Engineering Papers⌕ Search

Engineering topics

Leute, Jennifer

Publications and source records attributed to Leute, Jennifer.

MACCS (MELCOR Accident Consequence Code System) User Guide Version 4.0, Revision 1

The MELCOR Accident Consequence Code System (MACCS) is used by Nuclear Regulatory Commission (NRC) and various national and international organizations for probabilistic consequence analysis of nuclear power accidents. This User Guide is intended to assist analysts in understanding the MACCS/WinMACCS model and to provide information regarding the code. This user guide version describes MACCS Version 4.0. Features that have been added to MACCS in subsequent versions are described in separate documentation. This User Guide provides a brief description of the model history, explains how to set up and execute a problem, and informs the user of the definition of various input parameters and any constraints placed on those parameters. This report is part of a series of reports documenting MACCS. Other reports include the MACCS Theory Manual, MACCS Verification Report, Technical Bases for Consequence Analyses Using MACCS, as well as documentation for preprocessor codes including SecPop, MelMACCS, and COMIDA2.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Scoping Analysis of MACCS Modeling Improvements for the Study of Protective Action Recommendations

In late 2004, the U.S. Nuclear Regulatory Commission (NRC) initiated a project to analyze the relative efficacy of alternative protective action strategies in reducing consequences to the public from a spectrum of nuclear power plant core melt accidents. The study is documented in NUREG/CR-6953, “Review of NUREG-0654, Supplement 3, ‘Criteria for Protective Action Recommendations for Severe Accidents,’” Volumes 1, 2, and 3. The Protective Action Recommendations (PAR) study provided a technical basis for enhancing the protective action guidance contained in Supplement 3, “Guidance for Protective Action Strategies,” to NUREG-0654/FEMA-REP-1, Rev. 1, “Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants, ” dated November 2011. In the time since, a number of important changes and additions have been made to the MACCS code suite, the nuclear accident consequence analysis code used to perform the study. The purpose of this analysis is to determine whether the MACCS results used in the PAR study would be different given recent changes to the MACCS code suite and input parameter guidance. Updated parameters that were analyzed include cohorts, keyhole evacuation, shielding and exposure parameters, compass sector resolution, and a range of source terms from rapidly progressing accidents. Results indicate that using updated modeling assumptions and capabilities may lead to a decrease in predicted health consequences for those within the emergency planning zone compared to the original PAR study.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Bounding Radionuclide Release Estimates for a Hypothetical Power Reactor Accident

The object of this study is to provide an estimate of bounding radionuclide releases from a nuclear power plant accident. The time frame of interest is the release phase from the initiating event through 30 days. The maximum credible initiating event includes an initial failure of the containment function with a primary system leak. All estimates include a complete loss-of-onsite power and no successful mitigative actions. The active safety injection systems are also assumed failed. The review considers the following commonly deployed reactor designs in the following order of interest: RBMK 1000, VVER-440, VVER-1000, 1000 MWe PWR, 1000 MWe BWR, BN-800, and the 600 MWe CANDU/PHWR. The review also considers spent fuel pool accident scenarios.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

AniMACCS User Guide

This SAND Report provides an overview of AniMACCS, the animation software developed for the MELCOR Accident Consequence Code System (MACCS). It details what users need to know in order to successfully generate animations from MACCS results. It also includes information on the capabilities, requirements, testing, limitations, input settings, and problem reporting instructions for AniMACCS version 1.3.1. Supporting information is provided in the appendices, such as guidance on required input files using both WinMACCS and running MACCS from the command line.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Identification and Resolution of Gaps in Mechanistic Source Term and Consequence Analysis Modeling for Molten Salt Reactors Salt Spill Scenarios

This report represents an assessment of the gaps in Mechanistic Source Term (MST) and consequence assessment modeling for Molten Salt Reactors (MSRs). The current capabilities for MELCOR and the MELCOR Accident Code System (MACCS) are discussed, along with updates needed in order to address specific needs for MSRs. A test plan developed by Argonne National Laboratories is discussed as addressing some of these gaps, while some will require additional attention. Further recommendations are made on addressing these gaps. This report satisfies the DOE NE Milestone M2RD-21SN0601061 to leverage MELCOR and MACCS to identify parameters of importance for source term assessments for salt spill experiments.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