Engineering Papers⌕ Search

Engineering topics

Lu, Shuai

Publications and source records attributed to Lu, Shuai.

At least 55 records · Page 3

Integration of Uncertainty Information into Power System Operations

Contemporary power systems face uncertainties coming from multiple sources, including forecast errors of load, wind and solar generation, uninstructed deviation and forced outage of traditional generators, loss of transmission lines, and others. With increasing amounts of wind and solar generation being integrated into the system, these uncertainties have been growing significantly. It is critical important to build knowledge of major sources of uncertainty, learn how to simulate them, and then incorporate this information into the decision-making processes and power system operations, for better reliability and efficiency. This paper gives a comprehensive view on the sources of uncertainty in power systems, important characteristics, available models, and ways of their integration into system operations. It is primarily based on previous works conducted at the Pacific Northwest National Laboratory (PNNL).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Calibration of Reduced Dynamic Models of Power Systems using Phasor Measurement Unit (PMU) Data

Accuracy of a power system dynamic model is essential to the secure and efficient operation of the system. Lower confidence on model accuracy usually leads to conservative operation and lowers asset usage. To improve model accuracy, identification algorithms have been developed to calibrate parameters of individual components using measurement data from staged tests. To facilitate online dynamic studies for large power system interconnections, this paper proposes a model reduction and calibration approach using phasor measurement unit (PMU) data. First, a model reduction method is used to reduce the number of dynamic components. Then, a calibration algorithm is developed to estimate parameters of the reduced model. This approach will help to maintain an accurate dynamic model suitable for online dynamic studies. The performance of the proposed method is verified through simulation studies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Load Modeling and Calibration Techniques for Power System Studies

Load modeling is the most uncertain area in power system simulations. Having an accurate load model is important for power system planning and operation. Here, a review of load modeling and calibration techniques is given. This paper is not comprehensive, but covers some of the techniques most commonly found in the literature. The advantages and disadvantages of each technique are outlined.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Large-Scale PV Integration Study

This research effort evaluates the impact of large-scale photovoltaic (PV) and distributed generation (DG) output on NV Energy’s electric grid system in southern Nevada. It analyzes the ability of NV Energy’s generation to accommodate increasing amounts of utility-scale PV and DG, and the resulting cost of integrating variable renewable resources. The study was jointly funded by the United States Department of Energy and NV Energy, and conducted by a project team comprised of industry experts and research scientists from Navigant Consulting Inc., Sandia National Laboratories, Pacific Northwest National Laboratory and NV Energy.

14 SOLAR ENERGY↗

NV Energy Solar Integration Study: Cycling and Movements of Conventional Generators for Balancing Services

With an increasing penetration level of solar power in the southern Nevada system, the impact of solar on system operations needs to be carefully studied from various perspectives. Qualitatively, it is expected that the balancing requirements to compensate for solar power variability will be larger in magnitude; meanwhile, generators providing load following and regulation services will be moved up or down more frequently. One of the most important tasks is to quantitatively evaluate the cycling and movements of conventional generators with solar power at different penetration levels. This study is focused on developing effective methodologies for this goal and providing a basis for evaluating the wear and tear of the conventional generators

14 SOLAR ENERGY↗

Centralized and Decentralized Control for Demand Response

Demand response has been recognized as an essential element of the smart grid. Frequency response, regulation and contingency reserve functions performed traditionally by generation resources are now starting to involve demand side resources. Additional benefits from demand response include peak reduction and load shifting, which will defer new infrastructure investment and improve generator operation efficiency. Technical approaches designed to realize these functionalities can be categorized into centralized control and decentralized control, depending on where the response decision is made. This paper discusses these two control philosophies and compares their relative advantages and disadvantages in terms of delay time, predictability, complexity, and reliability. A distribution system model with detailed household loads and controls is built to demonstrate the characteristics of the two approaches. The conclusion is that the promptness and reliability of decentralized control should be combined with the predictability and simplicity of centralized control to achieve the best performance of the smart grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Low Probability Tail Event Analysis and Mitigation in the BPA Control Area

This report investigated the uncertainties with the operations of the power system and their contributions to tail events, especially under high penetration of wind. A Bayesian network model is established to quantify the impact of these uncertainties on system imbalance. The framework is presented for a decision support tool, which can help system operators better estimate the need for balancing reserves and prepare for tail events.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Unit Commitment Considering Generation Flexibility and Environmental Constraints

