relies on variable renewable energy (VRE), like wind and solar, the attention to reliability and weather conditions is increasingly important. The implications of changing reliability are large. The Electric Reliability Council of Texas (ERCOT) rolling blackouts from earlier this year impacted millions of people across the state and could be seen from space (Figure 1).

hydraulic turbines↗

Intensity-coupled Polarization in Instruments with a Continuously Rotating Half-wave Plate

In this work, we discuss a systematic effect associated with measuring polarization with a continuously rotating half-wave plate (HWP). The effect was identified with the data from the E and B Experiment, which was a balloon-borne instrument designed to measure the polarization of the cosmic microwave background (CMB) as well as that from Galactic dust. The data show polarization fractions larger than 10%, while less than 3% were expected from instrumental polarization. We give evidence that the excess polarization is due to detector nonlinearity in the presence of a continuously rotating HWP. The nonlinearity couples intensity signals to polarization. We develop a map-based method to remove the excess polarization. Applying this method to the 150 (250) GHz band data, we find that 81% (92%) of the excess polarization was removed. Finally, characterization and mitigation of this effect are important for future experiments aiming to measure the CMB B-modes with a continuously rotating HWP.

79 ASTRONOMY AND ASTROPHYSICS↗

The EBEX Balloon-borne Experiment—Optics, Receiver, and Polarimetry

The E and B Experiment (EBEX) was a long-duration balloon-borne cosmic microwave background (CMB) polarimeter that flew over Antarctica in 2012. We describe the experiment's optical system, receiver, and polarimetric method and discuss their in-flight performance. EBEX had three frequency bands centered on 150, 250, and 410 GHz. To make effective use of limited mass and space, we created a 115 cm 2 sr high-throughput optical system that had two ambient temperature mirrors and four antireflection-coated polyethylene lenses per focal plane. All frequency bands shared the same optical train. Polarimetry was achieved with a continuously rotating achromatic half-wave plate (AHWP) that was levitated with a superconducting magnetic bearing (SMB). This is the first use of an SMB in astrophysics. Rotation stability was 0.45% over a period of 10 hr, and angular position accuracy was 0$^{°}_{.}$1. The measured modulation efficiency was above 90% for all bands. To our knowledge the 109% fractional bandwidth of the AHWP was the broadest implemented to date. The receiver, composed of one lens and the AHWP at a temperature of 4 K, the polarizing grid and other lenses at 1 K, and the two focal planes at 0.25 K, performed according to specifications, giving focal plane temperature stability with a fluctuation power spectrum that had a 1/f knee at 2 mHz. EBEX was the first balloon-borne instrument to implement technologies characteristic of modern CMB polarimeters, including high-throughput optical systems, and large arrays of transition edge sensor bolometric detectors with multiplexed readouts.

polarization↗

The EBEX Balloon-borne Experiment—Gondola, Attitude Control, and Control Software

The E and B Experiment (EBEX) was a long-duration balloon-borne instrument created to measure the polarization of the cosmic microwave background (CMB) radiation. EBEX was the first balloon-borne instrument to implement a kilopixel array of transition edge sensor (TES) bolometric detectors and the first CMB experiment to use the digital version of the frequency domain multiplexing system for readout of the TES array. The scan strategy relied on 40 s peak-to-peak constant-velocity azimuthal scans. We report on the unique demands on the design and operation of the payload that resulted from these new technologies and the scan strategy. We describe the solutions implemented, including the development of a power system designed to provide a total of at least 2.3 kW, a cooling system to dissipate 590 W consumed by the detectors' readout system, software to manage and handle the data of the kilopixel array, and specialized attitude reconstruction software. We demonstrate flight performance data reflecting faultless management of the TES array, adequate powering and cooling of the readout electronics, and constraint of attitude reconstruction errors such that the spurious B-modes they induced were less than 10% of the CMB B-mode power spectrum with r = 0.05.

