Engineering PapersSearch

Engineering topics

McGilton, Ben [National Renewable Energy Laboratory (NREL), Golden, CO (United States)] (ORCID:0000000193173346)

Publications and source records attributed to McGilton, Ben [National Renewable Energy Laboratory (NREL), Golden, CO (United States)] (ORCID:0000000193173346).

On the optimal sizing of power take-off systems for wave energy converters

The power take-off (PTO) system in a wave energy converter (WEC) is the means by which the energy in an ocean wave is converted into useful energy. There has been a general lack of technology convergence in the wave energy industry and PTO design has been largely device-specific with the design process determined by the WEC developer. An optimized PTO design can significantly affect the efficiency, reliability, performance, and overall cost and viability of a device. There remains a need in the marine energy industry for best practices and efficient design processes to be identified as it could greatly benefit developers and researchers in designing an optimal WEC PTO. This research utilizes the open-source Matlab-Simulink based software, WEC-Sim, which was developed by the National Renewable Energy Laboratory, and the Eagle, a high-performance computing system, to model and optimize two WECs of different archetypes and then investigates if any trends exist that can be exploited for greater efficiency in optimal PTO design. The results from this research indicate that there may be an optimal sizing for WEC PTOs for both power and PTO force rating and that substantial reductions can be made in the cost of a device without significant loss in the energy produced. Furthermore this optimal sizing may be independent of WEC type and deployment location. With an optimal, or near optimal, approach to WEC PTO sizing demonstrated, a methodology is proposed to address the challenge of nameplate ratings in the wave energy industry.

13 HYDRO ENERGY

Design and performance validation of a high-temperature downhole permanent magnet generator used for an electro-pulse boring system in geothermal energy applications

Novel, direct-energy drilling technologies such as electro-pulse boring, have the potential to significantly increase the speed and depth of geothermal drilling but have not achieved widespread adoption due to several economic and technical barriers. One major challenge is that these drilling systems require electric power downhole. The current practice is to supply power to the drill string components by running electric cables down the geothermal well, but at the targeted well depths, this practice is cost-inhibitive, inefficient in terms of power consumption, and adds an additional failure point with the long cabling going through a highly corrosive, high-temperature environment. A solution to this problem is to develop high-temperature electric generator technology that can generate the required power downhole. Such a generator must also operate with high efficiency at the target downhole ambient temperature of 250 °C. In this paper, we investigate the various design considerations for this concept and subsequently design the downhole electric generator using a multi-objective design optimization approach. Through electromagnetic-, thermal- and short-circuit fault condition analysis, it is demonstrated that the optimized downhole electric generator concept presented in this paper can meet the performance requirements within this extreme drilling environment. Most remarkably, it is shown that a generator efficiency of 90% is achieved. In conclusion, to validate the results presented in this paper, a prototype generator is built and its performance is measured at 250 °C using a test bench uniquely developed for this application.

15 GEOTHERMAL ENERGY