Engineering Papers⌕ Search

Engineering topics

Lawrence, Svetlana

Publications and source records attributed to Lawrence, Svetlana.

31 records · Page 2

Development of a Technical, Economic, and Risk Assessment Tool for the Evaluation of Work Reduction Opportunities

Efficient and cost-effective operation of a nuclear power plant (NPP) is essential to ensuring long-term economical and safe operation. Multiple cost saving opportunities exist, referred to here as work reduction opportunities (WRO). These WROs reduce plant operating costs by employing various cost-effective strategies (e.g., implementation of modern technologies). Identifying and objectively screening WROs is an essential task to help reduce overall costs. However, there is no comprehensive framework for assessing WROs in the nuclear industry and evaluating their impact on plant operations. This report presents a novel framework for systematically evaluating WROs from a technical, economic, and risk perspective. As NPPs continue to add new technology and implement modernization strategies into their current processes, potential WROs are commonly identified. Although most WROs have the potential to reduce costs, not all opportunities will result in significant cost savings due to unforeseen risks, large implementation costs, or benefits that fall short of expectations. Examples of this can be the result of a technology that is not fully developed, uncertainty in the amount of cost reduction, or difficulties introducing a new process into an organization. These uncertainties can manifest several ways and can result in a WRO with limited cost savings or even a loss of investment. The framework developed emphasizes the importance of effectively screening the WROs from a holistic perspective to objectively identify inefficiencies and ensure a positive impact to the organization. This report presents the Technical, Economic, and Risk Assessment (TERA) as a key methodology for the screening and evaluation of potential WROs. The TERA framework begins with a screening phase where the process is examined through a hybrid combination of Lean Six Sigma and Integrated Operations for Nuclear (ION) guiding principles. This framework examines the current processes using the Lean Six Sigma SIPOC (Suppliers, Inputs, Process, Outputs, Consumers) methodology but retains the ION key elements of People, Technology, Process, and Governance as important factors to the nuclear decision-making process. By combining the principles of Lean Six Sigma and ION, the developed screening process is specific to the nuclear industry in that it systematically evaluates WROs in order to implement new technology that is comprehensively evaluated. The TERA begins by mapping current processes as they relate to WROs and examining the inefficiencies. Furthermore, the created process map can be used to identify and evaluate potential solutions. Using key performance indicators (KPIs), the TERA evaluates each area—technology, economics, and risk—for uncertainties and to perform cost-benefit analysis. The results of the TERA are important KPIs that allow for an evaluation of different processes and technology implementations. This assessment enables decision-makers to compare various WROs based on metrics and then make informed decisions for which opportunity to implement first. This research includes not only the creation of the TERA framework, but also the evaluation of its performance. A case study for screening potential WROs at Southern Nuclear Company is presented that utilizes the TERA methodology. Through the use of TERA, various WROs were screened, and the solutions evaluated for cost-benefit expectations. The report concludes by summarizing the overall effort and implications for utility modernization. The performance of the screening and TERA are discussed as well as the impact on the nuclear industry. The TERA process enables utilities to evaluate and inform investment decisions for WROs and mitigate any potential risks. Through this research, we provide utilities with a valuable framework to optimize operations, reduce costs, and drive continuous process improvement.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

SIMPLIFIED COST-BENEFIT ANALYSIS OF SUBSEQUENT LICENSE RENEWAL

The license renewal (LR) and subsequent license renewal (SLR) processes, defined in 10 CFR 54, provide a framework for US nuclear plants to extend their operating licenses, but that process can ultimately result in costly, timely, resource intensive efforts to satisfy the requirements for license extension. This report provides areas where the cost, time, and resource efforts may be able to be reduced with additional analytical evaluation, model changes, inspection technique changes, and review of past inspection results.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Reliability and Integrity Management Scoping Study

The U.S. Nuclear Regulatory Commission (NRC) is developing the regulatory framework and technical expertise to support regulatory review of advanced non-light water reactor (ANLWR) designs. The NRC staff expects most of these designs to use the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code (BPVC) Section XI, Division 2 “Requirements for Reliability and Integrity Management (RIM) Programs for Nuclear Power Plants” for developing and implementing pre-service inspection (PSI) and in-service inspection (ISI) programs. The NRC recently endorsed ASME BPVC Section XI, Division 2 (BPV XI-2) in Regulatory Guide (RG) 1.246. This new ASME code is yet to be used in any applications submitted for NRC review. This report provides an overview of the current state of knowledge and practices within the industry for the use of BPV XI-2 for the development and implementation of a PSI and ISI program for non-light water reactors.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Solutions for Enhanced Legacy Probabilistic Risk Assessment Tools and Methodologies: Improving Efficiency of Model Development and Processing via Innovative Human Reliability Dependency Analysis