polarization↗

The EBEX Balloon-borne Experiment—Detectors and Readout

EBEX was a long-duration balloon-borne experiment to measure the polarization of the cosmic microwave background. The experiment had three frequency bands centered at 150, 250, and 410 GHz and was the first to use a kilopixel array of transition edge sensor bolometers aboard a balloon platform. We determine the design and characterization of the array and the readout system. From the lowest to highest frequency, the median measured detectors' average thermal conductances were 39, 53, and 63 pW/K, the medians of transition temperatures were 0.45, 0.48, and 0.47 K, and the medians of normal resistances were 1.9, 1.5, and 1.4 Ω; moreover, we give the measured distributions. With the exception of the thermal conductance at 150 GHz, all measured values are within 30% of their design. We measure median low-loop-gain time constants τ 0 = 88, 46, and 57 ms. Two measurements of bolometer absorption efficiency gave results consistent within 10% and showing high (~0.9) efficiency at 150 GHz and medium (~0.35 and ~0.25) efficiency at the two higher bands. We calculate a median total optical power absorbed of 3.6, 5.3, and 5.0 pW. EBEX pioneered the use of the digital version of the frequency domain multiplexing system. We multiplexed the bias and readout of 16 bolometers onto two wires. The median per-detector noise-equivalent temperatures are 400, 920, and 14,500 $\mu {{\rm{K}}}_{{\rm{cmb}}}\sqrt{{\rm{s}}}$. We compare these values to our preflight predictions and to a previous balloon payload. We report on the sources of excess noise and the path for a future payload to make full use of the balloon environment.

instrumentation: polarimeters↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Regional Study: Andhra Pradesh [PowerPoint]

This chapter on Andhra Pradesh is one of six state chapters included in Appendix C of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study). The objective of the state chapters is to provide modeling assumptions, results, and next steps to use and improve the model specific to each state. The model has inherent uncertainties, particularly in how the intrastate transmission network and RE generation projects will develop (e.g., locations, capacities). The model also does not include information on contracts or must-run status of particular plants for reliability purposes. By providing details on the higher spatial resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.'

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Regional Study: Gujarat

This chapter on Andhra Pradesh is one of six state chapters included in Appendix C of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study). The objective of the state chapters is to provide modeling assumptions, results, and next steps to use and improve the model specific to each state. The model has inherent uncertainties, particularly in how the intrastate transmission network and RE generation projects will develop (e.g., locations, capacities). The model also does not include information on contracts or must-run status of particular plants for reliability purposes. By providing details on the higher spatial resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.'

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Regional Study: Karnataka

This chapter on Andhra Pradesh is one of six state chapters included in Appendix C of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study). The objective of the state chapters is to provide modeling assumptions, results, and next steps to use and improve the model specific to each state. The model has inherent uncertainties, particularly in how the intrastate transmission network and RE generation projects will develop (e.g., locations, capacities). The model also does not include information on contracts or must-run status of particular plants for reliability purposes. By providing details on the higher spatial resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.'

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Regional Study: Maharashtra

This chapter on Andhra Pradesh is one of six state chapters included in Appendix C of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study). The objective of the state chapters is to provide modeling assumptions, results, and next steps to use and improve the model specific to each state. The model has inherent uncertainties, particularly in how the intrastate transmission network and RE generation projects will develop (e.g., locations, capacities). The model also does not include information on contracts or must-run status of particular plants for reliability purposes. By providing details on the higher spatial resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.'

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Regional Study: Rajasthan

This chapter on Andhra Pradesh is one of six state chapters included in Appendix C of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study). The objective of the state chapters is to provide modeling assumptions, results, and next steps to use and improve the model specific to each state. The model has inherent uncertainties, particularly in how the intrastate transmission network and RE generation projects will develop (e.g., locations, capacities). The model also does not include information on contracts or must-run status of particular plants for reliability purposes. By providing details on the higher spatial resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.'

