DOE OSTI2008
After the decision to shut down the 10 MW ASTRA-MTR Research Reactor was reached in May 1998, the possible options and required phases for decommissioning and removal of the radioactive components were evaluated in a decommissioning study. To support the decisions at each phase, an estimate of the activity inventory in the various parts of the reactor and the waste volume to be expected was performed. Of the possible options an immediate dismantling to phase 1 of IAEA Technical Guide Lines after the immediately following, continued dismantling to phase 2 of these guide lines was identified as the most reasonable and under the auspices optimum choice. The actual decommissioning work on the ASTRA-Reactor began in January 2000 after its final shutdown on July 31, 1999. Preliminary evaluations of the activity inventory gave an estimated amount of 320 kg of intermediate level waste, of about 60 metric tons of contaminated and another 100 metric tons of activated low level radioactive waste. The activities were roughly estimated to be at 200 TBq in the intermediate level and 6 GBq in the low level. The structure of the decommissioning process was decided against cost-, time- and risk-optimization following the basic layout of the main tasks, e.g. the removing of the fuel, the recovering and the treatment of the intermediate level activities in the vicinity of the core, the handling and conditioning of the neutron exposed graphite and the Beryllium-elements. As an example, the dismantling of approx. 1400 metric tons of the biological shield is described in more detail from the determination of the dismantling technique to the clearing procedures and the deposition. The process of dismantling of the biological shield is presented in fast motion. The dismantling of the pump-room installations of the primary loop, the processing of the contaminated or activated metals, the dismantling of the ventilation system and the radiological clearance of the reactor building was done under optimized conditions and is explained in the following. Spent fuel was generally delivered to the US Department of Energy - DOE in several shipments over the operational time of the ASTRA reactor. With the last shipment in May 2001 all the remaining spent fuel elements out of the ASTRA reactor consignment were transferred to DOE. To reduce waste from concrete shielding, German regulations Dt.StrSchV, annex IV, table 1, two clearance values referring to 'clearance restricted for permanent deposit' and to a clearance for unrestricted re-use were used. In order to reduce the amount of an estimated 60 tons of slightly contaminated metals, it was determined that introducing re-melting procedures were the most economical way. To obtain radiological clearance of the reactor building, compliance with the release limits according to Austrian Radiation Protection Ordinance had to be proved to the regulatory body. There, in general, the limits for unrestricted release were defined as a maximum dose rate of 10 {mu}Sv effective for an individual person per year. The results of the regular yearly medical examinations of the staff indicated no influence of the work related to decommissioning. The readings of the personal dosimeters over the entire project amounted to a total of 85.6 mSv, averaging to 1.07 mSv per year and person. After finishing the decommissioning process, the material balance showed 89.6 % for unrestricted reuse, 6.6 % for conventional mass-dumping and 3.8 % of ILW and LLW. The project was covered by an extensive documentation. All operations within NES followed ISO 9000 quality insurance standards. Experiences and knowledge were presented to and shared with the community, e.g. AFR and IAEA throughout the project. (authors)
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