Engineering Papers⌕ Search

Engineering topics

Macneil, Peter N.

Publications and source records attributed to Macneil, Peter N..

Insulation For Cryogenic-Liquid Tanks

Rigid foam and radiation shields prevent excessive heating in variety of environments. Report discusses design, development, and test of thermal-protection system for liquid-oxygen and liquid-hydrogen tanks of now discontinued Shuttle/Centaur G' project. System protects tank from excessive heat before and during launches, while in orbit around Earth, and during premature landings from aborted launches. Designed to withstand stresses of launch and emergency landing, acoustical loads, rapid changes in pressure, and impingement of rapidly flowing gas near vents of cargo bay in Space Shuttle. Primary requirements in design, system presents no hazard to Space Shuttle or its crew.

Knoll, Richard H.↗

Design, development, and test of Shuttle/Centaur G-prime cryogenic tankage thermal protection systems

The thermal protection systems (TPS) for the Shuttle/Centaur were designed to provide fail-safe thermal protection during prelaunch, launch ascent, and on-orbit operations as well as during potential abort, where the Shuttle and Centaur would return to earth. The TPS selected used a helium-purged polyimide foam beneath three radiation shields for the liquid-hydrogen (LH2) tank and radiation shields only for the liquid-oxygen (LO2) tank. A double-walled vacuum bulkhead separated the two tanks. The LH2 tank had one 1.9 cm-thick layer of foam on the forward bulkhead and two layers on the larger-area sidewall. Full scale tests of the flight vehicle in a simulated Shuttle cargo bay gave total prelaunch heating rates of 29.5 and 12.9 kW for the LH2 and LO2 tanks, respectively. Calorimeter tests on a representative sample of the LH2 tank sidewall TPS indicated that the measured unit heating one would rapidly decrease from the prelaunch rate of about 300 W/sq m to a desired rate less than 4 W/sq m once on-orbit.

Macneil, Peter N.↗

Design, development and test of shuttle/Centaur G-prime cryogenic tankage thermal protection systems

The thermal protection systems for the shuttle/Centaur would have had to provide fail-safe thermal protection during prelaunch, launch ascent, and on-orbit operations as well as during potential abort. The thermal protection systems selected used a helium-purged polyimide foam beneath three rediation shields for the liquid-hydrogen tank and radiation shields only for the liquid-oxygen tank (three shields on the tank sidewall and four on the aft bulkhead). A double-walled vacuum bulkhead separated the two tanks. The liquid-hydrogen tank had one 0.75-in-thick layer of foam on the forward bulkhead and two layers on the larger area sidewall. Full scale tests of the flight vehicle in a simulated shuttle cargo bay that was purged with gaseous nitrogen gave total prelaunch heating rates of 88,500 Btu/hr and 44,000 Btu/hr for the liquid-hydrogen and -oxygen tanks, respectively. Calorimeter tests on a representative sample of the liquid-hydrogen tank sidewall thermal protection system indicated that the measured unit heating rate would rapidly decrease from the prelaunch rate of approx 100 Btu/hr/sq ft to a desired rate of less than 1.3 Btu/hr/sq ft once on orbit.

Knoll, Richard H.↗