Ma, Xu

Publications and source records attributed to Ma, Xu.

At least 19 records

Paired Hydro-Battery Hybrid System Operations Using MIQP Based Multi-Objective Optimization

Hybridizing a hydropower plant with a battery energy storage system is often a very expensive decision. So to make the case for feasibility of hybridization the cost benefit analysis must be comprehensive. Most literature found on this subject only uses one out of many different available value streams to carry out a feasibility analysis. To that end, in this study we propose a multi-objective optimization formulation and a mixed-integer quadratic programming optimization engine that considers multiple different value streams and optimizes hydro-battery hybrid system paired operations to maximize revenue generated from energy arbitrage while simultaneously minimizing the total hydro turbine mileage thus reducing turbine starts and stops and improving turbines life all while following all environmental constraints and not violating any limitations either regulatory or preferential (i.e., to support recreational activities like white water rafting, etc.). In this study we also implemented the developed optimization methodology to a real-world case study of Bagnell dam hydropower facility (8 units totaling 240 MW rated power capacity) which is owned and operated by our industry partner Ameren Energy Inc. The case study outcomes shows that by hybridizing the Bagnell dam hydropower facility with a 60 MW x 2-hr battery energy storage system, the annual benefits can be increased over \$6 million while reducing the annual mileage averaged per turbine and number of start/stops by over 98\% and 85\% respectively.

Chalishazar, Vishvas H.↗

Optimizing Grid-interactive Efficient Building Designs with Stacked Value Streams

Grid-interactive efficient buildings (GEBs) are those characterized by the combination of energy efficiency and demand flexibility with smart technologies and communications to not only deliver greater affordability and comfort to buildings, but also help utilities manage grid operations and lower system costs. This paper presents an innovative techno-economic assessment framework to effectively examine different GEB design options, explore various use cases, define technically achievable benefits, and thereby assist in informed decision-making. In particular, building load flexibility, thermal storage, and battery energy storage are considered. Advanced optimal dispatch problem is formulated to maximize the stacked value streams from multiple, competing use cases, subject to the physical capabilities and operational flexibility associated with different designs and configurations. Comprehensive case studies were performed for a real-world building to evaluate the cost-effectiveness of different GEB designs and offer in-depth insights. It was found that the proposed assessment method could effectively capture the costs and benefits linked to each GEB design option. Furthermore, the study revealed that outage mitigation and demand response are the two most significant sources of benefits for GEBs.

Ma, Xu↗

A hierarchical framework for aggregating grid-interactive buildings with thermal and battery energy storage

The behind-the-meter (BTM) thermal and battery energy storage can help improve energy efficiency, reduce energy costs, and enhance energy resilience, particularly in rural areas and for disadvantaged communities. Aggregating numerous BTM energy storage systems can act as a price influencer with a significant source of load shifting and peak demand reduction. An integrated and scalable control mechanism is required to effectively utilize energy storage systems and flexible building loads to maximize the economic benefits, considering various distribution system constraints. Here, this paper presents an innovative hierarchical coordination framework for energy storage and flexible load in buildings, considering various factors such as electricity prices, thermal comfort, and distribution system modeling and constraints. At the upper level, a distribution system operator optimizes the power flow to minimize its power procurement costs from the electricity wholesale market, while at the lower level, aggregators determine the optimal dispatch of battery and thermal energy storage systems in multiple buildings on behalf of end-users to minimize operating costs according to the power prices. These problems are solved using a game-theoretic approach through negotiations between the distribution system operator and aggregators as a bi-level decision model. Simulation case studies have been performed for a test distribution network with a number of building end-users using energy storage systems to quantify the performance of aggregators. The results demonstrate that the proposed strategy can reduce peak load for a reliable electricity distribution network while saving electricity bills for customers.