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Regional Study: Tamil Nadu

This chapter on Tamil Nadu is one of six state chapters included in Appendix C of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study). The objective of the state chapters is to provide modeling assumptions, results, and next steps to use and improve the model specific to each state. The model has inherent uncertainties, particularly in how the intrastate transmission network and RE generation projects will develop (e.g., locations, capacities). The model also does not include information on contracts or must-run status of particular plants for reliability purposes. By providing details on the higher spatial resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.'

24 POWER TRANSMISSION AND DISTRIBUTION↗

Overview of Wholesale Electricity Markets

This chapter provides a comprehensive review of four key electricity markets: energy markets (day-ahead and real-time markets); ancillary service markets; financial transmission rights markets; capacity markets. It also discusses how the outcomes of each of these markets may be impacted by the introduction of high penetrations of variable generation. Furthermore, the chapter examines considerations needed to ensure that wholesale market designs are inclusive of emerging technologies, such as demand response, distributed generation, and distributed storage.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Incentivizing Flexibility in System Operations

Defining flexibility has been a challenge that a number of industry members and researchers have attempted to address in recent years. With increased variability and uncertainty of variable generation (VG), the resources on the system will have to be more flexible to adjust output, so that power output ranges, power ramp rates, and energy duration sustainability are sufficient to meet the needs of balancing supply with demand at various operational timescales. This chapter discusses whether existing market designs provide adequate incentives for resources to offer their flexibility into the market to meet the increased levels of variability and uncertainty introduced by VG in the short-term operational time frame. It presents a definition of flexibility and discusses how increased levels of VG require increased needs for flexibility on power systems. Following this introductory material, the chapter examines how existing market designs ensure that resources have the right incentives to provide increased flexibility, and then discusses a number of emerging market design elements that impact flexibility incentives.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Long-Term Resource Adequacy, Long-Term Flexibility Requirements, and Revenue Sufficiency

Variable generation (VG) can reduce market prices over time and also the energy that other suppliers can sell in the market. The suppliers that are needed to provide capacity and flexibility to meet the long-term reliability requirements may, therefore, earn less revenue. This chapter discusses the topics of resource adequacy and revenue sufficiency - that is, determining and acquiring the quantity of capacity that will be needed at some future date and ensuring that those suppliers that offer the capacity receive sufficient revenue to recover their costs. The focus is on the investment time horizon and the installation of sufficient generation capability. First, the chapter discusses resource adequacy, including newer methods of determining adequacy metrics. The chapter then focuses on revenue sufficiency and how suppliers have sufficient opportunity to recover their total costs. The chapter closes with a description of the mechanisms traditionally adopted by electricity markets to mitigate the issues of resource adequacy and revenue sufficiency and discusses the most recent market design changes to address these issues.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Marginal Cost Pricing in a World without Perfect Competition: Implications for Electricity Markets with High Shares of Low Marginal Cost Resources

A common approach to regulating electricity is through auction-based competitive wholesale markets. The goal of this approach is to provide a reliable supply of power at the lowest reasonable cost to the consumer. This necessitates market structures and operating rules that ensure revenue sufficiency for all generators needed for resource adequacy purposes. Wholesale electricity markets employ marginal-cost pricing to provide cost-effective dispatch such that resources are compensated for their operational costs. However, marginal-cost pricing alone cannot guarantee cost recovery outside of perfect competition, and electricity markets have at least six attributes that preclude them from functioning as perfectly competitive markets. These attributes include market power, externalities, public good attributes, lack of storage, wholesale price caps, and ineffective demand curve. Until (and unless) these failures are ameliorated, some form of corrective action(s) will be necessary to improve market efficiency so that prices can correctly reflect the needed level of system reliability. Many of these options necessarily involve some form of administrative or out-of-market actions, such as scarcity pricing, capacity payments, bilateral or other out-of-market contracts, or some hybrid combination. A key focus with these options is to create a connection between the electricity market and long-term reliability/loss-of-load expectation targets, which are inherently disconnected in the native markets because of the aforementioned market failures. The addition of variable generation resources can exacerbate revenue sufficiency and resource adequacy concerns caused by these underlying market failures. Because variable generation resources have near-zero marginal costs, they effectively suppress energy prices and reduce the capacity factors of conventional generators through the merit-order effect in the simplest case of a convex market; non-convexities can also suppress prices.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study