This paper proposes a new framework for power system unit commitment process, which incorporates the generation flexibility requirements and environmental constraints into the existing unit commitment algorithm. The generation flexibility requirements are to address the uncertainties with large amount of intermittent resources as well as with load and traditional generators, which causes real-time balancing requirements to be variable and less predictable. The proposed flexibility requirements include capacity, ramp and ramp duration for both upward and downward balancing reserves. The environmental constraints include emission allowance for fossil fuel-based generators and ecological regulations for hydro power plants. Calculation of emission rates is formulated. Unit commitment under this new framework will be critical to the economic and reliable operation of the power grid and the minimization of its negative environmental impacts, especially when high penetration levels of intermittent resources are being approached, as required by the renewable portfolio standards in many states.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Prediction of Power System Balancing Requirement and Tail Event

This paper presents a methodology for the prediction of power system balancing requirement and the probability of tail event (large imbalance between generation and load). Maintaining sufficient balancing reserves to match the difference between hourly generation schedule and real-time variable load and intermittent resources, becomes more and more challenging with the increasing penetration of intermittent energy sources. The presented methodology uses a yearly distribution and an hourly distribution of balancing requirement and tail events to provide a high level look at the issue and warn system operators of those hours when problems are most likely to occur. For real-time prediction, a Bayes Net model is constructed to model the statistical relationships between system imbalance and forecast errors, generation schedule control errors and other influential factors. The methodology will be able to provide reference information to system operators in determining the sufficiency of system balancing reserve and taking appropriate control actions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Wide Area Security Region Final Report

This report develops innovative and efficient methodologies and practical procedures to determine the wide-area security region of a power system, which take into consideration all types of system constraints including thermal, voltage, voltage stability, transient and potentially oscillatory stability limits in the system. The approach expands the idea of transmission system nomograms to a multidimensional case, involving multiple system limits and parameters such as transmission path constraints, zonal generation or load, etc., considered concurrently. The security region boundary is represented using its piecewise approximation with the help of linear inequalities (so called hyperplanes) in a multi-dimensional space, consisting of system parameters that are critical for security analyses. The goal of this approximation is to find a minimum set of hyperplanes that describe the boundary with a given accuracy. Methodologies are also developed to use the security hyperplanes, pre-calculated offline, to determine system security margins in real-time system operations, to identify weak elements in the system, and to calculate key contributing factors and sensitivities to determine the best system controls in real time and to assist in developing remedial actions and transmission system enhancements offline . A prototype program that automates the simulation procedures used to build the set of security hyperplanes has also been developed. The program makes it convenient to update the set of security hyperplanes necessitated by changes in system configurations. A prototype operational tool that uses the security hyperplanes to assess security margins and to calculate optimal control directions in real time has been built to demonstrate the project success. Numerical simulations have been conducted using the full-size Western Electricity Coordinating Council (WECC) system model, and they clearly demonstrated the feasibility and the effectiveness of the developed technology. Recommendations for the future work have also been formulated.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Wide-Area Energy Storage and Management System to Balance Intermittent Resources in the Bonneville Power Administration and California ISO Control Areas

The project described in the paper addresses the issue of mitigating additional intermittency and fast ramps that will occur at higher penetration levels of intermittent resources, including wind generation resources, in the Bonneville Power Administration (BPA) and the California Independent System Operator (CAISO) areas. The proposed Wide Area Energy Management System (WAEMS) addresses these additional balancing requirements through energy exchange between the participating control areas and through the use of energy stor-age and other generation resources. For the BPA and CAISO control centers, the new regulation service will look no different comparing with the traditional balancing services. The work conducted developed principles, algorithms, mar-ket integration rules, functional de-sign and technical specifica-tions for the WAEMS system. Main results obtained in the project are as follow: •Most suitable energy storage technologies for the pro-posed application include flywheel energy storage devices (ESD), pumped or conventional hydro power plants, and so-dium sulfur or nickel cadmium batteries. •A preferred WAEMS architecture was selected as an ag-gregate of a flywheel ESD and a pumped storage (or a con-ventional hydro plant). The aggregate to be integrated with BPA/CAISO automatic generation control systems. •An optimization control algorithm has been developed. It provides an excellent regulation signal following capability, helps to maintain a desired state of charge on the ESD, pre-vent violations, and keep the hydro (pumped storage) power output close to the most efficient operating point. •It has been shown that the WAEMS service could help to reduce the regulation requirement in BPA and CAISO con-trol areas by about 30% compared to a traditional regulation service with the same total regulation capacity.

