Engineering Papers⌕ Search

Engineering topics

Lelievre, F.

Publications and source records attributed to Lelievre, F..

A source for microhydrated biomolecules

We describe the construction of an apparatus for the production of a molecular jet of microhydrated biomolecules. Our design uses a water reservoir producing water vapour, which then passes through a separate reservoir containing a vapour of a sublimated biomolecule. The mixture coexpands into a molecular beam apparatus through a conical nozzle. Mass spectra showing water-adenin and water-uracil complexes are shown as typical examples. Suitable expansion conditions are reached without the use of an inert carrier gas.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Global recycling services for short and long term risk reduction

New schemes are being developed by AREVA in order to provide global solutions for safe and non-proliferating management of used fuels, thereby significantly contributing to overall risks reduction and sustainable nuclear development. Utilities are thereby provided with a service through which they will be able to send their used fuels and only get returned vitrified and compacted waste, the only waste remaining after reprocessing. This waste is stable, standard and has demonstrated capability for very long term interim storage. They are provided as well with associated facilities and all necessary services for storage in a demonstrated safely manner. Recycled fuels, in particular MOX, would be used either in existing LWRs or in a very limited number of full MOX reactors (like the EPR reactor), located in selected countries, that will recycle MOX so as to downgrade the isotopic quality of the Pu inventories in a significant manner. Reprocessed uranium also can be recycled. These schemes, on top of offering demonstrated operational advantages and a responsible approach, result into optimized economics for all shareholders of the scheme, as part of reactor financing (under Opex or Capex form) will be secured thanks to the value of the recycled flows. It also increases fuel cost predictability as recycled fuel is not subject to market fluctuations as much and allows, in a limited span of time, for clear risk mitigation. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

New approaches for MOX multi-recycling

Due to its low fissile content after irradiation, Pu from used MOX fuel is considered by some as not recyclable in LWR (Light Water Reactors). The point of this paper is hence to go back to those statements and provide a new analysis based on AREVA extended experience in the fields of fissile and fertile material management and optimized waste management. This is done using the current US fuel inventory as a case study. MOX Multi-recycling in LWRs is a closed cycle scenario where U and Pu management through reprocessing and recycling leads to a significant reduction of the used assemblies to be stored. The recycling of Pu in MOX fuel is moreover a way to maintain the self-protection of the Pu-bearing assemblies. With this scenario, Pu content is also reduced repetitively via a multi-recycling of MOX in LWRs. Simultaneously, {sup 238}Pu content decreases. All along this scenario, HLW (High-Level Radioactive Waste) vitrified canisters are produced and planned for deep geological disposal. Contrary to used fuel, HLW vitrified canisters do not contain proliferation materials. Moreover, the reprocessing of used fuel limits the space needed on current interim storage. With MOX multi-recycling in LWR, Pu isotopy needs to be managed carefully all along the scenario. The early introduction of a limited number of SFRs (Sodium Fast Reactors) can therefore be a real asset for the overall system. A few SFRs would be enough to improve the Pu isotopy from used LWR MOX fuel and provide a Pu-isotopy that could be mixed back with multi-recycled Pu from LWRs, hence increasing the Pu multi-recycling potential in LWRs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

New developments in RTR fuel recycling

As most utilities in the world, Research and Test Reactors (RTR) operators are currently facing two challenges regarding the fuel, in order to comply with local safety and waste management requirements as well as global non-proliferation obligation: - How to manage used fuel today, and - How fuel design changes that are currently under development will influence used fuel management. AREVA-La-Hague plant has a large experience in used fuel recycling, including traditional RTR fuel (UAl). Based on that experience and deep knowledge of RTR fuel manufacturing, AREVA is currently examining possible options to cope with both challenges. This paper describes the current experience of AREVA-La-Hague in UAl used fuels recycling and its plan to propose recycling for various types of fuels such as U{sub 3}Si{sub 2} fuel or UMo fuel on an industrial scale. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Opportunities for the Multi Recycling of Used MOX Fuel in the US - 12122

