Engineering PapersSearch

Engineering topics

Menon, Premkumar R.

Publications and source records attributed to Menon, Premkumar R..

Mars Reconnaissance Orbiter Maneuver Plan Following Mars 2020 Landing

The Mars Reconnaissance Orbiter spacecraft continues to perform valuable science observations at Mars, provide telecommunication relay for surface assets, and characterize landing sites for future missions. The spacecraft provided the primary relay support for the Mars 2020 mission during entry, descent, and landing on February 18, 2021. This paper discusses the propulsive maneuver plan following the Mars 2020 landing to return the spacecraft to its primary science orbit by November 2021 and maintain it through 2029. Alternate maneuver plans considered for supporting Mars 2020 surface operations and the entry, descent, and landing of the ExoMars 2022 mission are also described.

Menon, Premkumar R.

Mars Reconnaissance Orbiter Navigation Strategy for Support of Mars 2020 Mission's Entry, Descent and Landing Sequence

The Mars Reconnaissance Orbiter provided primary relay support during the Mars 2020 mission’s entry, descent, and landing sequence on February 18, 2021. To position the orbiter for relay support during this sequence, two propulsive maneuvers were performed: the first on September 2, 2020 and the second on January 20, 2021. This paper documents the maneuver strategy developed by the navigation team for positioning the Mars Reconnaissance Orbiter to within phasing requirements to support the Mars 2020 mission during landing and provides details on how well those phasing requirements were met.

Woollands, Robyn M.

Mars Reconnaissance Orbiter navigation strategy for support of InSight lander's entry, descent, and landing sequence

The Mars Reconnaissance Orbiter (MRO) provided primary relay support for surface operations of the InSight mission immediately after it landed on Mars on November26,2018. To position MRO for relay support during InSight Entry, Descent and Landing (EDL), two propulsive maneuvers were performed in August and October 2018. This paper documents the maneuver strategy employed by the MRO Navigation Team to support the InSight EDL sequence.

Criddle, Kevin E.

Mars Reconnaissance Orbiter maneuver plan for Mars 2020 entry, descent, and landing support and beyond

The Mars Reconnaissance Orbiter (MRO) spacecraft continues to perform valuable science observations at Mars, provide telecommunication relay for surface assets, and characterize landing sites for future missions. MRO provided primary relay support for the InSight Mission during Entry, Descent, and Landing (EDL) on November26, 2018. This paper discusses the current maneuver plan to support Mars 2020 EDL and maintain MRO’s orbit for science operations through 2028.

Menon, Premkumar R.

Mars Reconnaissance Orbiter Navigation Strategy for the Comet Siding Spring Encounter

Comet Siding Spring encountered Mars on October 19, 2014 at a distance of about 140,500 km - the nearest comet flyby of a planet in recorded history. Mars Reconnaissance Orbiter (MRO) was able to detect the comet, gather science data, and capture images of the comet as it approached Mars. To help protect MRO from the incoming comet particles, two propulsive maneuvers were performed to position the spacecraft behind Mars at the arrival time of the expected peak particle fluency. This paper documents the strategy that the MRO Navigation Team executed to mitigate risk from the comet particles while allowing scientific observations of the comet flyby.

maneuvers

Mars Reconnaissance Orbiter Navigation Strategy for Dual Support of Insight and ExoMars Entry, Descent and Landing Demonstrator Module in 2016

Mars Reconnaissance Orbiter (MRO) will support NASA's InSight Mission and ESA's ExoMars Entry, Descent and Landing Demonstrator Module (EDM) in the fall of 2016 when both landers arrive at Mars. MRO provided relay support during the Entry, Descent and Landing (EDL) sequences of Mars Phoenix Lander in 2008 and the Mars Science Laboratory in 2012. Unlike these missions, MRO will coordinate between two EDL events separated by only three weeks: InSight on September 28, 2016 and EDM on October 19, 2016. This paper describes MRO Navigation's maneuver strategy to move MRO's ascending node to meet the In- Sight EDL phasing requirement and support EDM.

EDM

Using Mean Orbit Period in Mars Reconnaissance Orbiter Maneuver Design

Mars Reconnaissance Orbiter (MRO) has provided communication relays for a number of Mars spacecraft. In 2016 MRO is expected to support a relay for NASA's Interior Exploration using Seismic Investigations, Geodesy and Heat Transport (InSight) spacecraft. In addition, support may be needed by another mission, ESA's ExoMars EDL Demonstrator Module's (EDM), only 21 days after the InSight coverage. The close proximity of these two events presents a unique challenge to a conventional orbit synchronization maneuver where one deterministic maneuver is executed prior to each relay. Since the two events are close together and the difference in required phasing between InSight and EDM may be up to half an orbit (yielding a large execution error), the downtrack timing error can increase rapidly at the EDM encounter. Thus, a new maneuver strategy that does not require a deterministic maneuver in-between the two events (with only a small statistical cleanup) is proposed in the paper. This proposed strategy rests heavily on the stability of the mean orbital period. The ability to search and set the specified mean period is fundamental in the proposed maneuver design as well as in understanding the scope of the problem. The proposed strategy is explained and its result is used to understand and solve the problem in the flight operations environment.

