Engineering Papers⌕ Search

Engineering topics

Mary K Kaiser

Publications and source records attributed to Mary K Kaiser.

Exploration Systems Exterior Lighting Design Guidance

Humans are returning to the Moon — this time, to stay. NASA has selected a location that maximizes line-of-sight communication with Earth, solar visibility, and access to water ice: the Lunar South Pole (LSP). While the Sun is more consistently in the lunar sky at the poles, it never rises more than 7° above the horizon in the target landing regions. This harsh lighting environment--never experienced during the Apollo missions or in human spaceflight--presents an engineering challenge: Support and protect functional vision. The human vision system, which despite having a high-dynamic range, cannot see well into bright light and cannot adapt quickly from bright to dark or vice versa. The design of helmets, windows, and lighting solutions must work in a complementary fashion to achieve a system of lighting and functional vision support that enables crews to see into darkness while their eyes are light-adapted and see in bright light while still dark-adapted that protects their eyes from injury. This report brings together information and identifies gaps related to LSP Natural environment (topology, regolith, temperature, lighting, and so forth), NASA historical experience exploring the Moon, human vision capabilities and needs, exploration operations, simulation capabilities and needs (for design verification, training, mission planning, and so forth) and existing engineering, safety, medical and performance requirements related to support human exploration.

Simulation↗

Human Factors Support for On-Orbit Servicing, Assembly and Manufacturing Mission 1 (OSAM-1)

The NASA Engineering and Safety Center (NESC) Human Factors Technical Discipline Team was requested by the Satellite Servicing Projects Division at Goddard Space Flight Center to provide support in assessing the design of the On-Orbit Servicing, Assembly and Manufacturing Mission 1 (OSAM-1) Mission Operations Center in light of concerns about overcrowding and potential for distractions, as well as assistance in creating a Human-Machine Interface style guide for OSAM-1 user interface design. This report contains the outcome of the NESC assessment.

On-Orbit Servicing, Assembly and Manufacturing Mis↗

Miserable Risk Estimation: “Managing” Low-Probability, High-Consequence Risks

As with all bold endeavors, NASA missions must identify and manage their risks. While estimating the consequences of these risks is typically straightforward, it can be challenging to estimate their likelihood. This is especially true for low-probability risks, due both to the lack of operational data and the cognitive biases humans bring to risk estimation. In this talk, I will present both a tongue-in-cheek and “Management Science” approach to estimating low-probability, high-consequence risks. I then summon my Human Factors colleagues to provide NASA mission managers with the gentle guidance needed to avoid common errors in risk assessment

Mary K Kaiser↗