Engineering Papers⌕ Search

Engineering topics

McElrath, Timothy

Publications and source records attributed to McElrath, Timothy.

GTOC9: Methods and Results from the Jet Propulsion Laboratory Team

The removal of 123 pieces of debris from the Sunsynchronous LEO environment is accomplished by a 10-spacecraft campaign wherein the spacecraft, flying in succession over an 8-yr period, rendezvous with a series of the debris objects, delivering a de-orbit package at each one before moving on to the next object by means of impulsive manoeuvres. This was the GTOC9 problem, as posed by the European Space Agency. The methods used by the Jet Propulsion Laboratory team are described, along with the winning solution found by the team. Methods include branch-and-bound searches that exploit the natural nodal drift to compute long chains of rendezvous with debris objects, beam searches for synthesising campaigns, ant colony optimisation, and a genetic algorithm. Databases of transfers between all bodies on a fine time grid are made, containing an easyto- compute yet accurate estimate of the transfer V . Lastly, a final non-linear programming optimisation is performed to ensure the trajectories meet all the constraints and are locally optimal in initial mass.

Sims, Jon↗

Orbit Determination Covariance Analysis for the Europa Clipper Mission

A new Jovian satellite tour is proposed by NASA, which would include numerous flybys of the moon Europa, and would explore its potential habitability by characterizing the existence of any water within and beneath Europa's ice shell. This paper describes the results of a covariance study that was undertaken on a sample tour to assess the navigational challenges and capabilities of such a mission from an orbit determination (OD) point of view, and to help establish a delta V budget for the maneuvers needed to keep the spacecraft on the reference trajectory. Additional parametric variations from the baseline case were also investigated. The success of the Europa Clipper mission will depend on the science measurements that it will enable. Meeting the requirements of the instruments onboard the spacecraft is an integral part of this analysis.

satellite tour↗

Overview of Mission Design for NASA Asteroid Redirect Robotic Mission Concept

Part of NASA's new asteroid initiative would be a robotic mission to capture a roughly four to ten meter asteroid and redirect its orbit to place it in translunar space. Once in a stable storage orbit at the Moon, astronauts would then visit the asteroid for science investigations, to test in space resource extraction, and to develop experience with human deep space missions. This paper discusses the mission design techniques that would enable the redirection of a 100-1000 metric ton asteroid into lunar orbit with a 40-50 kW Solar Electric Propulsion (SEP) system.

Asteroid Redirect Robotic Vehicle (ARRV)↗

Stardust-next : Lessons Learned from a Comet Flyby Mission

The Stardust-NExT (New Exploration of Tempel) mission, a follow-on to the Stardust prime mission, successfully completed a flyby of comet Tempel-1 on 2/14/11. However there were many challenges along the way, most significantly low propellant margin and detection of the comet in imagery later than antici-pated. These challenges and their ramifications forced the project to respond with flexibility and ingenuity. As a result, the flyby at an altitude of 178 km was nearly flawless, accomplishing all its science objectives. Lessons learned on Stardust-NExT may have relevance to other spacecraft missions.

Tempel 1↗

Navigating Stardust-NEXT: The Road to Tempel 1

The Stardust-NExT (New Exploration of Tempel) mission, a follow-on to the Stardust prime mission, successfully completed a flyby of comet Tempel-1 on 2/14/11. However there were many challenges along the way in navigating this mission to its successful conclusion, most significantly low propellant margin and detection of the comet in imagery later than anticipated. These challenges and their ramifications forced the navigation team and the project to respond with flexibility and ingenuity. As a result, the resulting flyby at an altitude of 178 km was nearly flawless, accomplishing all its science objectives.

flyby↗

Orbit Determination for the 2007 Mars Phoenix Lander

The Phoenix mission is designed to study the arctic region of Mars. To achieve this goal, the spacecraft must be delivered to a narrow corridor at the top of the Martian atmosphere, which is approximately 20 km wide. This paper will discuss the details of the Phoenix orbit determination process and the effort to reduce errors below the level necessary to achieve successful atmospheric entry at Mars. Emphasis will be placed on properly modeling forces that perturb the spacecraft trajectory and the errors and uncertainties associated with those forces. Orbit determination covariance analysis strongly influenced mission operations scenarios, which were chosen to minimize errors and associated uncertainties.

Ryne, Mark S.↗