Energy Management System↗

Low Probability Tail Event Analysis and Mitigation in BPA Control Area: Task 2 Report

Task report detailing low probability tail event analysis and mitigation in BPA control area. Tail event refers to the situation in a power system when unfavorable forecast errors of load and wind are superposed onto fast load and wind ramps, or non-wind generators falling short of scheduled output, causing the imbalance between generation and load to become very significant.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Low Probability Tail Event Analysis and Mitigation in BPA Control Area: Task One Report

This is a report for task one of the tail event analysis project for BPA. Tail event refers to the situation in a power system when unfavorable forecast errors of load and wind are superposed onto fast load and wind ramps, or non-wind generators falling short of scheduled output, the imbalance between generation and load becomes very significant. This type of events occurs infrequently and appears on the tails of the distribution of system power imbalance; therefore, is referred to as tail events. This report analyzes what happened during the Electric Reliability Council of Texas (ERCOT) reliability event on February 26, 2008, which was widely reported because of the involvement of wind generation. The objective is to identify sources of the problem, solutions to it and potential improvements that can be made to the system. Lessons learned from the analysis include the following: (1) Large mismatch between generation and load can be caused by load forecast error, wind forecast error and generation scheduling control error on traditional generators, or a combination of all of the above; (2) The capability of system balancing resources should be evaluated both in capacity (MW) and in ramp rate (MW/min), and be procured accordingly to meet both requirements. The resources need to be able to cover a range corresponding to the variability of load and wind in the system, additional to other uncertainties; (3) Unexpected ramps caused by load and wind can both become the cause leading to serious issues; (4) A look-ahead tool evaluating system balancing requirement during real-time operations and comparing that with available system resources should be very helpful to system operators in predicting the forthcoming of similar events and planning ahead; and (5) Demand response (only load reduction in ERCOT event) can effectively reduce load-generation mismatch and terminate frequency deviation in an emergency situation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Operational Impacts of Wind Energy Resources in the Bonneville Power Administration Control Area - Phase I Report

This report presents a methodology developed to study the future impact of wind on BPA power system load following and regulation requirements. The methodology uses historical data and stochastic processes to simulate the load balancing processes in the BPA power system, by mimicking the actual power system operations. Therefore, the results are close to reality, yet the study based on this methodology is convenient to conduct. Compared with the proposed methodology, existing methodologies for doing similar analysis include dispatch model simulation and standard deviation evaluation on load and wind data. Dispatch model simulation is constrained by the design of the dispatch program, and standard deviation evaluation is artificial in separating the load following and regulation requirements, both of which usually do not reflect actual operational practice. The methodology used in this study provides not only capacity requirement information, it also analyzes the ramp rate requirements for system load following and regulation processes. The ramp rate data can be used to evaluate generator response/maneuverability requirements, which is another necessary capability of the generation fleet for the smooth integration of wind energy. The study results are presented in an innovative way such that the increased generation capacity or ramp requirements are compared for two different years, across 24 hours a day. Therefore, the impact of different levels of wind energy on generation requirements at different times can be easily visualized.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Future Impact of Wind on BPA Power System Ancillary Services

Wind power is growing in a very fast pace as an alternative generating resource. As the ratio of wind power over total system capacity increases, the impact of wind on various system aspects becomes significant. This paper presents a methodology to study the future impact of wind on BPA power system ancillary services including load following and regulation. Existing approaches for similar analysis include dispatch model simulation and standard deviation evaluation. The methodology proposed in this paper uses historical data and stochastic processes to simulate the load balancing processes in BPA power system. Then capacity, ramp rate and ramp duration characteristics are extracted from the simulation results, and load following and regulation requirements are calculated accordingly. It mimics the actual power system operations therefore the results can be more realistic yet the approach is convenient to perform. Further, the ramp rate and ramp duration data obtained from the analysis can be used to evaluate generator response or maneuverability and energy requirement, respectively, additional to the capacity requirement.