25 ENERGY STORAGE↗

Multi-objective sizing and dispatch for building thermal and battery storage towards economic and environmental synergy

The role of building thermal and battery storage is pivotal in advancing smart cities and achieving sustainability goals through effective energy management. Despite their significance, there are several limitations in the sizing approach and value stream analysis with various objectives for their widespread adoption in buildings. This work proposes a flexible and scalable multi-objective optimization framework for optimal sizing and dispatch of building thermal and battery storage, addressing conflicting objectives simultaneously using mixed-integer linear programming. The weighted-sum method is adapted, combining multiple objectives into a single function. The two-stage procedure iterates over different weights, generating optimal solutions and forming the Pareto front. Case studies are performed to assess the energy, economic, and environmental benefits of building energy storage systems for a large office building in three climate locations. The results demonstrate that the proposed framework efficiently determines optimal sizing and dispatch strategies, addressing the balance between economic viability and emission reduction. The dynamic relationship between time-of-use energy charges and emission factors leads to significantly different strategies based on whether economic or environmental concerns are prioritized. This research enhances our understanding of the benefits of TES and BES systems in buildings, providing valuable guidance to stakeholders.

25 ENERGY STORAGE↗

Enhancing Building Energy Efficiency through Advanced Sizing and Dispatch Methods for Energy Storage

Energy storage and electrification of buildings hold great potential for future decarbonization. However, there are several technical and economic barriers that prevent large-scale adoption and integration of energy storage in buildings. These barriers include integration with building control systems, high capital costs, and the necessity to identify and quantify value streams for different stakeholders. To overcome these obstacles, it is crucial to develop advanced sizing and dispatch methods to assist planning and operational decision-making for integrating energy storage in buildings. This work develops simple and flexible optimal sizing and dispatch framework for thermal energy storage (TES) and battery energy storage (BES) systems in large-scale office building. The optimal sizes of TES, BES, as well as other building assets are determined in a joint manner instead of sequentially to avoid sub-optimal solutions. The interaction between the sizing at the planning stage and hourly or sub-hourly dispatch at the operating stage is explicitly modeled. The solution is determined considering both capital costs in optimal sizing and operational benefits in optimal dispatch. Comprehensive assessments are performed using simulation studies to quantify potential energy, economic, and emission benefits by different utility tariffs and climate locations, to improve our understanding of the techno-economic performance of different TES and BES systems, and to identify barriers for adopting energy storage for buildings. Finally, the proposed framework will provide guidance to a broad range of stakeholders to properly design energy storage in buildings and maximizes potential benefits, thereby advancing affordable building energy storage deployment and helping us accelerating the transition towards a cleaner and more equitable energy economy.

Yu, Mingyung↗

New Tool Evaluates the Financial Viability of Pumped Storage Hydropower

The rapidly evolving electricity system with increasing variable renewable energy (VRE) resources provides both opportunities and challenges for the power sector. With the significant ramps and intermittency associated with VRE resources, the requirements and need for additional flexible resources increase. Pumped storage hydropower (PSH) provides flexibility to the electricity grid to replace fossil fuel plants, which are responsible for 25% of U.S. emissions. PSH projects support various aspects of power system operations, including flexibility, ramping capability, energy, ancillary service, black start, and others. The significant potential of hydropower requires understanding the different value drivers to the electricity system specific to the location of a project and then optimizing the plant for the different system values. Thus, determining the value of PSH projects and their many services and contributions to the electricity system can be a challenge for potential developers, system owners, regulators, policy makers, and consultants.

13 HYDRO ENERGY↗

A Multi-objective Microgrid Assessment and Sizing Framework for Economic and Resilience Benefits

This paper presents an innovative multi-objective assessment and sizing framework for battery energy storage system paired with photovoltaics for a cost-effective and resilient microgrid. In the proposed framework, we simultaneously consider i) economic benefits from bundling grid services in grid-connected mode and ii) enhanced resilience by operating the microgrid in island mode upon outages of the main grid. Instead of simply treating resilience as another monetary value stream, this paper models resilience and economic benefits as two separate objectives. Multi-objective optimization is developed to explore different sizing and dispatch options and generate the Pareto front to assist decision-making in system design. Case studies on a real-world microgrid project in Puget Sound Energy system are presented to illustrate the proposed modeling and sizing methods.