Chung, Min-Kun J.

Mars Reconnaissance Orbiter Navigation Strategy for Mars Science Laboratory Entry, Descent and Landing Telecommunication Relay Support

The Mars Reconnaissance Orbiter (MRO) is an orbiting asset that performs remote sensing observations in order to characterize the surface, subsurface and atmosphere of Mars. To support upcoming NASA Mars Exploration Program Office objectives, MRO will be used as a relay communication link for the Mars Science Laboratory (MSL) mission during the MSL Entry, Descent and Landing sequence. To do so, MRO Navigation must synchronize the MRO Primary Science Orbit (PSO) with a set of target conditions requested by the MSL Navigation Team; this may be accomplished via propulsive maneuvers. This paper describes the MRO Navigation strategy for and operational performance of MSL EDL relay telecommunication support.

Mars Reconnaissance Orbiter (MRO)

Spitzer Orbit Determination During In-orbit Checkout Phase

The Spitzer Space Telescope was injected into heliocentric orbit on August 25, 2003 to observe and study astrophysical phenomena in the infrared range of frequencies. The initial 60 days was dedicated to Spitzer's "In-Orbit Checkout (IOC)" efforts. During this time high levels of Helium venting were used to cool down the telescope. Attitude control was done using reaction wheels, which in turn were de-saturated using cold gas Nitrogen thrusting. Dense tracking data (nearly continuous) by the Deep Space network (DSN) were used to perform orbit determination and to assess any possible venting imbalance. Only Doppler data were available for navigation. This paper deals with navigation efforts during the IOC phase. It includes Dust Cover Ejection (DCE) monitoring, orbit determination strategy validation and results and assessment of non-gravitational accelerations acting on Spitzer including that due to possible imbalance in Helium venting.

helium venting

Stardust Navigation Covariance Analysis

The Stardust spacecraft was launched on February 7, 1999 aboard a Boeing Delta-II rocket. Mission participants include the National Aeronautics and Space Administration (NASA), the Jet Propulsion Laboratory (JPL), Lockheed Martin Astronautics (LMA) and the University of Washington. The primary objective of the mission is to collect in-situ samples of the coma of comet Wild-2 and return those samples to the Earth for analysis. Mission design and operational navigation for Stardust is performed by the Jet Propulsion Laboratory (JPL). This paper will describe the extensive JPL effort in support of the Stardust pre-launch analysis of the orbit determination component of the mission covariance study. A description of the mission and it's trajectory will be provided first, followed by a discussion of the covariance procedure and models. Predicted accuracy's will be examined as they relate to navigation delivery requirements for specific critical events during the mission. Stardust was launched into a heliocentric trajectory in early 1999. It will perform an Earth Gravity Assist (EGA) on January 15, 2001 to acquire an orbit for the eventual rendezvous with comet Wild-2. The spacecraft will fly through the coma (atmosphere) on the dayside of Wild-2 on January 2, 2004. At that time samples will be obtained using an aerogel collector. After the comet encounter Stardust will return to Earth when the Sample Return Capsule (SRC) will separate and land at the Utah Test Site (UTTR) on January 15, 2006. The spacecraft will however be deflected off into a heliocentric orbit. The mission is divided into three phases for the covariance analysis. They are 1) Launch to EGA, 2) EGA to Wild-2 encounter and 3) Wild-2 encounter to Earth reentry. Orbit determination assumptions for each phase are provided. These include estimated and consider parameters and their associated a-priori uncertainties. Major perturbations to the trajectory include 19 deterministic and statistical maneuvers planned for the mission. The spacecraft is three axis stabilized and has unbalanced thrusters for attitude control. Accelerations due to the attitude control system are treated stochastically. The tracking scenario for the study is patterned after the actual schedule employed during the different phases of the mission. Conventional X-band two-way Doppler and SRA range data was simulated and the standard accuracy for these data types was assumed throughout most of the mission. However, a deweighting scheme was used for the Doppler data during times of low Sun-Earth-Probe angles, especially in the case of the DSM. Optical data is assumed to be available starting at 50 days prior to the comet encounter. The optical data will be used to improve the ephemeris of Wild-2, which is considered crucial to properly target the comet flyby. Results of the covariance analysis are presented for all mission phases. Navigation capability will be discussed in terms of the uncertainty in the encounter B-Plane (B.R and B.T) and linearized time of flight. Delivery errors based on the final maneuver prior to the comet encounter will be presented. The most stringent navigation requirement is for the Earth reentry. The uncertainty in the flight path angle must be less than 0.02 degree (orbit determination and maneuver performance) to assure successful recovery of the SRC. Results presented show that this requirement can be met.

Menon, Premkumar R.

Orbit Determination of Hiten for Insertion into Lunar Orbit

On Feb. 15, 1992 the HITEN spacecraft was inserted into orbit about the Moon. HITEN was launched on 24 January 1990, by Japan's Institute for Space and Astronautic Science (ISAS) and traversed the Earth's geotail region survived two aerobraking passes in the Earth's atmosphere (March 1991), and visited the regions near the Earth-Moon.

Hiten