17 WIND ENERGY↗

Wide-Area Energy Storage and Management system to Balance Intermittent Resources in the Bonneville Power Administration and California ISO Control Areas

The entire project addresses the issue of mitigating additional intermittency and fast ramps that occur at higher penetration of intermittent resources, including wind genera-tion, in the Bonneville Power Administration (BPA) and the California Independent Sys-tem Operator (California ISO) control areas. The proposed Wide Area Energy Storage and Management System (WAEMS) will address the additional regulation requirement through the energy exchange between the participating control areas and through the use of energy storage and other generation resources. For the BPA and California ISO control centers, the new regulation service will look no different comparing with the traditional regulation resources. The proposed project will benefit the regulation service in these service areas, regardless of the actual degree of penetration of the intermittent resources in the regions. The project develops principles, algorithms, market integration rules, functional de-sign and technical specifications for the WAEMS system. The project is sponsored by BPA and supported in kind by California ISO, Beacon Power Corporation, and the Cali-fornia Energy Commission (CEC).

25 ENERGY STORAGE↗

Scoping Study for Demand Respose DFT II Project in Morgantown, WV

This scoping study describes the underlying data resources and an analysis tool for a demand response assessment specifically tailored toward the needs of the Modern Grid Initiatives Demonstration Field Test in Phase II in Morgantown, WV. To develop demand response strategies as part of more general distribution automation, automated islanding and feeder reconfiguration schemes, an assessment of the demand response resource potential is required. This report provides the data for the resource assessment for residential customers and describes a tool that allows the analyst to estimate demand response in kW for each hour of the day, by end-use, season, day type (weekday versus weekend) with specific saturation rates of residential appliances valid for the Morgantown, WV area.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Assessing the Value of Regulation Resources Based on Their Time Response Characteristics

Fast responsive regulation resources are potentially more valuable as a power system regulation resource (more efficient) because they allow applying controls at the exact moment and in the exact amount as needed. Faster control is desirable because it facilitates more reliable compliance with the NERC Control Performance Standards at relatively lesser regulation capacity procurements. The current California ISO practices and markets do not provide a differentiation among the regulation resources based on their speed of response (with the exception of some minimum ramping capabilities). Some demand response technologies, including some generation and energy storage resources, can provide quicker control actions. California ISO practices and markets could be updated to welcome more fast regulation resources into the California ISO service area. The project work reported in this work was pursuing the following objectives: • Develop methodology to assess the relative value of generation resources used for regulation and load following California ISO functions • This assessment should be done based on physical characteristics including the ability to quickly change their output following California ISO signals • Evaluate what power is worth on different time scales • Analyze the benefits of new regulation resources to provide effective compliance with the mandatory NERC Control Performance Standards • Evaluate impacts of the newly proposed BAAL and FRR standards on the potential value of fast regulation and distributed regulation resources • Develop a scope for the follow-up projects to pave a road for the new efficient types of balancing resources in California. The work included the following studies: • Analysis of California ISO regulating units characteristics • California ISO automatic generation system (AGC) analysis • California ISO regulation procurement and market analysis • Fast regulation efficiency analysis • Projection of the California ISO load following and regulation requirements into the future • Value of fast responsive resources depending on their ramping capability • Potential impacts of the balancing authority area control error limit (BAAL), which is a part of the newly proposed NERC standard “Balancing Resources and Demand” • Potential impacts of the Western Electricity Coordinating Council (WECC) frequency responsive reserve (FRR) standard • Recommendations for the next phase of the project. The following main conclusions and suggestions for the future have been made: • The analysis of regulation ramping requirements shows that the regulation system should be able to provide ramps of at least 40-60 MW per minute for a period up to 6 minutes. • Evaluate if changes are needed in the California ISO AGC system to effectively accommodate new types of fast regulation resources and minimize the California ISO regulation procurement. • California ISO may consider creating better market opportunities for and incentives for fast responsive resources. • An additional study of low probability high ramp events can be recommended to the California ISO. • The California ISO may be willing to consider establishing a more relaxed target CPS2 compliance level. • A BAAL-related study can be recommended for the California ISO as soon as more clarity is achieved concerning the actual enforcement of the BAAL standard and its numerical values for the California ISO. The study may involve an assessment of advantages of the distributed frequency-based control for the California ISO system. The market-related issues that arise in this connection can be also investigated. • A FRR-related study can be recommended for the California ISO as soon as more clarity is achieved concerning the actual enforcement of the FRR standard and its numerical values for the California ISO.

24 POWER TRANSMISSION AND DISTRIBUTION↗