Engineering Papers⌕ Search

Engineering topics

Maloney, Patrick R.

Publications and source records attributed to Maloney, Patrick R..

EverGREEN 2045: An Energy mix to Decarbonize Washington State

The Clean Energy Transformation Act transitions Washington State to 100% clean energy by 2045. As the future resource mix will likely include intermittent renewables, hydropower, and new, carbon-free, flexible technologies including advanced nuclear reactors and enhanced geothermal systems, we assess the cost and feasibility of the future resource mix with proprietary cost data from our industry partners for new technologies. For plausible future resource mix scenarios, we find that revenues are sufficient to cover variable operations and maintenance costs for most technologies, but capacity payments or power purchase agreements will be necessary for new, flexible resources to participate in the future resource mix.

clean energy, energy policy, energy transition, re↗

Representative Period Selection for Robust Capacity Expansion Planning in Low-carbon Grids

With the increasing urgency to decarbonize power systems, while mitigating extreme events, capacity expansion models can play a vital role in reliably planning the expansion of power systems and facilitating the integration of renewable energy sources. Optimizing capacity expansion generally involves selecting surrogate representative days from forecasts of load and the generation profiles of variable renewable energy resources. To properly select those representative days, we propose a novel input-based approach in combination with the k-means clustering algorithm that utilize three unique operational inputs: load shedding, renewable curtailment, and transmission congestion. The proposed method allows for more robust and cost-effective capacity planning. The method is validated using a capacity expansion model and a production cost model based on California Independent System Operator (CAISO)'s decarbonization goals, and results in reduced costs and drastically lower load shedding.

Anderson, Osten P.↗

EverGREEN 2045: An Energy Mix to Decarbonize Washington State

Washington State’s future resource mix is likely to be comprised of intermittent renewables and carbon-free generation including hydropower by 2045. Generation will likely be comprised of wind, solar photovoltaic (PV), batteries, pumped storage hydropower (PSH), existing nuclear power plants, and potentially enhanced geothermal systems and advanced nuclear reactor technologies. To assess the cost and stability of the future resource mix, we partner with X-energy (advanced reactor design) and AltaRock Energy (enhanced geothermal system) for proprietary cost data. After estimating the costs of these two new technologies, we design plausible future resource mix scenarios to meet Washington State’s Clean Energy Transformation Act which transitions the state to carbon-free generation by 2045. We assess the cost and stability of the future resource mix with power system analysis tools, finding revenues are sufficient to cover variable operating and maintenance costs for most technologies providing power in 2030 and 2045, but capacity payments or power purchase agreements will likely be necessary for flexible resources, including enhanced geothermal systems and advanced nuclear reactors, to participate in the future resource mix.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Monte Carlo-based Transmission and Subtransmission Recovery Simulation of Hurricanes

High-impact low-probability (HILP) events can wreak havoc on electric power systems without appropriate preparedness. In this paper, the recent development of a tool, named Recovery Simulator and Analysis (RSA), is described and demonstrated. While there are many issues to consider when recovering electric power systems, the focus of RSA is on the coordination of transmission and subtransmission recovery with generation dispatch to minimize unserved energy. RSA focuses on recovery simulation to evaluate resilience as part of a planning process. RSA is demonstrated on an approximately 1400-bus Puerto Rican power system for 100 simulated instances of Hurricane Maria. Analysis of the recovery determines how many lines are critical to the recovery and which loads may experience delayed recovery. The results demonstrate the potential uses of RSA for identifying recovery decisions with low unserved energy and for identifying assets critical to recovery which can then be hardened prior to a HILP event.

Maloney, Patrick R.↗

Integrated Assessment Modeling of Grid Resilience: GCAM-to-PCM Scoping

Deep decarbonization towards a net-zero emissions future and the associated growth in power demand, renewables, and changes in water availability will require significant evolution in grid planning. Many obstacles threaten the viability of near-term generation capacity build out, including the need for large-scale transmission expansion. Current very-long term planning tools do not adequately model physical representations of economic dispatch and system topology down to inter- and intra-regional transmission and distribution infrastructure. This project attempts to fill that gap.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Power System Recovery Coordinated with (Non-)Black-Start Generators

Power restoration is an urgent task after a black-out, and recovery efficiency is critical when quantifying system resilience. Multiple elements should be considered to restore the power system quickly and safely. This paper proposes a recovery model to solve a direct-current optimal power flow (DCOPF) based on mixed-integer linear programming (MILP). Since most of the generators cannot start independently, the interaction between black-start (BS) and non-black-start (NBS) generators must be modeled appropriately. The energization status of the NBS is coordinated with the recovery status of transmission lines, and both of them are modeled as binary variables. Also, only after an NBS unit receives the cranking power through connected transmission lines, will it be allowed to participate in the following system dispatch. The amount of cranking power is estimated as a fixed proportion to the maximum generation capacity. The proposed model is validated on several test systems, as well as a 1393-bus representation system of the Puerto Rican electric power grid. Test results demonstrate how the recovery of NBS units and damaged transmission lines can be optimized, resulting in an efficient and well-coordinated recovery procedure.

Zhao, Meng↗

Electric Vehicle Infrastructure Consequence Assessment

With consumers’ growing interest in electric vehicles, extreme fast charging stations are poised to provide high-power charging to rapidly recharge light-duty passenger vehicles. High-power charging requires high-level communication between vehicle and charger to govern the charging process. The coupling of power and communication increases the potential scale of cyberattacks. Using a full Western Electricity Coordinating Council planning model, load manipulation from high-power charging infrastructure is investigated. Two cases of load manipulation are studied: (i) a discrete, widespread system event and (ii) loads modulated near the Western Interconnect’s resonant frequency. In (i) some generation trips and in (ii) oscillations are observed on the California Oregon Intertie. Neither scenario results in significant adverse effects to the grid.

33 ADVANCED PROPULSION SYSTEMS↗

Capacity Expansion Planning for LA Basin: the Role of Energy Storage

The paper evaluates the deployment of energy storage to support equitable energy outcomes and the clean energy transition in the Los Angeles Basin (LAB). The deployment of energy storage is considered in a 10 zone capacity expansion planning model from 2022-2045. The model is based on the California Public Utility Commission’s 7 zone RESOLVE model but has been modified to give greater spatial granularity in the LAB area by addig 3 new zones representing the Eastern Los Angeles, Western Los Angeles and the El Nido subzones. Three different scenarios are studied in this work; a base case with no natural gas retirements in the LAB, and two cases exploring extreme natural gas retirements, where the 8GW of natural gas belonging to the LAB are retired by 2045. Study results indicate that storage can play a significant role in helping the LAB meeting its energy requirements. However, when considering extreme retirement scenarios, either new generation (such as solar) or capacity (such as new import capacity via transmission lines) will likely be needed to serve projected system loads.

Maloney, Patrick R.↗