The higher-spatial-resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.' The Regional Study validates the relative value of mitigation strategies demonstrated in the National Study - namely, coordinated operations among states reduce production costs, and reducing coal minimum generation levels reduces RE curtailment. Significantly, the Regional Study also highlights a potential barrier to realizing the value of these mitigation strategies: when locations of RE development are planned independently of state-level transmission, intrastate congestion can result in undesirable levels of RE curtailment. Therefore a key objective of this study is to illustrate to state-level power system planners and operators, in particular, how a higher-resolution model, inclusive of intrastate granularity, can be used as a planning tool for two primary purposes: -To better anticipate, understand, and mitigate system constraints that could affect RE integration; and - To provide a modeling framework that can be used as part of future transmission studies and planning efforts. The Regional Study is not intended to predict precisely how RE will affect state-level operations. There is considerable uncertainty regarding the locations of the RE development, as well as how contract terms can affect access to the inherent physical flexibility of the system. But the scenarios analyzed identify the types of issues that can arise under various RE and transmission expansion pathways. The model developed for this study provides a rigorous framework for future work and can be updated with the characteristics of new capacity as more information on the future power system is known.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I -- National Study

The use of renewable energy (RE) sources, primarily wind and solar generation, is poised to grow significantly within the Indian power system. The Government of India has established a target of 175 gigawatts (GW) of installed RE capacity by 2022, including 60 GW of wind and 100 GW of solar, up from 29 GW wind and 9 GW solar at the beginning of 2017. Thanks to advanced weather and power system modeling made for this project, the study team is able to explore operational impacts of meeting India's RE targets and identify actions that may be favorable for integration. Our primary tool is a detailed production cost model, which simulates optimal scheduling and dispatch of available generation in a future year (2022) by minimizing total production costs subject to physical, operational, and market constraints. Our team comprises a core group from the Power System Operation Corporation, Ltd. (POSOCO), which is the national grid operator (with representation from the National, Southern, and Western Regional Load Dispatch Centers) under Ministry of Power, National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (LBNL), and a broader modeling team that includes Central Electricity Authority (CEA), POWERGRID (the central transmission utility, CTU), and State Load Dispatch Centers in Maharashtra, Gujarat, Tamil Nadu, Karnataka, Rajasthan, and Andhra Pradesh. Our model includes high-resolution wind and solar data (forecasts and actuals), unique properties for each generator, CEA/CTU's anticipated buildout of the power system, and enforced state-to-state transmission flows. Assuming the fulfillment of current efforts to provide better access to the physical flexibility of the power system, we find that power system balancing with 100 GW of solar and 60 GW of wind is achievable at 15-minute operational timescales with minimal RE curtailment. This RE capacity meets 22% of total projected 2022 electricity consumption in India with annual RE curtailment of 1.4%, in line with experiences in other countries with significant RE penetrations (Bird et al. 2016). Changes to operational practice can further reduce the cost of operating the power system and reduce RE curtailment. Coordinating scheduling and dispatch over a broader area is the largest driver to reduce costs, saving INR 6300 crore (USD $920 million) annually when optimized regionally. Lowering minimum operating levels of coal plants (from 70% to 40%) is the biggest driver to reduce RE curtailment - from 3.5% down to 0.76%. In fact, this operating property is more influential than faster thermal generation ramp rates in lowering the projected levels of curtailment. While this study does not answer every question relevant to planning for India's 2022 RE targets, it is an important step toward analyzing operational challenges and cost saving opportunities using state-of-the-art power system planning tools. Further analysis can build upon this basis to explore optimal renewable resource and intrastate transmission siting, system stability during contingencies, and the influence of total power system investment costs on customer tariffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