Adapting Project Management Practices to Research-Based Projects
From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.
Current ISS Exercise Countermeasures: Where are we now?
Current International Space Station (ISS) crew schedules include 1.5 h/d for completion of resistive exercise and 1 h/d of aerobic exercise , 6 d/wk. While ISS post flight decrements in muscle strength, bone m ineral density, and aerobic capacity improved in some crewmembers, de conditioning was still evident even with this volume of exercise. Res ults from early ISS expeditions show maximum loss in bone mineral density of the lumbar spine and pelvis in excess of 1.5% per month, with all crewmembers demonstrating significant bone loss in one or more re gions. Similarly, post flight muscle strength losses in the hamstring and quadriceps muscle groups exceeded 30% in the immediate post miss ion period in some crewmembers. Measures of aerobic capacity early in the mission show average decrements of 15%, but with onboard aerobic exercise capability, the crew has been able to "train up" over the co urse of the mission. These findings are highly variable among crewmem bers and appear to be correlated with availability and reliability of the inflight resistive exercise device (RED), cycle ergometer, and t readmill. This suite of hardware was installed on ISS with limited op erational evaluation in groundbased test beds. As a result, onorbit hardware constraints have resulted in inadequate physical stimulus, d econditioning, and increased risk for compromised performance during intra and extravehicular activities. These issues indicate that the c urrent ISS Countermeasures System reliability or validity are not ade quate for extendedduration exploration missions. Learning Objective: A better understanding of the status of ISS exercise countermeasures , their ability to protect physiologic systems, and recommendations for exploration exercise countermeasures.
Mars Surface Analog Project: Preparing for Astronauts' First Hours on Mars
Astronaut missions to Mars may be decades in the future, but contemporary estimates of the physical capabilities of the crewmembers upon arrival after prolonged transit can guide development of operational requirements to be imposed on them. Requirements for functional capacities will differ depending on whether they land in a spartan ascent vehicle or in a well-equipped habitat, but each of those options brings with it certain operational risks. Rehabilitation will be an important factor for crew health, safety and efficiency after the multi-month transit from Earth. Specific recommendations will be stipulated for the time to be allotted for on-planet rehabilitation before the first planned surface excursion, such as the transfer from the ascent-lander to the habitat-lander. Three sequential workshops (the third including extramural experts in appropriate fields) examined the likely capabilities of crewmembers shortly after landing on Mars, the predicted operational requirements they will face, and the near-term steps to close the gap between the requirements and capabilities.