Probabilistic risk assessments (PRAs) are integral to nuclear power plant (NPP) operations, having tremendously benefitted the safety of the U.S. reactor fleet for decades. Insights obtained from the models have provided perspectives on a variety of applications, both at the plant and for the regulator. While these models are very useful, they are now being asked to represent and analyze aspects of the plant that were never envisioned by the initial PRA practitioners. Furthermore, heightened demands on the PRA models have led to increased computing power requirements. Additionally, as the complexity of the PRA models increased, the difficulty experienced by non-PRA experts in trying to understand these models, grasp the insights they provide, and effectively use that information has become problematic. The need for research to address key issues regarding PRA tools and methods has never been greater. Although the nuclear power industry has largely been well-served by these tools and methods, the underlying science is dated, remaining mostly unchanged for over two decades. Three areas were identified as most beneficial to address to maintain and improve the usefulness of the current practice legacy PRA tools: improved quantification speed, increased ability to efficiently model multi-hazard models, and improved modeling human action dependency in PRA. This report is focused on the third critical area, improvements in dependency analysis of human actions conducted as part of a typical human reliability assessment.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Summary of Technical Peer Review on the Risk Assessment Framework proposed in Report INL/RPT-22-68656 for Digital Instrumentation and Control Systems

This report summarizes the peer review activities initiated by Idaho National Laboratory (INL) during fiscal year (FY) 2023 for the evaluation and improvement of the methodology developed under the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a technical basis to support effective and secure DI&C technologies for digital upgrades/designs. A framework was proposed for this strategy, which aims to (1) provide a best-estimate, risk-informed capability to quantitatively and accurately estimate the risk impact of plant modernization, considering the introduction of high safety-significant safety-related (HSSSR) DI&C systems, (2) support and supplement existing risk-informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems, (4) assure the long-term safety and reliability of HSSSR DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. The R&D efforts of this project from FY 2019 through FY 2022 were focused on methodology improvement and demonstration of the proposed framework for the risk assessment and design optimization of safety-critical DI&C systems. Collaborations with the nuclear industry have been initiated to support the reliability and risk assessment of their DI&C systems by using the proposed framework. In FY 2023, the framework has reached to a point for a technical peer review and obtain stakeholder feedback. This peer review activity includes coordination of the reviews performed by a group of industry stakeholders, documentation of the peer review suggestions, providing resolutions and responses to the peer review comments. The objective of this technical peer review is to obtain representative feedback on the proposed framework to improve the technical qualities of its methodology and readiness for deployment to the industry. Feedback may identify potential areas for improvement and further development. The Subject Matter experts were invited to review the latest project report documenting the methodology developed in the project and provide evaluations of the technical qualities of the proposed framework and relevant methods. The reviewed project report is “An Integrated Framework for Risk Assessment of High Safety-significant Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants: Methodology and Demonstration” INL/RPT-22-68656 (short as “INL/RPT-22-68656” in this report). This peer review report documents the technical questions provided for technical peer review and introduces the technical peer reviewers from the stakeholders including nuclear utilities, regulators, and universities. Comments from technical peer reviewers and the resolutions and responses to these comments are outlined. Insights and lessons learned from the technical peer review are summarized in conclusions and future work. The primary audience of this report are DI&C designers, engineers, and probabilistic risk assessment (PRA) practitioners. This includes stakeholders, such as the nuclear utilities and regulators who consider the deployment and upgrade of DI&C systems, DI&C software developers and reviewers, and cybersecurity specialists.