Battery energy storage, Microgrid, Optimal Sizingp↗

Energy Northwest — Advanced Grid Interactive Load Efficiency (AGILE) : A Techno-economic Assessment

The Advanced Grid Interactive Load Efficiency project team, led by Energy Northwest, was awarded funding as part of the fourth round of the Clean Energy Fund program to investigate, co-create, and complete a preliminary design for grid-interactive efficient buildings (GEBs) for a number of schools served by Grays Harbor PUD. The project team has evaluated different combinations of systems at selected school buildings and the potential to respond to grid and customer needs, and develop a preliminary system technical design, including specifying desired GEB technology options, determining communication and electrical interface requirements, assessing control software sensor requirements, and interfacing with building management systems. PNNL led the techno-economic assessment efforts, leveraging its advanced modeling and analytical methods and tools developed for building-to-grid integration. This report documents the economic assessment for different GEB design options, encompassing an in-depth examination of use cases and value propositions, assumptions and inputs, models, methods, case studies, as well as key findings.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Stochastic scheduling for commercial building cooling systems: considering uncertainty in zone temperature prediction

Here, this paper presents the first attempt to address the uncertainty in zone temperature prediction with stochastic optimization. The uncertain zone temperature is a process uncertainty and has not been considered in the existing stochastic optimization for building control. To fill this gap, we proposed a novel formulation of stochastic optimization to handle process uncertainty in building control. Specifically, we first examined the accuracy of a typical linear model for predicting zone temperature. We then formulated the scheduling of the building cooling system as a stochastic optimization problem over a 24-hour look-ahead period to minimize the electricity cost of the studied building cooling system. After that, we applied the proposed stochastic load scheduling (SLS) to a direct expansion (DX) cooling system that serves a medium office building. Through simulation with a detailed building energy simulation software, EnergyPlus, we evaluated the operational cost and the thermal comfort compared with a deterministic load scheduling. The operation cost of scheduling was found to vary with the level of zone temperature prediction uncertainty. The proposed SLS can mitigate the impacts of uncertain zone temperature predictions on both operational cost and thermal comfort. The evaluation results indicate that the proposed SLS works better when the uncertainty level is more significant.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Incorporating Operational Uncertainties into the Dispatch of an Integrated Solar and Storage System

The economic assessment of hybrid energy systems (HES) pairing battery energy storage systems (BESSs) and photovoltaics (PV) is highly important for advancing their deployment in power systems. This paper presents an innovative assessment framework, including an optimal control policy for dispatch under uncertainty and procedures for exploring control parameters that maximize economic benefits. The proposed dispatch policy consists of two steps using system forecast information. The first step is to determine whether a BESS will be used within an operational scheduling time frame based on the probability of events and their thresholds. Once the dispatch of BESS is triggered, a model predictive control (MPC) is carried out in the second step for scheduling using the expected value of system information. By exercising this policy with different thresholds, one can explore the trade-offs between short-term benefits and battery lifetime, and identify an optimal threshold that maximizes the total economic benefits within the battery lifetime. An evaluation study in a real-world HES project is presented to illustrate the proposed framework. Compared with traditional optimal dispatch algorithms, the proposed method can significantly improve the economic benefits of an HES scheduled under forecast uncertainties.

Ma, Xu↗

Optimal Sizing and Operation of a Hybrid Clean Energy Center

In this paper, we consider the deployment of battery energy storage systems (BESSs) paired with photovoltaics (PV) to form a hybrid clean energy center (HCEC), where the BESS is equipped for two main purposes: i) reducing the volatility of PV output and ii) shifting energy to meet an export limit. We develop a linear dynamical model to characterize the output of an HCEC and express the volatility and export power as functions of the battery's dispatch operations. We also propose an optimal sizing method via second-order cone programming (SOCP) to maximize the net benefits of the HCEC. Numerical studies are performed to illustrate and validate the proposed method.

Battery energy storage systems, photovoltaics, sec↗

Simulation-based assessment on stochastic load scheduling for building cooling systems

Here, to fill knowledge gaps related to stochastic load scheduling, we performed a comprehensive evaluation of the stochastic load scheduling for building cooling systems. Specifically, we studied the common uncertain variables in the load scheduling process for building cooling systems and categorized those variables based on their dynamic patterns. We then developed a generic stochastic load scheduling framework and applied it to building cooling systems that served a simulated community. This community consists of 100 heterogeneous houses and serves as a virtual testbed for evaluating the performance of stochastic load scheduling. In this evaluation, we considered representatives of uncertain variables with different dynamic patterns and included 100 realizations of the considered uncertainty in the evaluation to better catch the probability distribution of the control performance. The evaluation results suggest that deterministic load scheduling can reduce the operating energy cost by 18% but its performance can be affected by uncertainty. Stochastic load scheduling can further decrease the operating energy cost under uncertainty compared to deterministic load scheduling. We also found that the effectiveness of stochastic load scheduling in handling uncertainty is not directly associated with the number of uncertainty scenarios that are considered in its formulation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Predicting peak day and peak hour of electricity demand with ensemble machine learning

