Engineering PapersSearch

Engineering topics

L D Kennedy

Publications and source records attributed to L D Kennedy.

NASA Lunar Lander Reference Design

With increased emphasis on lunar exploration and scientific investigation, there is a desire to deliver a wide variety of payloads to the lunar surface. Many of these payloads will require the use of surface mobility capability such as a rover. NASA has combined spacecraft and subsystem engineers from across the Agency to develop a ‘pallet’ lander design intended to deliver and easily deploy a medium-sized payload (~300 kg) to the polar regions of the Moon. The lander provides power to the payload from transit soon after lunar landing. The lander is not intended to survive the lunar night. The design of the lander was based on a minimum set of level 1 requirements where traditional risk, mass, and performance trade parameters were weighed lower than cost. In other words, the team did not sacrifice ‘good enough’ for ‘better’ or ‘best.’ As a NASA class D spacecraft (as defined in NPR 8705.4, Risk Classification for NASA Payloads, the lander employs single-string (i.e., zero-fault-tolerant) systems as a baseline. The design utilizes existing technologies and components where possible, though some enhancements have been targeted in areas such as precision autonomous landing and low-cost structural design/fabrication. It is important to note that these and other derived technologies are extensible to other lander designs and missions. This TP describes the requirements and approaches upon which the lander design is based; discusses key design decisions, analyses, and trades used to derive the design; provides a snapshot of each major subsystem; and identifies open items, issues, and challenges for which work is continuing.

L D Kennedy

NASA’s Human Landing System: Enabling the Next Generation of Lunar Science

The Human Landing System (HLS) is the mode of transportation that will take astronauts to the lunar surface as part of NASA's Artemis exploration program. HLS also serves as a research platform both on the surface and in lunar orbit, enabling critical scientific investigations on and of the Moon. With support at NASA centers around the country, the HLS program, based at Marshall Space Flight Center in Huntsville, Alabama, is working closely with its commercial partners throughout the development process to design and build innovative and technically advanced lunar landers – new vehicles designed for the modern era of space travel – leveraging decades of human spaceflight experience and the speed of the commercial sector. In 2019, NASA asked U.S. industry for proposals to design and develop a human lander for the first human mission to the lunar surface under Artemis. Initial contracts were awarded to Blue Origin Federation, Dynetics, and SpaceX to advance their designs. Following the execution of the ten-month Base Period, NASA announced in April 2021 that the agency selected SpaceX to move forward with its human landing system [1] and land the first two astronauts on the lunar surface during the Artemis III mission. Following two protest periods, NASA awarded the contract, known as Option A, to SpaceX in July 2021 and resumed work in November 2021 (Fig. 1). In parallel, the HLS program has been preparing for the acquisition that will procure regular crewed transportation to the lunar surface following Artemis III. NASA released a request for information (RFI) in July 2021 asking U.S. industry for feedback to help inform the future solicitation, known as Lunar Exploration Transportation Services (LETS) [2]. Also in July 2021, NASA released the NextSTEP-2 Appendix N broad agency announcement soliciting new work from U.S. industry to mature their HLS designs and perform risk reduction activities in advance of the LETS procurement [3]. NASA selected Blue Origin Federation, Dynetics, Lockheed Martin, Northrop Grumman, and SpaceX to participate [4]. This work will also help better inform the LETS procurement and prepare industry to propose. NASA hopes to release a draft request for proposals (RFP) in Spring 2022.

R C Weber