99 GENERAL AND MISCELLANEOUS↗

Quantitative evaluation of common cause failures in high safety-significant safety-related digital instrumentation and control systems in nuclear power plants

Digital instrumentation and control (DI&C) systems at nuclear power plants (NPPs) have many advantages over analog systems. They are proven to be more reliable, cheaper, and easier to maintain given obsolescence of analog components. However, they also pose new engineering and technical challenges, such as possibility of common cause failures (CCFs) unique to digital systems. Here this paper proposes a Platform for Risk Assessment of DI&C (PRADIC) that is developed by Idaho National Laboratory (INL). A methodology for evaluation of software CCFs in high safety-significant safety-related DI&C systems of NPPs was developed as part of the framework. The framework integrates three stages of a typical risk assessment—qualitative hazard analysis and quantitative reliability and consequence analyses. The quantified risks compared with respective acceptance criteria provide valuable insights for system architecture alternatives allowing design optimization in terms of risk reduction and cost savings. A comprehensive case study performed to demonstrate the framework's capabilities is documented here in this paper. Results show that the PRADIC is a powerful tool capable to identify potential digital-based CCFs, estimate their probabilities, and evaluate their impacts on system and plant safety.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Reliability and Integrity Management Program Implementation Approach

Nuclear energy is the most reliable and environmentally sustainable energy source available today. In the United States, nuclear-generated power accounts for approximately 20% of total electricity and over 55% of clean energy. New advanced reactors have enormous potential to help further decarbonize the energy market, enhance grid resiliency, create new jobs, and build a stronger economy. More than 50 new reactors are being developed in the United States, and the federal government realizes an urgent need to deploy nuclear technologies to meet the country’s energy, environmental, and national security goals. As such, the U.S. Department of Energy launched multiple programs to support advanced reactor deployment. The research described in this paper explores implementation strategies for the Reliability and Integrity Management Program that directly supports the U.S. Department of Energy goal to enable the near-term deployment of the advanced reactor technologies. The project is conducted under the Regulatory Development Program for advanced reactors sponsored by the U.S. Department of Energy.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Risk-Informed Initiating Events and Accident Response

Emerging nuclear technologies and advanced reactor developments have brought proposed changes to the regulatory framework which can be leveraged to improve safety implementation and regulatory oversight processes at existing operating nuclear power plants. Specifically, opportunities exist to make plants’ regulatory compliance processes more efficient. This can be done by decreasing reliance on purely deterministic and prescriptive approaches and expansion of the use of risk informed and performance-based approaches to demonstrate reactor safety while achieving economic gains and efficiencies. In this report, we researched possibilities of economic benefits potentially available from the application of concepts associated with a modernized regulatory framework developed for advanced reactors to the existing light water reactors. We used timing factors to demonstrate the complexity of the existing risk assessments and described how these complexities affect regulatory compliance activities at the plants. We also investigated regulatory framework for both existing and new reactors and provided an overview of potential improvements. Lastly, we evaluated various areas of existing plant operations where modernization of compliance activities can offer substantial benefits.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

An Integrated Framework for Risk Assessment of High Safety Significant Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants: Methodology and Demonstration

This report documents the activities performed by Idaho National Laboratory (INL) during Fiscal Year (FY) 2022 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a technical basis to support effective and secure DI&C technologies for digital upgrades/designs. A framework was proposed for this strategy, which aims to (1) provide a best-estimate, risk-informed capability to quantitatively and accurately estimate the risk impact of plant modernization, considering the introduction of high safety-significant safety-related (HSSSR) DI&C systems, (2) support and supplement existing risk-informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems, (4) assure the long-term safety and reliability of HSSSR DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. To achieve these technical goals, the framework provides a means to address relevant technical issues by: (1) defining a risk-informed analysis process for DI&C upgrade, that integrates hazard analysis, reliability analysis, and consequence analysis, (2) applying risk-informed tools to address common cause failures (CCFs) and quantify corresponding failure probabilities for DI&C technologies, particularly software CCFs, (3) evaluating the impact of digital failures at the component level, system level, and plant level, and (4) providing insights and suggestions on designs to manage the risks, thus to support the development and deployment of advanced DI&C technologies on nuclear power plant (NPPs).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Common Cause Failure Evaluation of High Safety-significant Safety-related Digital Instrumentation and Control Systems

