Engineering Papers⌕ Search

Engineering topics

Lewis, John F.

Publications and source records attributed to Lewis, John F..

31 records · Page 2

Project Orion, Environmental Control and Life Support System Integrated Studies

Orion is the next vehicle for human space travel. Humans will be sustained in space by the Orion subystem, environmental control and life support (ECLS). The ECLS concept at the subsystem level is outlined by function and technology. In the past two years, the interface definition with other subsystems has increased through different integrated studies. The paper presents the key requirements and discusses three recent studies (e.g., unpressurized cargo) along with the respective impacts on the ECLS design moving forward.

Russell, James F.↗

Boeing Crew Exploration Vehicle Environmental Control and Life Support System Architecture Overview

The Boeing Company under the teaming agreement with the Northrop Grumman Systems Corporation and in compliance with the NASA Phase 1 contract, had the responsibilities for the CEV architecture development of the Environmental control and life support (ECLS) system under the NASA Phase 1 contract. The ECLS system was comprised of the various subsystems which provided for a shirt-sleeve habitable environment for crew to live and work in the crew module of the CEV. This architecture met the NASA requirements to ferry cargo and crew to ISS, and Lunar sortie missions, with extensibility to long duration missions to Moon and MARS. This paper provides a summary overview of the CEV ECLS subsystems which was proposed in compliance with the contract activities.

Saiidi, Mo↗

Crew Exploration Vehicle Environmental Control and Life Support Design Reference Missions

In preparation for the contract award of the Crew Exploration Vehicle (CEV), the National Aeronautics and Space Administration (NASA) produced two design reference missions for the vehicle. The design references used teams of engineers across the agency to come up with two configurations. This process helped NASA understand the conflicts and limitations in the CEV design, and investigate options to solve them.

Lewis, John F.↗

Crew Exploration Vehicle Environmental Control and Life Support Development Status

The Crew Exploration Vehicle (CEV) is the first crew transport vehicle to be developed by the National Aeronautics and Space Administration (NASA) in the last thirty years. The CEV is being developed to transport the crew safely from the Earth to the Moon and back again. This year, the prime contractor has been selected, requirements have been refined, and development areas are being pursued. The Environmental Control and Life Support (ECLS) system, which includes the life support and active thermal control systems, is moving one year closer to performing on orbit.

Lewis, John F.↗

Crew Exploration Vehicle Environmental Control and Life Support Emergency Gas Consumable Sizing

As part of preparing for the Crew Exploration Vehicle (CEV), the National Aeronautics and Space Administration (NASA) worked on developing the requirements that drive the emergency gas consumables. Emergency gas is required to support Extravehicular Activities (EVA), maintain the cabin pressure during a cabin leak for the crew to don their suits, and to recover the cabin following a toxic even or a fire.

Lewis, John F.↗

Crew Exploration Vehicle Environmental Control and Life Support Fire Protection Approach

As part of preparing for the Crew Exploration Vehicle (CEV), the National Aeronautics and Space Administration (NASA) worked on developing the requirements to manage the fire risk. The new CEV poses unique challenges to current fire protection systems. The size and configuration of the vehicle resembles the Apollo capsule instead of the current Space Shuttle or the International Space Station. The smaller free air volume and fully cold plated avionic bays of the CEV requires a different approach in fire protection than the ones currently utilized. The fire protection approach discussed in this paper incorporates historical lessons learned and fire detection and suppression system design philosophy spanning from Apollo to the International Space Station. Working with NASA fire and materials experts, this approach outlines the best requirements for both the closed out area of the vehicle, such as the avionics bay, and the crew cabin area to address the unique challenges due to the size and configuration of the CEV.

Lewis, John F.↗

Design and Certification of the Extravehicular Activity Mobility Unit (EMU) Water Processing Jumper

The Extravehicular Mobility Units (EMUs) onboard the International Space Station (ISS) experienced a failure due to cooling water contamination from biomass and corrosion byproducts forming solids around the EMU pump rotor. The coolant had no biocide and a low pH which induced biofilm growth and corrosion precipitates, respectively. NASA JSC was tasked with building hardware to clean the ionic, organic, and particulate load from the EMU coolant loop before and after Extravehicular Activity (EVAs). Based on a return sample of the EMU coolant loop, the chemical load was well understood, but there was not sufficient volume of the returned sample to analyze particulates. Through work with EMU specialists, chemists, (EVA) Mission Operations Directorate (MOD) representation, safety and mission assurance, astronaut crew, and team engineers, requirements were developed for the EMU Water Processing hardware (sometimes referred to as the Airlock Coolant Loop Recovery [A/L CLR] system). Those requirements ranged from the operable level of ionic, organic, and particulate load, interfaces to the EMU, maximum cycle time, operating pressure drop, flow rate, and temperature, leakage rates, and biocide levels for storage. Design work began in February 2005 and certification was completed in April 2005 to support a return to flight launch date of May 12, 2005. This paper will discuss the details of the design and certification of the EMU Water Processing hardware and its components