Battery energy storage systems can be used for peak demand reduction in power systems, leading to significant economic benefits. Two practical challenges are 1) accurately determining the peak load days and hours and 2) quantifying and reducing uncertainties associated with the forecast in probabilistic risk measures for dispatch decision-making. In this study, we develop a supervised machine learning approach to generate 1) the probability of the next operation day containing the peak hour of the month and 2) the probability of an hour to be the peak hour of the day. Guidance is provided on preparation and augmentation of data as well as selection of machine learning models and decision-making thresholds. The proposed approach is applied to the Duke Energy Progress system and successfully captures 69 peak days out of 72 testing months with a 3% exceedance probability threshold. On 90% of the peak days, the actual peak hour is among the 2 h with the highest probabilities.

25 ENERGY STORAGE↗

Energy Northwest – Horn Rapids Solar and Storage: A Techno-economic Assessment

In 2017, as part of the second round of funding from the Washington State Clean Energy Fund, the Washington State Department of Commerce granted up to $\$3$ million in matching funds to develop an estimated $6.5 million project that deployed a 4-MW, 20-acre solar generating array of photovoltaic (PV) panels coupled with a 1 MW/4 MWh (nameplate capacity) lithium-iron-phosphate battery energy storage system (BESS) in Richland, Washington. The combination of PV and BESS will provide a predictable, renewable generating source and will also serve as a training ground for solar and battery technicians throughout the nation. This report documents the techno-economic assessment of the integrated system, including the definition of use cases and applications, collection and preparation of data and input parameters, development of modeling and optimization methods, case studies, and analysis results.

14 SOLAR ENERGY↗

Avista’s Shared Energy Economy Model Pilot: A Techno-economic Assessment

As part of the second round of the Washington Clean Energy Fund, Avista Corp received a $3.5 million matching grant in support of a shared energy economy project to test the integration of energy assets–from rooftop solar and battery storage to building energy management systems–that can be shared and used for multiple purposes. The goal of this project is to demonstrate how both the customer and the utility can benefit from this shared energy economy model and demonstrate that the electric grid can become more reliable, efficient, resilient, and flexible. Pacific Northwest National Laboratory was engaged by the U.S. Department of Energy and the Washington State Department of Commerce to work with Avista in assessing the benefits of the shared energy economy model. This report documents the techno-economic assessment of the shared energy economy model, including the definition of use cases and applications, collection and preparation of data and input parameters, development of modeling and optimization methods, and case studies and analysis results.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Storage Valuation: A Review of Use Cases and Modeling Tools

An enticing prospect that drives adoption of energy storage systems (ESS) is its ability to be used in a diverse set of use cases and the potential to take advantage of multiple unique value streams. The Energy Storage Grand Challenge (ESGC) technology development pathways for storage technologies draw from a set of use cases in the electrical power system, each with their own specific cost and performance needs. In addition to the need for cost and performance improvements for storage technologies, there a need for robust valuation methods to enable effective policy, investment, business models, and resource planning. There are numerous storage valuation tools available to the public, many of which can analyze the value of an ESS project with inputs and characteristics that reflect a specific storage use case. To effectively reach ESS stakeholders that may be interested in learning about valuation models, this report will draw from publicly available tools developed by the Department of Energy (DOE) and frame their functionalities and capabilities within the context of three distinct use case families. This report examines three of the ESGC use case families in depth and provides a methodology in which interested stakeholders can determine which DOE modeling tool is best suited to value ESS for their specific case. The high-level objectives for this report include: (1) Provide specific sub use-cases for each use case family for further characterization; (2) Provide technical parameters and relevant data for three example use cases that could be used in a valuation tool; (3) Identify a list of publicly available DOE tools that can provide energy storage valuation insights for ESS use case stakeholders; (4) Provide information on the capabilities and different options in each modeling tool; (5) Make conclusions on which are best suited for valuing certain functional/performance requirements and which tools might be applicable to other use cases; and (6) Show the methodology that informs a Model Selection Platform (MSP) framework that educates stakeholders on different DOE models and provides a streamlined way to choose the right model that most closely matches their needs.

25 ENERGY STORAGE↗