Digital instrumentation and control (DI&C) systems in nuclear power plants (NPPs) have many advantages over analog systems but also pose different engineering and technical challenges, such as potential threats due to common cause failures (CCFs). This paper proposes a Platform for Risk Assessment of DI&C (PRADIC) developed by Idaho National Laboratory for dealing with potential software CCFs in DI&C systems of NPPs. The methodology development of PRADIC on the quantitative evaluation of software CCFs in high safety-significant safety-related DI&C systems in NPPs is illustrated in this paper. In PRADIC, qualitative hazard analysis and quantitative reliability and consequence analysis are successively implemented to obtain quantitative risk information, compare with respective risk evaluation acceptance criteria, and provide suggestions for risk reduction and design optimization. A comprehensive case study was also performed and documented in this paper. Results show that PRADIC can effectively identify potential digital-based CCFs, estimate their failure probabilities, and evaluate their impacts to system and plant safety.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Bridging Equipment Reliability Data and Robust Decisions in a Plant Operation Context

In order to reduce operation and maintenance (O&M) costs, nuclear power plants (NPPs) are moving from corrective and periodic maintenance to predictive maintenance strategies. Such transition requires changes on the data that needs to be retrieved and on the type of decision processes to be employed. Advanced monitoring and data analysis technologies are essential to support predictive strategies. They can in fact provide precise information about health of a component, track its degradation trends, and provide information of its expected failure time. With such information, maintenance operations for a component can be performed right before its expected failure time. This dynamic context of O&M operations requires new methods to analyze data, propagate component health information from the component to the system level, and optimize plant resources. In this respect, the risk informed asset management (RIAM) project has been tasked to develop and test this new class of methods into a risk analytics toolset. This toolset consists of data analytics tools coupled with reliability methods designed to manage plant assets and performances in a predictive maintenance context. This report shows the latest improvements on such development and the initial testing of our methods on the three main research areas that the RIAM project is focusing on. These areas are the following: equipment reliability data analytics, system reliability modeling, and plant resources optimization methods. We show how the methods developed in these areas can support predictive maintenance strategies by: 1) analyzing equipment reliability data (either in numeric and textual form), 2) assessing component and system health through an innovative margin-based reliability approach, and 3) identifying the most critical components and set optimal maintenance schedule based on plant economic and operational constraints.

97 MATHEMATICS AND COMPUTING↗

Enhancement of Industry Legacy Probabilistic Risk Assessment Methods and Tools

Probabilistic risk assessments (PRAs) are integral to nuclear power plant (NPP) operations, having tremendously benefitted the safety of the U.S. reactor fleet for decades. Insights obtained from the models have provided perspectives on a variety of applications, both at the plant and for the regulator. While these models are very useful, they are now being asked to represent and analyze aspects of the plant that were never envisioned by the initial PRA practitioners. Furthermore, heightened demands on the PRA models have led to increased computing power requirements. Additionally, as the complexity of the PRA models increased, the difficulty experienced by non-PRA experts in trying to understand these models, grasp the insights they provide, and effectively use that information has become problematic. The need for research to address key issues regarding PRA tools and methods has never been greater. Although the nuclear power industry has largely been well-served by these tools and methods, the underlying science is dated, remaining mostly unchanged for over two decades. Three areas were identified as most beneficial to address to maintain and improve the usefulness of the current practice legacy PRA tools: improvement in quantification speed, increased ability to efficiently model multi-hazard models, and improvement in modeling human action dependency in PRA. This report provides the outcomes from the FY2021 research into these three areas, identifying potential technical gaps and solutions, and charting the next steps forward to address current PRA challenges.

42 ENGINEERING↗

Industry Level Integrated Fire Modeling Using Fire Risk Investigation in 3D (FRI3D)

The software Fire Risk Investigation in 3D (FRI3D) has been developed over the last 2 years to integrate 3D spatial modeling with existing fire probabilistic risk assessment (PRA) models and fire simulation codes. The goal of this research and development is to automate many of the fire analysis manual tasks to reduce industry efforts in the initial fire modeling and operational costs for the model maintenance and evaluations required during normal plant operations. The tasks for Fiscal Year (FY) 2021 include first testing the FRI3D modeling capabilities by importing an industry fire model into FRI3D and making a 3D model of a complex/high-risk significant area. (For this work, the switchgear room was chosen.) Then, the second task of FY 2021 is to develop a dynamic fire PRA process that can help optimize traditional fire PRA models. The switchgear room model will be used for the dynamic fire PRA work. This report describes the work and insights learned when using FRI3D software to model both a Nuclear Regulatory Report (NUREG) example models and a full industry switchgear room.

97 MATHEMATICS AND COMPUTING↗