Peterson, Laurie J.↗

Extravehicular Mobility Unit (EMU) / International Space Station (ISS) Coolant Loop Failure and Recovery

Following the Colombia accident, the Extravehicular Mobility Units (EMU) onboard ISS were unused for several months. Upon startup, the units experienced a failure in the coolant system. This failure resulted in the loss of Extravehicular Activity (EVA) capability from the US segment of ISS. With limited on-orbit evidence, a team of chemists, engineers, metallurgists, and microbiologists were able to identify the cause of the failure and develop recovery hardware and procedures. As a result of this work, the ISS crew regained the capability to perform EVAs from the US segment of the ISS.

Lewis, John F.↗

Crew Exploration Vehicle Environmental Control and Life Support Development Status

The Crew Exploration Vehicle (CEV) is the first crew transport vehicle to be developed by the National Aeronautics and Space Administration (NASA) in the last thirty years. The CEV is being developed to transport the crew safely from the Earth to the Moon and back again. The mission is similar to the Apollo approach with expanded capabilities and extended durations to support a larger crew and a longer mission. The Environmental Control and Life Support (ECLS) system, which includes the life support and thermal control systems, will have to meet these new requirements, taking advantage of the latest in component development where necessary and applicable.

Lewis, John F.↗

International Space Station (ISS) Low Pressure Intramodule Quick Disconnect Failures

A failure of an ISS intermodule Quick Disconnect (QD) during protoflight vibration testing of ISS regenerative Environmental Control and Life Support (ECLS) hardware led to the discovery of QD design, manufacturing, and test flaws which can yield the male QD susceptible to failure of the secondary housing seal and inadequate housing assembly locking mechanisms. Discovery of this failure had large implications when considering that currently there are 399 similar units on orbit and approximately 1100 units on the ground integrated into flight hardware. Discovery of the nature of the failure required testing and analysis and implementation of a recovery plan requiring part screening and review of element level and project hazard analysis to determine if secondary seals are required. Implementation also involves coordination with the Nodes and MPLM project offices, Regenerative ECLS Project, ISS Payloads, JAXA, ESA, and ISS Logistics and Maintenance.

Lewis, John F.↗

International Space Station Environmental Control and Life Support System On-Orbit Station Development Test Objective Status

The International Space Station (ISS) Environmental Control and Life Support (ECLS) system includes regenerative and non-regenerative technologies that provide the basic life support functions to support the crew, while maintaining a safe and habitable shirtsleeve environment. This paper provides a summary of the ECLS System On-Orbit Station Development Test Objective (SDTO) status from the start of assembly until the end of February 2003.

Williams, David E.↗

International Space Station Environmental Control and Life Support System Status: 2002-2003

The International Space Station (ISS) Environmental Control and Life Support (ECLS) system includes regenerative and non-regenerative technologies that provide the basic life support functions to support the crew, while maintaining a safe and habitable shirtsleeve environment. This paper provides a summary of the U.S. ECLS system activities over the past year, covering the period of time between April 2002 and March 2003. The ISS continued permanent crew operations, with the start of Phase 3 of the ISS Assembly Sequence. Work continued on the Phase 3 pressurized elements with Node 3 just completing its final design review so that it can proceed towards manufacturing and the continued manufacturing of the regenerative ECLS equipment that will be integrated into Node 3.

Wiliams, David E.↗

CO2 Compressor Requirements for Integration of Space Station Carbon Dioxide Removal and Carbon Dioxide Reduction Assemblies

This paper describes the analysis on integration requirements, CO2 compressor in particular, for integration of Carbon Dioxide Removal Assembly (CDRA) and CO2 Reduction Assembly (CRA) as a part of the Node 3 project previously conducted at JSC/NASA. A system analysis on the volume and operation pressure range of the CO2 accumulator was conducted. The hardware and operational configurations of the CO2 compressor were developed. The performance and interface requirements of the compressor were specified. An existing Four-Bed Molecular Sieve CO2 removal computer model was modified into a CDRA model and used in analyzing the requirements of the CDRA CO2 compressor. This CDRA model was also used in analyzing CDRA operation parameters that dictate CO2 pump sizing. Strategy for the pump activation was also analyzed.

Jeng, Frank F.↗