TOPEX Radar Altimeter Engineering Assessment Report Final Update-Side B Turn-On to End-of-Mission on October 9, 2005
This is the thirteenth and final report in a series of TOPEX Radar Altimeter Engineering Assessment Reports. The initial TOPEX Radar Altimeter Engineering Assessment Report, in February 1994, presented performance results for the NASA Radar Altimeter on the TOPEX/POSEIDON spacecraft, from its launch in August 1992 to February 1994. Since the time of that initial report and prior to this report, there have been eleven interim supplemental Engineering Assessment Reports, issued in March 1995, May 1996, March 1997, June 1998, August 1999, September 2000, June 2001, March 2002, May 2003, April 2004 and September 2005. The sixth supplement in September 2000 was the first assessment report that addressed Side B performance, and presented the altimeter performance from Side B turn-on until the end of calendar year 1999. This report extends the performance assessment of Side B to the final collection of data on October 9, 2005, and includes the performance assessment of Jason-1, the TOPEX follow-on mission, launched on December 7, 2001. This report provides some comparisons of Side A and Side B performance.