Over the last 50 years the US has accumulated an inventory of used nuclear fuel (UNF) in the region of 64,000 metric tons in 2010, and adds an additional 2,200 metric tons each year from the current fleet of 104 Light Water Reactors. This paper considers a fuel cycle option that would be available for a future pilot U.S. recycling plant that could take advantage of the unique opportunities offered by the age and size of the large U.S. UNF inventory. For the purpose of this scenario, recycling of UNF must use the available reactor infrastructure, currently LWR's, and the main product of recycling is considered to be plutonium (Pu), recycled into MOX fuel for use in these reactors. Use of MOX fuels must provide the service (burn-up) expected by the reactor operator, with the required level of safety. To do so, the fissile material concentration (Pu-239, Pu-241) in the MOX must be high enough to maintain criticality, while, in current recycle facilities, the Pu-238 content has to be kept low enough to prevent excessive heat load, neutron emission, and neutron capture during recycle operations. In most countries, used MOX fuel (MOX UNF) is typically stored after one irradiation in an LWR, pending the development of the GEN IV reactors, since it is considered difficult to directly reuse the recycled MOX fuel in LWRs due to the degraded Pu fissile isotopic composition. In the US, it is possible to blend MOX UNF with LEUOx UNF from the large inventory, using the oldest UNF first. Blending at the ratio of about one MOX UNF assembly with 15 LEUOx UNF assemblies, would achieve a fissile plutonium concentration sufficient for reirradiation in new MOX fuel. The Pu-238 yield in the new fuel will be sufficiently low to meet current fuel fabrication standards. Therefore, it should be possible in the context of the US, for discharged MOX fuel to be recycled back into LWR's, using only technologies already industrially deployed worldwide. Building on that possibility, two scenarios are assessed where current US inventory is treated; Pu recycled in LWR MOX fuels, and used MOX fuels themselves are treated in a continuous partitioning-transmutation mode (case 2a) or until the whole current UNF inventory (64,000 MT in 2010) has been treated followed by disposal of the MOX UNF to a geologic repository (case 2b). In the recycling scenario, two cases (2a and 2b) are considered. Benefits achieved are compared with the once through scenario (case 1) where UNF in the current US inventory are disposed directly to a geologic repository. For each scenario, the heat load and radioactivity of the high activity wastes disposed to a geologic repository are calculated and the savings in natural resources quantified, and compared with the once-through fuel cycle. Assuming an initial pilot recycling facility with a capacity of 800 metric tons a year of heavy metal begins operation in 2030, ∼8 metric tons per year of Pu is recovered from the LEUOx UNF inventory, and is used to produce fresh MOX fuels. At a later time, additional treatment and recycling capacities are assumed to begin operation, to accommodate blending and recycling of used MOX Pu, up to 2,400 MT/yr treatment capacity to enable processing UNF slightly faster than the rate of generation. Results of this scenario analysis study show the flexibility of the recycling scenarios so that Pu is managed in a way that avoids accumulating used MOX fuels. If at some future date, the decision is made to dispose of the MOX UNF to a geologic repository (case 2b), the scenario is neutral to final repository heat load in comparison to the direct disposal of all UNF (case 1), while diminishing use of natural uranium, enrichment, UNF accumulation, and the volume of HLW. Further recycling of Pu at the end of the scenario (case 2a) would exhibit further benefits. As expected, Pu-241 and Am-241 are the source of long term HLW heat load and Am-241 and Np-237 are the source of long term radiotoxicity. When advanced technology is available, introduction of minor actinide recycling, in addition to Pu recycling, by the end of this scenario, or sooner, would have a major impact on final repository heat load and long term radiotoxicity of the HLW. This scenario is also compatible with a gradual introduction of a small number of FR's for Pu management. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